My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/07/06 Council Minutes
>
Council Minutes
>
2011/07/06 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 4:04:34 PM
Creation date
9/29/2020 5:19:26 PM
Metadata
Fields
Template:
Council Minutes
Date
7/6/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 6,2011 <br /> BID AWARD—BOND STREET WATER MAIN REPLACEMENT <br /> Moved by Council Member Roberts,seconded by Council Member <br /> Stonecipher that the contract for the Bond Street Water Main <br /> Replacement project be awarded to the lowest responsive bidder, <br /> BSL Utility,Inc.,Snohomish,WA,based upon their unit prices bid <br /> extended for en estimated total of$215,547.70 including Washington <br /> State sales tax as received et the bid opening held at 2 p.m.,June 21, <br /> 2011. <br /> • <br /> Roll was called with all council members voting yes except Council <br /> Members Moore,Halloe end Gipson who were excused. • <br /> Motion carried. <br /> The City Council meeting adjourned at 6.:47 p.m.•Yn91es/ <br /> • <br /> • <br /> Deputy City Clers '/ <br /> Read and approved as printed. - �✓ <br /> Council President • <br /> 200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.