Laserfiche WebLink
GENERAL NOTES SYMBOLS ABBREVIATIONS � <br /> THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER 49. UPON SUBSTANTIAL COMPLEfION OF WORK THE CONTRACTOR SHALL � ANGLE FLUOR FLUORESCENT PS PAINT SYSTEM ' <br /> ORDINANCES,CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR SEPARATE PERMITS,WHEN REQUIRED AND/OR WHEN WORK ITEMS ARE pREPARE A"PUNCHLIST"OF CORRECTIONS AND UNSATISFACTORY AND/OR A NDO WINDOW SYMBOL � CENTER LINE FM FACTORY MUTUAL PSF POUNDS PER S UARE FOOT <br /> ON THE DRAWINGS,AND REQUIRED BY LOCAL BUILDING AUTHORITIES.THE DESIGN/BUILD IN NATURE, SHALL BE OBTAINED BY THE CONTRACTOR FOR Q <br /> INCOMPLEfE WORK FOR REVIEW BY THE ARCHITECT. � DIAMETER OR ROUND FOC FACE OF CONCREfE PSI POUNDS PER S UARE INCH Nelco Architecture Inc. <br /> GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED MECHANICAL, PLUMBING, FIRE SPRINKLERS, ELECTRICAL AND FIRE ALARM. Q � <br /> 50. THE CONTRACTOR SHALL MAINTAIN AT THE SITE,ONE RECORD COPY OF ALL <br /> TO AS'THE CODE."THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, DESCRIPTIVE,DETAILED DESIGN AND REQUIRED SUBMITTAL DOCUMENTS # NUMBER OR POUND FOF FACE OF FINISH PT PRESSURE TREATED <br /> DRAWINGS,PERMITS, SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL <br /> CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR INFORMATION SHALL BE PROVIDED FOR REVIEW BY THE REGULATING J PENNY FOIC FURNISHED BY OWNER PTD PAPER TOWEL DISPENSER <br /> AUTHORITIES AND BY THE OWNER/TENANT/ARCHITECT FOR APPROVAL CHANGES DURING CONSTRUCTION.ACCESS TO THESE SHALL BE PROVIDED FOR COLUMN LINE/GRID LINE A INTERIOR ELEVATION(S) 1 <br /> INTERPRETATION PRIOR TO PERFORMING THE WORK. PERPENDICULAR INSTALLED BY CONTRACTOR PTD/R PAPER TOWEL DISPENSER <br /> 2. THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO PRIOR TO ANY WORK BEING PERFORMED. SEE SPECIFICATIONS FOR THE USE OF ALL TRADES,CLIENT REPRESENTATIVES AND THE ARCHITECT, <br /> DURING ALL PHASES OF CONSTRUCTION, .---- ELEVATION IDENTIFICATION � PLATE FOIO FURNISHED BY OWNER AND RECEPTACLE <br /> DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION;WHEN REQUIREMENT FOR DESIGN/BUILD FIRE SPRINKLER SYSTEM. SUBMIT PLAN D AX.X B <br /> 51. DURING THE COURSE OF CONSTRUCTION,ACTUAL LOCATIONS SHALL BE INSTALLED BY OWNER PTN PARTITION <br /> AND HOW DELIVERIES CAN BE MADE,WHAT PHASES AND TYPES OF TO AND OBTAIN PERMIT FROM THE AUTHORITY HAVING JURISDICTION FOR INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR ALL SHEET WHERE ELEVATION IS 1200 Fifth Ave. <br /> CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS,AND IN FIRE SPRINKLER SYSTEM INSTALLATION OR MODIFICATION. ALL WORK DRAWN AB ANCHOR BOLT FOS FACE OF STUD PTR PAPER TOWEL RECEPTACLE <br /> GENERAL ANY SPECIAL BUILDING RE UIREMENTS WHICH WILL AFFECT THE SHALL COMPLY WI�H CURRENT GOVERNING CODES. RUNS OF MECHANICAL AND ELECTRTCAI WORK INCLUDING CONCEALED WORK C Suite 1300 <br /> Q WHICH DEVIATES FROM THE DRAWINGS. UPON COMPLEi"ION OF THE PROJECT, AC ACOUSTICAL FS FULL SIZE PVMT PAVEMENT <br /> COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHALL 7 DOOR/RELITE NUMBER A/C AIR CONDITIONING FT FEEf Seattle, WA 98101 <br /> CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH CURRENT INCLUDING ALL PUNCHLIST ITEMS,THIS INFORMATION SHALL BE NEATLY CORRESPONDS TO ROOM ENTERING ACP ACOUSTICAL CEILING PANEL FTG FOOTING T UARRY TILE Phone: 206 408-8500 <br /> TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS,WHICH SHALL BE Q Q � � <br /> REGULATIONS,WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO GOVERNING CODES. NOTHING IN THESE DRAWINGS IS TO BE CONSTRUED AS MARKED"AS BUILT SET"AND COPIES SNALL BE PROVIDED TO BOTH THE 107B__ TITLEl ROOM IDENTIFICATION ACT ACOUSTICAL TILE FTIC FURNISHED BY TENANT WWW.NELSONWORLDWIDE.COM <br /> SUBMISSION OF BID. TO PERMIT WORK WHICH IS NOT CONFORMING TO CURRENT GOVERNING OWNER AND THE ARCHITECT.WITHIN THREE(3)WEEKS{15 BUSINESS DAYS) TITLE2 ADH ADHESIVE INSTALLED BY CONTRACTOR R RISER <br /> 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB- CODES. OF THE RECEIPT OF THE"AS BUILT SEf."APPROVAL FOR FINAL PAYMENT TO TITLE3 ROOM NAME ADJ ADJACENT FTIO FlJRNISHED BY TENANT RA RETURN AIR <br /> CONTRACTORS'RECEIPT OF COMPLEfE SEfS OF THESE DOCUMENTS,AS WELL ZZ, THE CONTRACTOR SHALL CREATE AND IMPLEMENT AN EROSION AND THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE SHOWN WHY O KEY NOTE ROOM# ROOM N0. AF ACCESS FLOOR INSTALLED BY OWNER RAD RADIUS <br /> AS ALL FUTURE ADDENDA,BULLETINS, FIELD DIRECTIVES AND CHANGE SEDIMENTATION CONTROL PLANFOR ALL SITE CONSTRUCTION ACTIVITIES SUCH APPROVAL HAS BEEN DENIED. AFF AT/ABOVE FINISH FLOOR FURR FURRING R&S ROD&SHELF <br /> ORDERS. ASSOCIATED WTTH THE PROJECT. 52. PRIOR TO THE COMPLETION OF THE WORK,THE CONTRACTOR SHALL <br /> 4. THE AIA STANDARD DOCUMENT"A201"TITLED"GENERAL CONDITIONS OF THE THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS' AH) AUTHORITY HAVING JURISDICTION FUT FtJTURE RB RESILIENT BASE <br /> CONTRACT FOR CONSTRUCTION"SHALL BE CONSIDERED PART OF THE REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAI PERMIT OR CATALOG,OPERATING INSTRUCTIONS, START-UP CHECK LISTS, MAINTENANCE WT PARTITION TYPE +8�'6�� FINISHED CEILING HEIGHT AL ALUMINUM FUTURE- FUTURE ROUGH IN ONLY RCP REFLECTED CEILING PLAN <br /> GENERAL CONDITIONS OF THIS WORK. LOCAL STANDARDS AND CODES,WHICHEVER IS MORE STRINGENT. INSTRUCTIONS AND SIMILAR DATA,AS WELL AS ALL GUARANTEE(S)FOR ALL ALT ALTERNATE RIO RD ROOF DRAIN <br /> 5. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT 23. ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE DEPARTMENT EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE AP ACCESS PANEL RD/O ROOF DRAIN OVERFLOW <br /> THE STORAGE OF MATERIALS AND SHALL PROVIDE PROTECTION AS NECESSARY PRIOR TO START OF CONSTRUCTION. CONTRACTOR UNDER THIS CONTRACT,AND SHALL ORIENT AND INSTRUCT REVISION NUMBER _ - PROPERTY LINE APC ACOUSTICAL PANEL CEILING GA GAGE REBAR REINFORCING BAR <br /> TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEFT OR DAMAGE 24. ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBI�ITY THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALl SUCH �( <br /> SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL OF THE CONTRACTOR, UNO EQUIPMENT. REVISION APPROX APPROXIMATE GALV GALVANIZED REF REFERENCE <br /> CONDITIONS AND WILL REPAIR&REPLACE DAMAGE OR LOSSES AT THE Z5. THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION, ARCH ARCHITECTURAL GB GRAB BAR REFR REFRIGERATOR <br /> CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER. HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT 53. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT CLOUD AROUND REVISION ASPH ASPHALT GC GENERAL CONTRACTOR REINF REINFORCED <br /> 6. WHERE AD]ACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL TO THE POINT OF USE,AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, THAT MOLD OR ASBESTOS IS UNCOVERED.THE OWNER SHALL RETAIN A �$ � NEW OR FINISHED CONTOURS GL GLASS OR GLAZING REQ�D REQUIRED <br /> BE OCCUPIED DURING THE CONSTRUCTION PERIOD,THE CONTRACTOR SHALL: CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR THE PROMPT BD BOARD <br /> A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF IDENTIFICATION TESTING TREATMENT REMEDIATION AND 5TORAGE OF THE BETW BETWEEN GLB GLU-LAM BEAM REV REVISION <br /> CONTRACT. ' � � MATCH LINE GND GROUND RH RIGHT HAND OR ROBE HOOK <br /> CONSTRUCTION OPERATIONS,ACCESS TO TENANT SPACES AND MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD CONSTRUCTION EXISTING CONTOURS BLK BLOCK <br /> 26. OF THE INEVITABLE WASTE THAT IS GENERATED,AS MANY OF THE WASTE �/� <br /> ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS PRACTICES.THE ARCHITECT SHALL BEAR NO RESPONSIBILITY FOR WORK - SHADED PORTION IS THE SIDE GR GRADE RESIL RESILIENT <br /> B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBL MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, SALVAGED,OR RELATED TO THESE MATERIALS. 71 BLDG BUILDING <br /> RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED. CONSIDERED BM BEAM GWB GYPSUM WALL BOARD RM ROOM <br /> ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING. CONTRACTOR SHALL COORDINATE WASTE MATERIALS HANDLING AND 54. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR 0 BRG BEARING RO ROUGH OPENING <br /> C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF SEPARATION FOR ALL TRADES.CONTRACTOR SHALL PROVIDE SEPARATION, LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS.THE 'L�� HB HOSE BIB RT RESILIENT TILE <br /> ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WITHOUT � WORK POINT, CONTROL POINT �• BOT BOTTOM <br /> PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL HANDLING,TRANSPORTATION, RECYCLING,SALVAGE,AND LANDFILLING FOR CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING '�• TOP OF WALL HC HOLLOW CORE OR HANDICAP RUB RUBBER <br /> ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH OR DATUM POINT BSMT BASEMENT HDR HEADER RW RAIN WATER <br /> FLOORS, MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT COMMINGLED IN DUMPSTERS ON-SITE AS LONG AS PROVISION IS MADE FOR MATERIALS. BUR BUILT UP ROOF HDWD HARDWOOD RWL RAIN WATER LEADER <br /> TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR. <br /> AT ALL OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC 55. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY 0 HDWE NARDWARE <br /> TRANSFER STATION MUST PROVIDE DOCUMENTATION REPORT TYPES OF INSURANCE AS RE UIRED BY ANY GOVERNING AGENCIES HAVING 1492 E UIPMENT NUMBER �'� <br /> SPACES.ALL ACTIVE AREAS SHALL BE KEPT CLEAN AND FREE FROM MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD. FINAL Q Q �L• TOP OF CURB HM HOLLOW METAL S SOUTH <br /> DEBRIS. JURISDICTION AND COMPLYING WITH STATUTORY REQUIREMENTS FOR CAB CABINET HORIZ HORIZONTAL <br /> D. ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF DESTINATION OF SORTED MATERIALS MUST AL50 BE REPORTED. DISABILIlY AND WORKMEN'S COMPENSATION. CB CATCH BASIN HR HOUR SC SOLID CORE , <br /> PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS BUILDING SECTION CBU CEMENTITIOUS BACKER UNIT SCD SEAT COVER DISPENSER <br /> DIVERSION GOALS: A MINIMUM 75%OF TOTAI PROJECT WASTE SHALL BE HT HEIGHT <br /> NECESSARY TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE X CEM CEMENT SCHD SCHEDULE <br /> DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES,AT A SECTION IDENTIFICATION HTG HEATING <br /> TO OTHER TENANTS,THE PUBLIC,AND TO PREVENT DAMAGE TO � TOP OF PAVEMENT SD SOAP DISPENSER <br /> MINIMUM, SHALL BE DIVERTED FROM LANDFILL. AX.X ,,5• CER CERAMIC <br /> ADJACENT CONSTRUCTION WHICH IS TO BE LEFf IN PLACE. Q HVAC HEATING/VENTILATION/ SECT SECTION <br /> E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL a. CLEAN DIMENSIONED WOOD, PALLEf WOOD SHEET WHERE SECTION IS DRAWN "�• � CFM CUBIC FEET PER MINUTE AIR CONDITIONING � <br /> MEASURES OF THE SHEEf MEfAL AND AIR CONDITIONING NATIONAL b. PLYWOOD,OSB,AND PARTICLEBOARD CFf CONDUCTIVE FLOOR TILE SF SQUARE FEET <br /> CONTRACTORS ASSOCIATION(SMACNA)IAQ GUIDELINES FOR c. CONCREfE CG CORNER GUARD HWH HOT WATER HEATER SHTG SHEATHING C��ENr: <br /> OCCUPIED BUILDINGS UNDER CONSTRUCTION,2ND EDITION 2007, d. CARDBOARD, PAPER, PACKAGING CHBD CHALK BOARD SIM SIMILAR <br /> ANSI/SMACNA 008-2008(CHAPTER 3). ?PROTECT STORED ON-SITE e. METALS IBC INTERNATIONAL BUILDING CODE SNK SINK <br /> f. GYPSUM DRYWALL(UNPAINTED) CI CAST IRON <br /> AND INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE. PROJECT ID INSIDE DIAMETER/ SLR SEALER <br /> NORTH CJT CONTROL JOINT <br /> F. If PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING g. ACOUSTIC TILE DETAIL SECTION DIMENSION SND SANITARY NAPKIN <br /> CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY h. PAINT X N CLF CHAIN LINK FENCE IEC INTERNATIONAL ELECTRIC DISPENSER <br /> REPORTING VALUE(MERV)OF 8 MUST BE USED AT EACH RETURN AIR i. GLASS �,X SECTION IDENTIFICATION PROJECT NORTH CLG CEILING CODE COUNCIL SNR SANITARY NAPKIN <br /> GRILLE. j. PLASTICS CJ CONSTRUCTION JOINT IFC INTERNATIONAL FIRE CODE <br /> k. CARPET AND PAD SHEET WHERE SECTION IS DRAWN RECEPTACLE <br /> 7. ALL CUTTING,CHASING, DRILLING OR DEMOLITION OF WALLS,SLABS, ETC. CLK CAULKING IG INSULATED GLAZING <br /> REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER I. BEVERAGE CONTAINERS CLO CLOSET SPEC SPECIFICATION <br /> IHM INSULATED HOLLOW METAL <br /> TOOLS SHALL BE PERFORMED AFfER REGUTAR BUSINESS HOURS ON AN CLR CLEAR SQ SQUARE ' <br /> 27. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY , „ <br /> OVERTIME BASIS IF NECESSARY, UNLESS THE BUILDING MANAGEMENT AND 9-0 DENOTES CHANGE IN IN INCH SST STAINLESS STEEL <br /> ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER,LIGHTING, CMU CONCRETE MASONRY UNIT <br /> ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMIITING ELEVATION INCL INCLUDE SSK SERVICE SINK <br /> OTHERWISE. HEATINGORVENTILATIONREQUIREDTOPROPERLYCONDUCTTHEWORK. ��_��� CNTR COUNTER INSUL INSULATION BERTCH CAPITAL <br /> 28. DIMENSIONS ARE TO FACE OF STUD,CONCRETE,OR MASONRY UON. CO CLEANOUT ST STONE/STONE TILE <br /> 8. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLEfE RESPONSIBILITY FOR INT INTERIOR PARTN E RS <br /> JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS DO NOT SCALE THESE DRAWINGS;WRITTEN DIMENSIONS SHALL GOVERN. DETAIL OR ENLARGED PLAN COL COLUMN STA STATION <br /> PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.THIS CONC CONCRETE IPC INTERNATIONAL PLUMBING CODE <br /> SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED, X STC SOUND TRANSMISSION <br /> CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT. DETAIL IDENTIFICATION CLASS <br /> REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE IIMITED TO AX.X CONSTR CONSTRUCTION 8210-164THS AVE NE, SUITE 200 <br /> NORMAL WORKING HOURS.THE CONTRACTOR SHALL PROVIDE PUBLIC Z9• LARGE SCALE DEfAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND SHEET WHERE DETAIL IS DRAWN PT JAN JANITOR STD STANDARD ' <br /> ELEVATIONS. FINISH SYMBOL CONT CONTINUOUS )T JOINT <br /> PROTECTION,AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES 30. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' 2 CORR CORRIDOR STL STEEL REDMOND, WASHINGTON 98052 <br /> HAVING JURISDICTION,UNTIL CLIENT ACCEPTANCE OF THE PREMISES. RECOMMENDATIONS.ANY DIFFICULTIES ARE TO BE REPORTED TO THE CPT CARPET STOR STORAGE <br /> 9. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION KIT KITCHEN PROJECT: <br /> AND MAINTENANCE OF ALL BRACING,SHORING, ENCLOSURES, BARRIERS OR ARCHITECT IMMEDIATELY. CT CERAMIC TILE STRL STRUCTURAL <br /> SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS 31. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL CTR CENTER KO KNOCK OUT SUSP SUSPENDED SEAWAY B - <br /> WORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE(1) KS KNEE SPACE SV SHEET VINYL <br /> DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK. YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS CY CUBIC YARD COM PASS CANTEEN <br /> 10. DURING THE ENTIRE CONSTRUCTION PERIOD,ALL EXITS, EXIT LIGHTING, OCCURRING IN THE GUARANTEED PERIOD SHALL BE CORRECTED AT NO SYM SYMMETRICAL / <br /> FIRE PROTECTION DEVICES AND ALARMS SHALL BE CONTINUOUSLY LAM LAMINATE <br /> MAINTAINED IN CONFORMANCE WITH LOCAL BUILDING CODE AND OTHER ADDITIONAL COST. DBL DOUBLE �QV LAVATORY T TREAD <br /> GOVERNING ENTITY REQUIREMENTS. UNO,ALL EXISTING, SERVICES AND 32. THE CLIENT,ARCHITECT,CONSULTANTS AND ALL INSPECTORS FROM DEPT DEPARTMENT LB LAG BOLT TB TOWE� BAR <br /> PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB S1TE AT ALL DF DRINKING FOUNTAIN(W/O COOLER) <br /> DEVICES SHALL REMAIN ACTIVE. LF LINEAL FOOT T&B TOP &BOTTOM <br /> 11. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE TIMES DURING NORMAL WORKING HOURS. DIA DIAMETER SEAWAY CENTER - BUILDING B <br /> 33. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS,AND LG LENGTH TG TEMPERED GLASS <br /> BUILDING OWNER. INCLUDING, BUT IS NOT IIMITED T0,WINDOWS, FLOOR EQUIPMENT NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS DIAG DIAGONAL LH LEFT HAND THK THICK EVEREfT� WA <br /> AND CEILING FINISHES, PUBLIC TOILEfS, ELEVATORS, DOORS&BUCKS, NOT IN CONTRACT(N.I.C.). DIM DIMENSION LINO LINOLEUM TIG TEMPERED INSULATED <br /> ELECTRICAL AND AIR-CONDITIONING EQUIPMENT.THE CONTRACTOR SHALL 34. MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER DISP DISPENSER LKR LOCKER GLAZING Description: No: Date: <br /> PROTECT ADJOINING PROPERIY. DAMAGE CAUSED BY THE CONTRACTOR'S CONSTRUCTION OF ANY PART OF THE WORK,SHALL BE INCLUDED AS IF THEY DN DOWN LT LIGHT TO TOP OF <br /> WORK OR WORKMEN MUST BE MADE GOOD,IN A TIMELY FASHION. WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON. DR DOOR OR DRAIN PERMIT REVIEW SET 10/25/2019 <br /> PATCHING AND REPtACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT TOC TOP OF CONCRET"E <br /> THE COST OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY WHERE THE CONTRACT,CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY DTL DETAIL <br /> WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE