|
,
<br /> � .
<br /> � �
<br /> N � � ��
<br /> � � N �
<br /> KEY NOTES : � � o ;
<br /> � �
<br /> 1O POWER FOR LOADING DOCK MONITOR. REFER TO POWER P�P,N FOR LOCATIONS, WIRING REQUIREMENTS AND ADDITIONAL INFORMATION. � � ' � ` � �
<br /> Q w w �
<br /> 2O DOUBLE DUPLEX RECEPTACLE FOR LOADING DOGK FAN ANQ LIGHT POWER . ONE DUPLEX RECEPTACLE SHALI� BE CONTROLLED BY SPRING WOUND TWIST TIMER AND ONE DUP�EX N
<br /> RECEPTACLE SHALL BE ALWAYS ON. LABEL CONTROLLED RECEPTACLE 'FAN'AND NON CONTROLLED RECEPTACLE 'LIGHT'. REFER TO POWER PLAN FOR LOCATIONS, WIRING ��
<br /> 1O MONITOR DUPLEX REQUIREMENTS AND ADDITIONAL INFORMATION. �
<br /> Q
<br /> RECEPTACLE �_�����_� �
<br /> MOUNTED AT 96"AFF. --� �`'J—��O 3� PUSH BUTTON CONTROLLER FOR EDGE OF DOCK LEVELER. COORDINATE EXACT REQUIREMENTS AND MOUNTING WITH EQUIPMENT PROVIDER. REFER TO POWER PLAN FOR U i
<br /> �� �OCATIONS, WIRING REQUIREMENTS AND ADDITIONAL fNFORMATION.
<br /> DEDICATED 120V, 20A �n ��-�����e��������������
<br /> CIRCUIT FOR �� 4 FURNISH AND INSTALL LED LIGHT UNIT WITH BUILD IN ONiOFF CONTROL SWITCH. NEW LIGHT SHALL BE VERSA LIGHT SERIES 450 WITH A COMPACT CIRCULAR LED LIGHT HEAD. �
<br /> LOADING DOCK FAN FAN/LIGHT QUAD RECEPTACLE 2�
<br /> 355 Research Parkway
<br /> MOUNTED AT 66"AFF, n�teriden,CT Q6450
<br /> AND LIGHT UNIT. O FURNISH AND INSTALL LOADING DOCK HIGH VELOCITY BLOWER FAN MOUNTED ON SWING ARM. NEW FAN SHALL BE SUPER AEROTECK MODEL 750, 1200CFM, 112HP, 120V. FURNISH (203) 630-1406 ;
<br /> AND INSTALL ALL HARDWARE REQUIRED TO COMPLETE THE FINAL INSTALLATION. COORDWATE MOUNTING REQUIREMENTS WITH EQUIPMENT MANUFACTURER (203) 630-2615 Fax
<br /> DEDICATED 120V, 20A 7 � o0 0 � 0 � �,�,��,,,�„�
<br /> CIRCUIT FOR EDGE OF 6O TRAILER RESTRAINT CONTROL PANEL FOR SERCO SL 60 GROUND MOUNT TRAILER RESTRAINT. CONTROL PANEL SHALL BE SERCO PROGRAMMABLE CONTROL PANEL WITH RED,
<br /> DOCK LEVELER AND 4 AMBER AND GREEN LED LIGHT, AND COMPACT EXTERIOR RED, AMBER AND GREEN LIGHT. COORDINATE EXACT REQUIREMENTS AND MOUNTING WITH EQUIPMENT PROVlDER. REFER
<br /> TRAILER RESTRAINT. TO POWER PLAN FOR LOCATIONS, WIRING REQUIREMENTS AND ADDITIONAL INFORMATION.
