|
� _ _ ,
<br /> - 4
<br /> ,
<br /> ROOM FINISH SCHEDULE �
<br /> Nelco Architecture, Inc.
<br /> FLOOR BASE WALLS CEILING
<br /> ROOM ROOM NORTH EAST SOUTH WEST REMARKS �
<br /> SUBSTRATE 1200 Fifth Ave.
<br /> # NAM E MATERIAL FINISH FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL HEIGHT suite 1300
<br /> Seattle, WA 98101
<br /> 101 RECEPTION EXIST CPT-1/WOM-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACP t9'-0" AFF Phone: (206)408-8500
<br /> WWW.NELSONWORLDWIDE.COM
<br /> 102-105 OFFICE EXIST CPT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 q�p t9'-0" AFF
<br /> 106 IT ROOM EXIST VCT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 A�p t9'-0" AFF
<br /> 107 BREAK ROOM EXIST VCT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 A�p t9'-0" AFF
<br /> 108 DRIVERS EXIST VCT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 A�p t9'-0" AFF
<br /> 109-110 SINGLE OCCUPANCY TOILETS EXIST R-1 R-1 GWB PT-1/PL-1 GWB PT-1/PL-1 GWB PT-1/PL-1 GWB PT-1/PL-1 GWB t$'-0" AFF
<br /> 111 MONEY ROOM EXIST VCT-1 B-1 GWB AF-1 GWB AF-1 GWB AF-1 GWB AF-1 �Wg t9'-0" AFF
<br /> 112-115 OFFICE EXIST CPT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 q�p t9'-0" AFF
<br /> 116 WORK/COPY EXIST CPT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 q�p t9'-0" AFF
<br /> 117 OPEN WORK EXIST CPT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 A�p t9'-0" AFF
<br /> 118-119 OFFICE EXIST CPT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 q�p f9'-0" AFF
<br /> 120 WAREHOUSE EXIST SLR-1 -- GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 OPEN OPEN
<br /> 121-122 SINGLE OCCUPANCY TOILETS EXIST R-1 R-1 GWB PT-1/PL-1 GWB PT-1/PL-1 GWB PT-1/PL-1 GWB PT-1/PL-1 �WB t8'-0" AFF
<br /> 123 HALLWAY EXIST CPT-1 B-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 A�p t9'-0" AFF
<br /> FINISH SPECIFICATIONS: ROOM FINISH GENERAL NOTES. CLIENT
<br /> FLOOR FINISHES: WALL FINISHES: WALL BASE: 1. ALL FINISH SELECTIONS IDENTIFIED IN LEGENDS, SCHEDULES, AND
<br /> SPECIFICATIONS ARE NOT SUBJECT TO 'OR EQUAL' SUBSTITUTIONS U.N.O. THE
<br /> FLOOR FINISH TO BE CPT-1, UON WALL FINISH TO BE PT-1, UON WALL BASE TO BE B-1, UON CONTRACTOR AND SUBCONTRACTORS SHALL SUBMIT PRODUCTS AND FINISHES
<br /> CPT CARPE7, BROADLOOM OR TILE pT PAINT(GENERAL) AS INDICATED IN THE DOCUMENTS.
<br /> 1 SHAW CONTRACTOR GROUP � SHERWIN WILLIAMS, TBD e RESILIENT BASE 2. NOTIFY ARCHITECT OF SCHEDULED FINISHES THAT ARE UNAVAILABLE OR
<br /> TBD 1 ROPPE,TBD, 4 DISCONTINUED AT THE EARLIEST OPPORTUNITY SUCH THAT A SUBSTITUTION
<br /> CAN BE SELECTED WITHOUT JEOPARDIZING THE CONSTRUCTION SCHEDULE
<br /> 8R RESILIENT SHEET FLOORING FRP FRP (WAINSCOT) MILLWORK FINISHES: 3. REFER TO THE MATERIAL SCHEDULE FOR MANUFACTURER, PRODUCT/SIYLE
<br /> 1 ARMSTRONG, CONNECTION CORLON 1 WHITE NAME, COLOR SPECIFICATION.
