Laserfiche WebLink
October 26,2011 <br /> Study at the Water Pollution Control Facility In the amount of <br /> $53,600.00. <br /> Roll was called with all council members voting yes. <br /> Motion carried. <br /> RID AWARD—WATER TRANSMISSION LINE 4 CATHODIC <br /> PROTECTION <br /> Moved by Council Member Ha los,seconded by Council Member <br /> Roberts that the contract for the Water Transmission Line 4 Cathodic <br /> Protection Project be awarded to the lowest responsive bidder,SRV <br /> Construction,Inc.,Oak Harbor,WA,based upon their proposal for a <br /> total of$1,260,726.60 as received at the bid opening held at 2 p.m. <br /> October 14,2011. <br /> Roll was celled with all council members voting yes. <br /> Motion carried. <br /> AMENDMENT—SMITH ISLAND/UNION SLOUGH RESTORATION SITE <br /> MONITORING <br /> Moved by Council Member Roberts,seconded by Council Member <br /> Nielsen to authorize the Mayor to sign Smith Island/Union Slough <br /> Restoration Site Monitoring Services Amendment No.3 to the <br /> professional services agreement with Jones and Stokes extending <br /> the date of the contract. <br /> Roll was called with all council members voting yea. <br /> Motion carried. <br /> 296 <br />