DWR DRAWER MACH MACHINE TOP TOP OF PAVEMENT <br /> RESPONSIB�E FOR ALL SUB-CONTRACTORS. IF THE CONTRACTOR FAILS TO BUILDING CODE,OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE MATL MATERIAL TOS TOP OF STEEL <br /> COMPLEfE THE REPAIRS IN A TIMELY FASHION,SAID REPAIRS WILL BE MADE WORK,THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE DS DOWNSPOUT MAX MAXIMUM TOSL TOP OF SLAB <br /> BY A CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK FURNISHED IN ALL CASES. DW DISHWASHER MECH MECHANICAL TOW TOP OF WALL <br /> CHARGED ACCORDINGLY. 35. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH DWG DRAWING <br /> 12. THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD, MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE-CONSUMER(POST- MEZZ MEZZANINE TPD TOILET PAPER DISPENSER <br /> THE TENANT,AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS MFR MANUFACTURER TPH TOILET PAPER HOLDER <br /> FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL INDUSTRIAL)AND POST-CONSUMER RECYCLED CONTENT.THE CONTRACTOR E EAST MH MANHOLE TPTN TOILET PARTITION ' <br /> OR FOR PERSONAL INJURIES(INCLUDING DEATH)ARISING OUT OF,OR SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE BUDGET <br /> AND SHALL NOT PURCHASE ANY COST-ADDING MATERIAL OR PAY A PREMIUM EA EACH MIN MINIMUM TS TUBULAR STEEL <br /> SUFFERED WHILE ENGAGED IN,OR CAUSED,IN WHOLE OR IN PART, BY THE (MORE THAN FAIR MARKET VALUE)WITHOUT PROJECT MANAGER AND OWNER EB EXPANSION BOLT MIR MIRROR TV TELEVISION <br /> EXECUTION OF THE WORK;THE CONTRACTOR SHALL WELL AND TRULY ACKNOWLEDGEMENT AND APPROVAL. EJ EXPANSION JOINT MISC MISCELLANEOUS TYP TYPICAL <br /> DEFEND THE IANDLORD,TENANT AND ARCHITECT AND SHALL PAY ALL 36. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH EL ELEVATION <br /> MONIES AWARDED FOR SUCH DAMAGES OR INJURIES(INCLUDING DEATH),ALL MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT E�EC ELECTRIC MLD MOLDING <br /> COSTS INCLUDING ATTORNEY'S FEES SUSTAINED,AND SHALL OBTAIN A FULL MRGWB MOISTURE RESISTANT GWB UL UNDERWRITERS LABORATORY <br /> ACQUAINTANCE AND RELEASE IN FAVOR OF THE LANDLORD,TENANT AND SITE WHERE AVAILABLE,WITHIN BUDGET,WITHIN FAIR MARKET VALUE AND ELEV ELEVATOR MTD MOUNTED UNF UNFINISHED <br /> ARCHITECT, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE DO NOT PRESENT RISK TO THE PROJECT SCHEDULE. EM ENTRY MAT MTL METAL UON UNLESS OTHERWISE NOTED <br /> 37. FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE <br /> OFTHE LANDLORD,TENANT,ARCHTTECT, ITS AGENTS OR EMPLOYEES. EMER EMERGENCY MULL MULLION UR URINAL <br /> 13. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE OF BOARD, MDF,PLYWOOD,OSB AND WOOD DOORS,THE CONTRACTOR SHALL ENCL ENCLOSURE OR ENCLOSED <br /> ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION CHOSEN FURNISH MATERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE. EP ELECTRICAL PANEL <br /> BY THE CONTRACTOR OR ANY SUB-CONTRACTORS, NOR SHALL THE ARCHITECT 38. DEfAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR N NORTH VAR VARIES <br /> MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS. EWC ELECTRIC WATER COOLER NIC NOT IN CONTRACT VCT VINYL COMPOSITION TILE <br /> GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS. REQUIRED MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. EPX EPDXY NO/# NUMBER <br /> 14. THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE VERT VERTICAL <br /> DURING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK 39. