Laserfiche WebLink
1 <br /> GENERAL NOTES <br /> SYMBOLS ABBREVIATIONS � <br /> THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER SEPARATE PERMITS,WHEN REQUIRED AND/OR WHEN WORK ITEMS ARE 49. UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL V ANGLE FLUOR FLUORESCENT PS PAINT SYSTEM <br /> ORDINANCES,CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR A 1 NDO,�IV WINDOW SYMBOL � CENTER LINE FM FACTORY MUTUAL PSF POUNDS PER SQUARE FOOT <br /> ON TH E D R A W I N G S,A N D R E Q U I R E D B Y L O C A L B U I L D I N G A U T H O R I T I E S.T H E DESIGN/BUILD IN NATURE,SHALL BE OBTAINED BY THE CONTRACTOR FOR PREPARE A"PUNCHLIST"OF CORRECTIONS AND UNSATISFACTORY AND/OR � 9� DIAMETER OR ROUND FOC FACE OF CONCRETE PSI POUNDS PER SQUARE INCH Nelco Architecture, Inc. <br /> GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED MECHANICAL, PLUMBING,FIRE SPRINKLERS,ELECTRICAL AND FIRE ALARM. I N C O M P L E T E W O R K F O R R E V I E W B Y T H E A R C H I T E C T. r-� # NUMBER OR POUND F O F F A CE O F F I N I S H P T P R E S S U R E T R E A T E D <br /> TO AS"THE CODE."THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, DESCRIPTIVE,DETAILED DESIGN AND REQUIRED SUBMITTAL DOCUMENTS 50. THE CONTRACTOR SHALL MAINTAIN AT THE SITE,ONE RECORD COPY OF ALL �' 1 � PENNY FOIC FURNISHED BY OWNER PTD PAPER TOWEL DISPENSER <br /> CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR INFORMATION SHALL BE PROVIDED FOR REVIEW BY THE REGULATING DRAWINGS,PERMITS,SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL J COLUMN LINE/GRID LINE A INTERIOR ELEVATION(S) 1 <br /> INTERPRETATION PRIOR TO PERFORMING THE WORK. AUTHORITIES AND BY THE OWNER/TENANT/ARCHITECT FOR APPROVAL CHANGES DURING CONSTRUCTION, ACCESS TO THESE SHALL BE PROVIDED FOR PERPENDICULAR INSTALLED BY CONTRACTOR PTD/R PAPER TOWEL DISPENSER <br /> 2. THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO PRIOR TO ANY WORK BEING PERFORMED.SEE SPECIFICATIONS FOR THE USE OF ALL TRADES,CLIENT REPRESENTATIVES AND THE ARCHITECT, ,�--- ELEVATION IDENTIFICATION � PLATE FOIO FURNISHED BY OWNER AND RECEPTACLE <br /> DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION;WHEN REQUIREMENT FOR DESIGN/BUILD FIRE SPRINKLER SYSTEM.SUBMTf PLAN DURING ALL PHASES OF CONSTRUCTION. Dl AX,X B INSTALLED BY OWNER PTN PARTITION <br /> AND HOW DELIVERIES CAN BE MADE,WHAT PHASES AND TYPES OF TO AND OBTAIN PERMIT FROM THE AUTHORITY HAVING JURISDICTION FOR 51. DURING THE COURSE OF CONSTRUCTION,ACTUAL LOCATIONS SHALL BE SHEET WHERE ELEVATION IS AB ANCHOR BOLT FOS FACE OF STUD PTR PAPER TOWEL RECEPTACLE 1200 Fifth Ave. <br /> CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS,AND IN FIRE SPRINKLER SYSTEM INSTALLATION OR MODIFICATION. ALL WORK INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR ALL � DRAWN S u ite 1300 <br /> GENERAL ANY SPECIAL BUIIDING REQUIREMENTS WHICH WILL AFFECT THE SHALL COMPLY WITH CURRENT GOVERNING CODES. RUNS OF MECHANICAL AND ELECTRICAL WORK INCLUDING CONCEALED WORK AC ACOUSTICAL FS FULL SIZE PVMT PAVEMENT <br /> WHICH