<br /> SLEEVE INITH WATER STOP & s�s��' �
<br /> CONVENIENCE QUAD 3 g �7 LOADING DOCK FAN CONTROL 60 MIN. SPRING WOUND TIMER SWITCH. NEW TIMER SWITCH SHALL BE EQUAL TO TORK C460M, 125-277V DPST METAL COVER PLATE. TIMER SWITCH � �OF WAS '��, `
<br /> / ANCHOR COLLAR OR CORED �c -� '�'W
<br /> RECEPTACLE SHALL CONTROL DUPLEX RECEPTACLE DEDICATED FOR FAN POWER CORD PLUG. REFER TO KEY NOTE #2 FOR ADDITIONAL INFORMATION. �---t-�`^'�' � y'`� " c�
<br /> MOUNTED AT 18"AFF.---,�_ oo , a HOLE IN EXISTING WALL _ o
<br /> 8 .o �,
<br /> a � x
<br /> d a � . ,
<br /> �� 8� 2#12 AND 1 #12G. IN 3/4"C. COORDINATE FINA� REQUIREMENTS WITH EQUIPMENT PROVIDER. ` � °= WALL � ,o
<br /> � Sz�r��
<br /> FINISHED FLOOR $ � �, � � —CONDUIT ��`�s( ���i�``'�� � �
<br /> 9O INSTALL CONDUITS BELOW SLAB. REFER TO KEY NOTE #8 FOR ADDITIONAL INFORMATION. ,.�v��Er�
<br /> �� — — — — — — — ----_- -- — — --- �*
<br /> � — , NOTES :
<br /> ------- —
<br /> ------ --
<br /> NEMA 4 JUNCTION BOX (4°X4"X3"D) NEMA 4 JUNCTION BOX 1. COORDINATE ALL POWER WIRING WITH INSTALLATION INSTRUCTIONS PRIOR TO BEGINNING WORK. — ---- ����°�°°�°��
<br /> FOR EDGE OF DOCK LEVELER (4"X4"X3"D) FOR TRAILER -
<br /> MOTOR (COORDINATE EXACT RESTRAINT. (COORDINATE 2. COORDINATE ALL DIMENSIONS WITH ARCHITECT AND EQUIPMENT INSTALLERS PRIOR TO BEGINNING WORK. s
<br /> REQUIREMENTS WITH EQUIPMENT EXACT REQUIREMENTS WITH
<br /> MANUFACTURER) EQUIPMENT MANUFACTURER) 3. DETAIL MAY NOT REFLECT EXACT SYSTEM CONFIGURATION. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL REQUIRED CONDUIT AND WIRING FOR , ; ;,
<br /> COMPLETE SYSTEM. COORDINATE FINAL REQUIREMENTS WITH EQUIPMENT SUPPLIER AND SYSTEM SPECIFIC WIRING DIAGRAMS. � �;� ,; __ -- -- HYDRO-STATIC PIPE WALL �
<br /> � ' � �_% � � CLOSURE SIMILAR TO LINK- � ��
<br /> 4. ALL COMPONENTS MUST BE PROPERLY GROUNDED PER NEC 250-81(a)& (c}. INCLUDE GROUNDING BUSHING ON ALL CONDUITS ENTERING NON-METALIC ENCLOSURES WITH#8 ° ° ° � / � °
<br /> ' ° a ' SEAL OR APPROVED EQUAL
<br /> GROUNDING BUSHINGS WHEN MULTIPLE CONDUITS ENTER ENCLOSURE. � � � �°�°���'� �a"�� ° �� ��� � �r
<br /> �=�`�✓_
<br /> 6. REFER TO DRAWING E0.01 FOR KEY NOTES AND ADDITIONAL INFORMATION.
<br /> O
<br /> �
<br /> �
<br /> �'� � TYPICAL LOADING DOCK DOOR ELEVATION % � CONDUIT THRU FOUNDATION WALL PENETRATION DETAIL � � � *
<br /> ' � NOT TO SCALE �� / NOT TO SCALE W � O
<br /> �— -- �/ � ocvp
<br /> W � � . :
<br /> � � Q . . .
<br /> w � �
<br /> R(30FTOP AIR HANDLING � �
<br /> w �
<br /> UNIT(TYP FOR ALL RTU'S)
<br /> � 0 �
<br /> — W
<br /> DISCONNECT SWITCH Q � W
<br /> MOUNTED TO UNIT. COMBANATION SINGLE POLE SWITCH & GFI DUPLEX RECEPTACLE IN � � W '
<br /> NEMA 3R WEATHERPROOF ENCL4SURE FOR IN-USE PROTECTION. � _
<br /> �
<br /> JUNCTION BOXES AND ��I I�
<br /> CONDUITS TO UNIT. JUNCTION BOXES & CONDUITS STUBBED TO UNIT. p
<br /> � �O � '.
<br /> \ /
<br /> ROOF �
<br /> �
<br /> D SCONNECT SWITCHE SEE MECHAN CAL Q PMENT�F�EDER � J J J J
<br /> � � 3/4" CONDUIT FOR FIRE ALARM NOTES:
<br /> SCHEDULE FOR ELECTRICAL REQUIREMENTS. MONITORING & CONTROL. FURNISH 1. TYPICAL FOR ALL NEW ROOF TOP UNITS (RTU'S). `
<br /> FURNISH & INSTALL NEW ELECTRICAL FEED TO COMBINATION � & INSTALL WfRING AS REQUIRED
<br /> SING�E PQLE WEATHER PROOF SWITCH &WEATHER PROOF FOR A CQMPLETE INSTALLATION 2, ELECTRICAL CONTRACTOR SHAL� FURNISH & INSTALL CONTROL
<br /> GFI DUPLEX RECEPTACLE. (2)#12, (1)#12 GND. IN 3/4"CONDUIT WIRING FOR UNITS. FINAL CONNECTIONS BY CONTROL �
<br /> T0120V 20AMP, 1-POLE CIRCUIT BREAKER AS INDICATED ON (16)#12 CONTROL WIRES IN 1" CONTRACTOR. COORDINATE QUANTITY& COLOR CODING OF 1/2"TO 3/4" MAXIMUM ALL AROUND �� _--__;—�----�— �—PACK OPENING ALL AROUND ��� ������ .