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS EQ EQUAL NOM NOMINAL VEST VESTIBULE <br /> FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY,THE AND TRADESPERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN EQUIP EQUIPMENT NTS NOT TO SCALE VIN VINYL <br /> CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA ACCORDANCE WITH THE BEST TRADE PRACTICES. EST ESTIMATE <br /> INCLUDING, BUT NOT LIMITED T0,WET WIPING OF FURNITURE,AND 40. THE CONTRACTOR SHALL CONFIRM THE AVAIIABILITY AND DELIVERY TIMES EX EXPANSION OA OVERALL VWC VINYL WALL COVERING <br /> CASEWORK,WASHING AND WAXING OF VCT FLOORING AND THE VACUUMING FOR ALL SPECIFIED MATERIALS&EQUIPMENT REQUIRED TO PERFORM THE OC ON CENTER <br /> OF CARPET.ALL CLEANING SHALL BE IN ACCORDANCE WITH WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS.SHOULD THE EXIST EXISTING OD OUTSIDE DIAMETER/ W WEST <br /> MANUFACTURERS'RECOMMENDATIONS AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON-TIME EXT EXTERIOR W/ WITH <br /> DIMENSION <br /> 15. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL COMPLETION OF THE PROJECT,THE CONTRACTOR SHALL NOTIFY THE OFF OFFICE W/O WITHOUT � <br /> ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO FA FIRE ALARM <br /> SUB-CONTRACTORS AND SHALL PERFORM SUCH MISCELtANEOUS WORK AS gE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE. FBO FURNISHED BY OTHERS OH OVERHEAD WC WATER CLOSEI- SEAL: <br /> MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. IT IS EXPECTED OPH OPPOSITE HAND WD WOOD <br /> THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK W1TH 41. SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE FCIC FURNISHED BY CONTRACTOR WF WIDE FLANGE <br /> THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT ARCHITECT.WHERE THE TERM "OR EQUAL"IS USED THE ARCHITECT SHALL INSTALLED BY CONTRACTOR OPNG OPENING <br /> ALL SCHEDULES ARE MEf AND THAT WORK PROCEEDS WITHOUT DELAY. BE THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION FCTY FACTORY OPP OPPOSITE WG WIRE GLASS SQT� <br /> 16. BIDDERS, BEFORE SUBMITTING PROPOSALS,SHALL VISIT AND CAREFULLY FURNISHED BY THE CONTRACTOR. SUBSTITUTIONS MUST BE ACCEPTED IN WHSE WAREHOUSE REc TERED <br /> FD FLOOR DRAIN PERP PERPENDICULAR A HlTECT <br /> EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES WRITING BEFORE THEY MAY BE USED. WP WATER PROOF <br /> WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT FDN FOUNDATION PFN PREFINISHED <br /> 42. THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE FE FIRE EXTINGUISHER WR WATER RESISTANT <br /> THE EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE ARCHITECT, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE PL PLATE OR PROPERTY LINE V�/SCT WAINSCOT <br /> CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, CONTRACTOR,THE OWNER,OR THE OWNER'S REPRESENTATIVE SUBSTITUTES FEC FIRE EXTINGUISHER CABINET p�,qM PLASTIC LAMINATE � WEIGHT �G <br /> AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA IABOR, A MATERIAL, MEfHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL, FF FACTORY FINISH PLYWD PLYWOOD <br /> EQUIPMENT,OR MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES OR IN ANY WAY AITERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO FIN FINISH PNL PANEL XFMR TRANSFORMER STATE 4F WAS TON , <br /> ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH