My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/09/30 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/09/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2020 3:58:48 PM
Creation date
9/30/2020 7:19:00 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/30/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />REQUEST FOR STATEMENT OF QUALIFICATIONS <br />2022 COMPREHENSIVE SEWER PLAN <br />The City %J Everett is requesting Statements of Qualifications (SOQ0) from qualified consultants <br />for preparation of a new Comprehensive Sewer Plan (Plan). The work to be performed by the <br />consultant will consist of preparing a new Plan for the City of Everett. The work will conform to <br />the applicable sections of Chapter 173-240 Washington Administrative Code (WAC) and as <br />further detailed in the Washington State Department of Ecology (WSDOE) document "Criteria <br />For Sewage Works Design". At a minimum the Plan shall address the following: <br />• General description of the location and condition of the existing treatment and disposal <br />facilities, local service areas and the collection system to serve those areas including <br />monitoring and control facilities, discharges and overflow locations. <br />• Update the existing Sewer Model (City wide) to evaluate the capacity and to recommend <br />improvements to the existing sewer system. Provide flow monitoring for calibration of <br />model. <br />• Provide updated, climate change adjusted, storm series for basis of evaluation of CSO <br />compliance and as design basis for future conveyance system sizing in the combined <br />sewer area. <br />• Evaluate the anticipated needs for future facilities and services, compliance with existing <br />or new regulations, population growth, water quality problems, etc. <br />• Descriptions of future facilities, timing, cost of construction, and financing. <br />• Evaluate needs for a condition assessment and pipeline rehabilitation program. <br />• Identify, quantify and prioritize major capital needs over a twenty four-year planning <br />period with emphasis on the next 6-year planning cycle. <br />Minimum SOQ Information Required: <br />• The firm's experience in the preparation of Comprehensive Sewer Plans. <br />• The experience of the proposed project manager and individuals who will be working on <br />the preparation of the Plan <br />• An understanding of the sewage collection and treatment issues facing the City. <br />• Approach to managing and completing the project <br />• A proposed draft outline of the table of contents of the Plan. <br />• A draft schedule for the preparation of the Plan. <br />• Approach to communicating with the client. Be specific about what is communicated <br />and the form and frequency of your communication. <br />Submittals shall be 25 pages or less of 11-point font, including any resumes and cover letter. No <br />further written information is available from the City. The submittal shall be emailed to <br />aroshak@everettwa.gov. The deadline for submittals is 4:00 p.m., Friday, October 30, 2020. <br />
The URL can be used to link to this page
Your browser does not support the video tag.