<br /> POWER PLAN. CONDUIT(VERIFY QUANTITIES CONTROL WIRING WITH CONTROL CONTRACTOR FOR EACH UNIT. PENETRATING ELEMENT ��� ;i SHEET METAL SLEEVE AIRTIGHT , . '
<br /> FOR EACH UNIT) FURNISH & INSTALL (4} SPARE CONTROL WIRES IN EACH RUN OF ��j � / , �'/,,��.�': � � WITM NON-HARDENING SEALANT
<br /> HUNG CEILING CONTROL CONDUIT& LABEL EACH END 'SPARE'.
<br /> ,
<br /> �
<br /> i
<br /> ' (9)#12 CONTROL 3. ELECTRICAL CONTRACTOR SHALL FURNISH &WIRE (2) DUCT z
<br /> j WALL MOUNTED WIRES IN 1" CONDUIT MOUNTED SMOKE DETECTORS, (1) EACH FOR SUPPLY & RETURN. CONDUIT �
<br /> � THERMOSTAT BY MECH. (VERIFY QUANTITIES WIRE DETECTORS TO SHUT DOWN UNIT UPON DETECTION OF �
<br /> � CONTRACTOR (VERIFY FOR EACH UNIT} SMOKE. REFER TO ELECTRICAL GENERAL NOTES & SYMBOLS N � y
<br /> �, LOCATION FOR EACH UNIT ; o
<br /> � , LEGEND FOR FURTHER INFORMATION OF DUCT SMOKE DETECTORS. Z
<br /> � WITH MECH. GONTRACTOR) FURN�SH & INSTALL (2}#12, i , ,; , % / /;� o
<br /> _ ' � _ ,
<br /> T (1}#�2 GND. IN 3l4"CO�IDUIT ���� ' � ��'� �
<br /> � 4. ELECTRICAL CONTRANCTOR SHAL� FURNISH & INSTALL A RELAY � � � � � ' — PIPE SLEEVE OR SEALANT w
<br /> � TO 20A, 1P CIRCUIT BREAKER 1/2" TO 3/4" MAXIMUM ALL AROUND �� i _ �� �
<br /> a� WITH (2)CONVERTABLE CONTACTS USED TO TIE EACH MAGNET �,�_;--------�—% � `
<br /> U IN LOCAL 120V HOUSE PANEL STARTER 1NT0 THE FIRE ALARM PANEL. PENETRATING ELEMENT � . '
<br /> w
<br /> � WALL MOUNTED TEMP. �
<br /> , CONTROL CABINET BY �
<br /> � CONTROL CONTRACTOR CONCRETE WALL OR FLOOR ALL — o
<br /> o (VERIFY LOCATION FOR AROUND PENETRATING ELEMENT
<br /> � EACH UNIT)
<br /> o �
<br /> � FINISHED FLOOR z
<br /> �
<br /> � �,ti�_ u,��..r,� ��.�ti ��.,��.���.
<br /> � Designed MB
<br /> � Drawn: HF
<br /> �
<br /> U Reviewed: JK , ,
<br /> ° � ROOF TOP HVAC EQUIPMENT ELECTRICAL INSTALLATION DETAI � %� N�N-RATED CC�NDUIT PENETRATION DETAIL � �
<br /> �/ ( d P oject No. As�nd900494
<br /> �- 3
<br /> � NOT TO SCALE `�T NOT TO SCALE Date: 04/19/2019
<br /> �
<br /> �
<br /> �
<br /> N
<br /> �
<br /> � Title: � ������� �"
<br /> �
<br /> � ELECTRICAL PART
<br /> � PLANS & DETAILS
<br /> U
<br /> � , .
<br /> Q .
<br /> �. �����..���om�.� � �
<br /> Sheet Na
<br /> C'7
<br /> �'
<br /> °� E4
<br /> � .05 .
<br /> �
<br /> ,
<br /> �
<br /> �O 2017 BL COMPANIES,INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON,FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES. .
<br /> .r'�
<br />
|