THESE DOCUMENTS,WITHOUT THE WRITTEN ACCEPTANCE OF THE FL FLOOR PNT PAINT YD YARD <br /> AN EXAMINATION BEEN MADE.THE GENERAL CONTRACTOR SHALL VERIFY ALL ARCHITECT,SUCH ACTION WILL RELIEVE THE ARCHITECT OF ANY FLG FLASHING PR PAIR <br /> CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED T0,AESTHETIC <br /> DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR CONSEQUENCES,SUBSEQUENT FAILURE(S)AND PERSONAL OR PROPERTY <br /> TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. DAMAGE ATTRIBUTABLE TO THIS CHANGE. <br /> 17. THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, 43. REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY <br /> EXCLUSIONS,OR MODIFICATIONS TO THE PROJECT DURING THE BID OF WHICH THE 1TEM IS A COMPONENT. <br /> SELECTIONS PERIOD.ANY AND ALL LIMITATIONS, EXCLUSIONS,OR 44. SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR CITY STAMP: <br /> MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE INADEQUATE MAY BE RErURNED WITHOUT ACTION. COSTS INCURRED FOR <br /> PRESUMED"INCLUDED",IN WHICH CASE NO ADDITIONAL MONIES WILL BE THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE <br /> ALLOCATED FOR THIS WORK, CONTRACTOR. <br /> 18. EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING 45. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF <br /> DRAWINGS.ALL EXISTING INFORMATION MUST BE VERIFIED IN THE FIELD. OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE �J���' �F �lJt�9�'j'�' <br /> OF EXIST NG N ORMATION. EXISTING CONSTRUCTION�CONDITIONS INCAREAS IS�NOTIF ED AND S ECI ICAOLNY P ROVOES OF,THE DEVIATIONS ATT EE� ���r�F���D F�� ������ <br /> WHERE NEW WORK IS NOT PLANNED MAY BE NOT COMPLETELY SHOWN. TIME OF SUBMISSION. <br /> 19. WITHIN ONE(1)WEEK(5 BUSINESS DAYS),OF THE AWARD OF THIS 46. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S � <br /> CONTRACT, PRIOR TO MOBILIZATION FOR ANY WORK,THE CONTRACTOR OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS <br /> SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY AND OMISSIONS IN THE SUBMITfALS, INCLUDING"FIELD MEASURE." <br /> THE PHASES OF THE WORK,AND ALL RELATED WORK FOR THE COMPLETION OF 47. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, <br /> THE PROJECT.THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, WHEfHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR, G E N ERAL N OTES & <br /> LENGTH OF TIME FOR EACH PHASE,ITS START AND COMPLETION,WITH A ARCHITECT OR OWNER,SHALL BE DOCUMENTED BY THE ARCHITECT AND <br /> PROJECTED COMPLETION DATE. APPROVED, PRIOR TO EXECUTION. <br /> 20. CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEE7INGS 48. THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE JOB SITE ABBREVIATIO N S <br /> REQUIRED BY THIS CONTRACT. DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAI OF ANY WORK.THE <br /> 21. THE CONTRACTOR SHALL OBTAIN ALl PERMITS FOR ALL SITE DEVELOPMENT CONTRACTOR SHALL CAIL TO THE ATfENTION OF THE ARCHITECT,IN <br /> WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING WRITING,ALL SPECIFIC ITEMS FOR WHICH ARCHITECT'S REVIEW IS REQUIRED. <br /> AUTHORITIES'SPECIFICATIONS FOR BUT NOT LIMITED T0,GUTTERS, <br /> SIDEWALKS, POLES,AND OTHER STRUCTURES, INCLUDING THE REMOVAL OR Proj. No: 19.0000887.000 Reviewed By: JAKB <br /> RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN <br /> ON PLANS OR NOTED OTf ir-RWISE. <br /> AN - 1 <br /> 4 <br />