<br /> TBD p� PLASTIC LAMINATE (BASE &/OR UPPER) 4. INSTALL ALL FINISH MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S BERTCH CAPITAL
<br /> � TBD RECOMMENDED SPECIFICATIONS, SURFACE PREPARATION, ADHESIVES AND
<br /> VCT VCT AF ACOUSTICAL FABRIC BACKINGS: INCLUDING WALLCOVERINGS, COATINGS, FLOORING MATERIALS, PARTNERS
<br /> 1 ARMSTRONG, STANDARD EXCELON � SOUND CHANNELS LAMINATES, ETC.
<br /> TBD PEWTER 19-58 P� PLASTIC LAMINATE (COUNTERTOP) 5. PREPARE ALL SURFACES TO RECEIVE NEW FINISH SCHEDULED, TYPICAL 8210-164THS AVE NE, SUITE 200
<br /> e TBD THROUGHOUT. CONCRETE SLAB TO RECEIVE NEW SEAL WHERE SAW-CUT AND REDMOND, WASHINGTON 98052
<br /> WOM WALK-OFF MATT PATCHED.
<br /> � QUILL,TUFT 2 WINDOW FINISHES: 6. ALL WALLS (EXISTING AND NEW)TO BE PT-1, UON. PROJECT:
<br /> TBD PLASTIC LAMINATE (WAINSCOT) 7, RUBBER BASE, B-1 THROUGHOUT, UON. BASE SHALL RUN CONTINUOUSLY. SEAWAY B -
<br /> 1� WINDOW TREATMENT; ROLLER SHADES PL Tgp g, �qRPET, CPT-1 THROUGHOUT, UON.
<br /> SLR SEALED CONCRETE e1 MECHOSHADE o � 9. INTERIOR GWB CEILINGS AND SOFFITS TO BE PT-1 LATEX WITH FLAT FINISH COMPASS CANTEEN
<br /> ECOVEIL 1550,3/o OPEN,MANUAL �
<br /> 1 EXISTING, CLEAR OPERATION,INSIDE MOUNT, UON. TOILETROOM GWB CEILINGS AND SOFFITS TO BE PT-1, LATEX ENAMEL �
<br /> CONTINUOUS VALANCE WITH SEMI-GLOSS FINISH, UON.
<br /> 10. SEE REFLECTED CEILING PLANS FOR CEILING FINISHES, CEILING TILE AND GRID
<br /> sPEciFzcaTioNs. SEAWAY CENTER - BUILDING B
<br /> 11. ALL GWB SURFACES TO BE SMOOTH FINISN AND RECIEVE TWO COATS OF LATEX
<br /> PAINT WITH EGGSHELL FINISH. EVERET�, WA
<br /> 12. ALL GWB SURFACES IN RESTROOMS AND WET WALLS IN BREAK AREA AND
<br /> COFFEE AREA SHALL RECEIVE ONE (1) COAT OF LATEX SEMI-GLOSS ENAMEL Description: No: Date:
<br /> OVER ONE (1) COAT OF PVA SEALER. PERMIT REVIEW SET 10/25/2019
<br /> 13. GWB SURFACES TO RECEIVE LEVEL 4 FINISH PRIOR TO PAINTING, UNO. REFER
<br /> TO FINISH LEGEND FOR EXCEPTIONS.
<br /> 14. LEVEL 2/FIRETAPE FINISH ON WAREHOUSE SIDE OF OFFICE TI, UNLESS NOTED
<br /> OTHERWISE.
<br /> 15. ALL PAINT MATERIALS, PREPARATION AND WORKMANSHIP SHALL CONFORM TO
<br /> REQUIREMENTS OF THE LATEST EDITION OF THE ARCHITECTURAL PAINTING
<br /> SPECIFICATION MANUAL BY THE MASTER PAINTERS INSTITUTE. THE PAINTING
<br /> SUBCONTRACTOR SHALL ENSURE THAT ALL PAINTS COMPLY WITH THE
<br /> MUNICIPAL &STATE CODES AND BUILDING REGULATIONS FOR LOW VOC
<br /> EMISSIONS.
<br /> 16. REFER TO DOOR SCHEDULE SHEET A6.1 FOR DOOR AND DOOR FRAME FINISHES.
<br /> 17. WHERE INTERIOR DOOR AND DOOR FRAMES ARE TO BE PAINTED, COLOR TO
<br /> MATCH ADJACENT WALL SURFACE. ,
<br /> 18. PLASTIC LAMINATE, PL-1 AT ALL EXPOSED SURFACES OF BASE AND UPPER
<br /> CABINEfS, UON. PLASTIC LAMINATE PL-2 AT ALL COUNTERTOPS AND
<br /> BACKSPLASHES, UON.
<br /> 19. REFER TO THIS SHEET FOR FINISH LEGEND&SCHEDULE
<br /> 20. FLOOR MATERIAL TRANSITIONS AT DOOR OPENINGS ARE TO BE CENTERED
<br /> BELOW THE DOOR IN THE CLOSED POSITION, UNLESS NOTED OTHERWISE. SEE
<br /> ALSO TRANSITION DETAILS THIS SHEET.
<br /> 21. PROVIDE TRANSITIQN STRIPS AT ALL FLOORING MATERIAL CHANGES, UNLESS
<br /> NOTED OTHERWISE PER 6/A6.1. RESILIENT TRANSITION STRIPS TO MATCH BASE
<br /> COLOR U.N.O. WHEN PROVIDED, REFER TO PLAN FOR ADDITIONAL DETAIL
<br /> LOCATIONS.
<br /> 22. WHERE FLOOR FINISH THICKNESS REQUIRES, FLOAT FLOOR SLAB AT FINISH
<br /> TRANSITION AREAS A MINIMUM OF 2'-0" OR TO A ACHIEVE A MAXIMUM SLOPE
<br /> OF 1:20 (WHICHEVER IS GREATER)TO ACHIEVE A UNIFORM AND FLUSH SEAL:
<br /> TRANSITION BETWEEN FINAL FINISHED SURFACES.
<br /> 23. ACCESS PANELS, VISIBLE COVES OR ENCASEMENTS, VISIBLE ELECTRICAL ��,��
<br /> PANELS, ETC. TO SHALL BE PAINTED TO MATCH ADJACENT SURFACES. RE- TERED
<br /> 24. ALL INTERIOR WALL&CEILING FINISHES AND TRIM OF PUBLIC AREAS TO A HITECT
<br /> COMPLY WITH CLASS A MATERIAL CLASSIFICATION; FLAME SPREAD RATING 0
<br /> TO 25, SMOKE DEVELOPED 200. ALL INTERIOR WALL AND CEILING FINISHES
<br /> AND TRIM IN NON PUBLIC AREAS TO COMPLY WITH CLASS B MATERIAL � G
<br /> CLASSIFICATION; FLAME SPREAD RATING 26-75, SMOKE DEVELOPED 450, PER STATE OF YI�AS TON
<br /> IBC CHAPTER 8.
<br /> 25. PROVIDE NEW WINDOW TREATMENT, WT-1 AT ALL EXTERIOR WINDOWS,
<br /> TYPICAL THROUGHOUT, UON. ALTERNATE COST FOR WT-2, INSTEAD OF WT-1.
<br /> 26. ALTERNATE PRICE TQ REPLACE WINDOW BLINDS (BL-1, 1", METAL MINI BLIND
<br /> STANDARD COLOR) AT ALL EXTERIOR WINDOWS. ALTERNATE PRICE TO
<br /> UPGRADE TO ROLLER SHADES (BL-2, INSIDE MOUNT, TEKSOLAR, MANUAL
<br /> OPERATION, 5% OPEN TEK-FABRIC 95; MUSHROOM OR EQUIVALENT WITH CITY STAMP.
<br /> ALUMINUM FASCIA)
<br /> ����Ei`{ ��' �i✓����'�
<br /> ��1/�{�Ui1�D F�,�''� ��F����� � .
<br /> FINISH SCHEDULE
<br /> Proj. No: 19.0000887.000 Reviewed By: JAKB
<br /> A6 . 2
<br />
|