DEVIATES FROM THE DRAWINGS. UPON COMPLETION OF THE PRO]ECT, 7A DOOR/RELITE NUMBER A/C AIR CONDITIONING FT FEET Seattle, WA 98101 <br /> COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR, ALL WORK SHALL INCLUDING ALL PUNCHLIST ITEMS,THIS INFORMATION SHALL BE NEATLY CORRESPON DS TO ROOM ENTERING ACP ACOUSTICAL CEILING PANEL FTG FOOTING QT QUARRY TILE Phone: (206)408-8500 <br /> CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH CURRENT <br /> REGULATIONS,WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO GOVERNING CODES. NOTHING IN THESE DRAWINGS IS TO BE CONSTRUED AS TRANSFERRED BY THE CONTRACTOR TO A SET�OF DRAWiNGS,WHICH SHALL BE 107B TITLEI ROOM IDENTIFICATION ACT ACOUSTICAL TILE FTIC FURNISHED BY TENANT <br /> WWW.NELSONWORLDWIDE.COM <br /> SUBMISSION OF BID. TO PERMIT WORK WHICH IS NOT CONFORMING TO CURRENT GOVERNING MARKED"AS BUILT SET"AND COPIES SHALL BE PROVIDED TO BOTH THE TITLE2~� ADH ADHESIVE INSTALLED BY CONTRACTOR R RISER <br /> 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FORTHE SUB- CODES. OWNER AND THE ARCHITECT.WITHIN THREE(3)WEEKS(15 BUSINESS DAYS) TITLE3 ROOM NAME <br /> CONTRACTORS'RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS,AS WELL 22. THE CONTRACTOR SHALL CREATE AND IMPLEMENT AN EROSION AND OF THE RECEIPT OF THE"AS BUILT SET."APPROVAL FOR FINAL PAYMENT TO \ AD] ADJACENT FTIO FURNISHED BY TENANT RA RETURN AIR <br /> AS ALL FUTURE ADDENDA,BULLETINS,FIELD DIRECTIVES AND CHANGE SEDIMENTATION CONTROL PLANFOR ALL SITE CONSTRUCTION ACTIVITIES THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE SHOWN WHY C/ KEY NOTE ROOM# ROOM NO. AF ACCESS FLOOR INSTALLED BY OWNER RAD RADIUS <br /> ORDERS. ASSOCIATED WITH THE PROJECT. SUCH APPROVAL HAS BEEN DENIED. AFF AT/ABOVE FINISH FLOOR FURR FURRING R$tS ROD&SHELF <br /> 4. THE AIA STANDARD DOCUMENT"A201"TITLED"GENERAL CONDITIONS OF THE THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION 52. PRIOR TO THE COMPLETION OF THE WORK,THE CONTRACTOR SHALL AHJ AUTHORITY HAVING JURISDICTION FUT FUTURE RB RESILIENT BASE <br /> CONTRACT FOR CONSTRUCTION"SHALL BE CONSIDERED PART OF THE REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS' � PARTITION TYPE +8'-6" FINISHED CEILING HEIGHT AL ALUMINUM FUTURE- FUTURE ROUGH IN ONLY RCP REFLECTED CEILING PLAN <br /> GENERAL CONDITIONS OF THIS WORK. LOCAL STANDARDS AND CODES,WHICHEVER IS MORE STRINGENT. CATALOG,OPERATING INSTRUCTIONS,START-UP CHECK LISTS,MAINTENANCE ALT ALTERNATE RIO RD ROOF DRAIN <br /> 5. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT 23, ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE DEPARTMENT INSTRUCTIONS AND SIMILAR DATA,AS WELL AS ALL GUARANTEE(S)FOR ALL AP ACCESS PANEL RD/O ROOF DRAIN OVERFLOW <br /> THE STORAGE OF MATERIALS AND SHALL PROVIDE PROTECTION AS NECESSARY PRIOR TO START OF CONSTRUCTION, EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE �X REVISION NUMBER � - PROPERTY LINE APC ACOUSTICAL PANEL CEILING GA GAGE REBAR REINFORCING BAR <br /> TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEFT OR DAMAGE Z4, ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY CONTRACTOR UNDER THIS CONTRACT,AND SHALL ORIENT AND INSTRUCT APPROX APPROXIMATE GALV GALVANIZED REF REFERENCE <br /> SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL OF THE CONTRACTOR,UNO THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH - REVISION ARCH ARCHITECTURAL GB GRAB BAR REFR REFRIGERATOR <br /> CONDITIONS AND WILL REPAIR&REPLACE DAMAGE OR LOSSES AT THE 25, THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION, EQUIPMENT. <br /> CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER. HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT 53. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT -- CLOUD AROUND REVISION � ASPH ASPHALT GC GENERAL CONTRAGTOR REINF REINFORCED <br /> �$ NEW OR FINISHED CONTOURS GL GLASS OR GLAZING REQ'D REQUIRED <br /> 6. WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL TO THE POINT OF USE,AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, THAT MOLD OR ASBESTOS IS UNCOVERED.THE OWNER SHALL RETAIN A BD BOARD <br /> BE OCCUPIED DURING THE CONSTRUCTION PERIOD,THE CONTRACTOR SHALL: CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR THE PROMPT BETW BETWEEN GLB GLU-LAM BEAM REV REVISION <br /> A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF CONTRACT. IDENTIFICATION,TESTING,TREATMENT,REMEDIATION AND STORAGE OF THE MATCH LINE � EXISTING CONTOURS BLK BLOCK GND GROUND RH RIGHT HAND OR ROBE HOOK <br /> CONSTRUCTION OPERATIONS,ACCESS TO TENANT SPACES AND 26. OF THE INEVITABLE WASTE THAT IS GENERATED,AS MANY OF THE WASTE MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD CONSTRUCTION _ � SHADED PORTION IS THE 5IDE GR GRADE RESIL RESILIENT <br /> ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED,SALVAGED,OR PRACTICES.THE ARCHITECT SHALL BEAR NO RESPONSIBILTfY FOR WORK �1 BLDG BUILDING <br /> B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBL RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED. RELATED TO THESE MATERIALS. CONSIDERED BM BEAM GWB GYPSUM WALL BOARQ RM ROOM <br /> RO ROUGH OPENING <br /> ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING. CONTRACTOR SHALL COORDINATE WASTE MATERIALS HANDLING AND 54. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR ,1c�Q BRG BEARING <br /> C. CONSTRUCTION OPERATIONS SHAIL NOT CAUSE INTERRUPTIONS OF SEPARATION FOR ALL TRADES.CONTRACTOR SHALL PROVIDE SEPARATION, LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS.THE WORK POINT, CONTROL POINT �� BOT BOTfOM HB HOSE BIB RT RESILIENT TILE <br /> ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WITHOUT HANDLING,TRANSPORTATION, RECYCLING,SALVAGE,AND LANDFILLING FOR '�� TOP OF WALL HC HOLLOW CORE OR HANDICAP RUB RUBBER <br /> PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING � � OR DATUM POINT BSMT BASEMENT HDR HEADER RW RAIN WATER <br /> � FLOORS, MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT COMMINGLED IN DUMPSTERS ON-SITE AS LONG AS PROVISION IS MADE FOR OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH � BUR BUILT UP ROOF <br /> MATERIALS. ! HDWD HARDWOOD RWL RAIN WATER LEADER <br /> TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR. �Q � HDWE HARDWARE <br /> AT ALL OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLiC TRANSFER STATION MUST PROVIDE DOCUMENTATION REPORT TYPES OF 55. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY ( 1492 EQUIPMENT NUMBER .�G�' TOP OF CURB HM HOLLOW METAL S SOUTH <br /> SPACES.ALL ACTIVE AREAS 5HALL BE KEPT CLEAN AND FREE FROM MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD. FINAL INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING CAB CABINET HORIZ HORIZONTAL SC SOLID CORE <br /> DEBRIS. DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED. JURISDICTION AND COMPLYING WITH STATUTORY REQUIREMENTS FOR CB CATCH BASIN HR HOUR <br /> D. ERECT AND MAINTAIN TEMPORARY BRACING,LIGHTS,DUSTPROOF DISABILITY AND WORKMEN'S COMPENsanON. BUILDING SECTION � CBU CEMENTITIOUS BACKER UNIT HT HEIGHT SCD SEAT COVER DISPENSER <br /> PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS DIVERSION GOALS: A MINIMUM 75%OF TOTAL PROJECT WASTE SHAIL BE X CEM CEMENT SCHD SCHEDULE <br /> NECESSARY TO PREVENT INJURY, NOISE,DUST AND INCONVENIENCE DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES,AT A <br /> R TOP OF PAVEMENT HTG HEA SD SOAP DISPENSER <br /> TO OTHER TENANTS,THE PUBLIC,AND TO PREVENT DAMAGE TO AX.X SECTION IDENTIFICATION .�q. CER CERAMIC HVAC HEATING/VENTILATION/ SECT SECTION <br /> ADJACENT CONSTRUCTION WHICH IS TO BE LEFT IN PLACE. MINIMUM,SHALL BE DIVERTED FROM LANDFILL. <br /> E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL a. CLEAN DIMENSIONED WOOD,PALLET WOOD SHEET WHERE SECTION IS DRAWN '�� � CFM CUBIC FEET PER MINUTE AIR CONDITIONING <br /> MEASURES OF THE SHEET METAL AND AIR CONDITIONING NATIONAL b. PLYWOOD,OSB,AND PARTICLEBOARD CFT CONDUCTIVE FLOOR TILE SF SQUARE FEET <br /> CONTRACTORS ASSOCIATION(SMACNA)IAQ GUIDELINES FOR c, CONCRETE CG CORNER GUARD HWH HOT WATER HEATER SHTG SHEATHING r <br /> OCCUPIED BUILDINGS UNDER CONSTRUCTION,2ND EDITION 2007, <br /> d. CARDBOARD,PAPER,PACKAGING CHBD CHALK BOARD IBC INTERNATIONAL BUILDING CODE SIM SIMILAR � <br /> ANSI/SMACNA 008-2008(CHAPTER 3).?PROTECT STORED ON-SITE e. METALS CI CAST IRON SNK SINK <br /> AND INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE. f. GYPSUM DRYWALL(UNPAINTED) PROJECT ID INSIDE DIAMETER/ SLR SEALER � '�' <br /> D RIN g. ACOUSTIC TILE DETAIL SECTION NORTH N CJT CONTROL JOINT IEC D ERNAITIONAL ELECTRIC � <br /> F. I F P E R M A N E N T L Y I N S T A L L E D A I R H A N D L E R S A R E U S E D U G X CLF CHAIN LINK FENCE SND SANITARY NAPKIN <br /> C O N S T R U C T I O N,F I L T R A T I O N M E D I A W I T H A M I N I M U M E F F I C I E N C Y h. PAINTD I S P E N S E R <br /> S E C T I O N I D E N T I F I C A T I O N PR O JE C T NORTH C L G C E I L I N G C O D E C O U N CIL S N R S A N I T A R Y N A P K I N <br /> ' REPORTING VALUE(MERV)OF 8 MUST BE USED AT EACH RETURN AIR i. GLASS AX.X � CJ CONSTRUCTION JOINT IFC INTERNATIONAL FIRE CODE RECEPTACLE P A N A T T C� N I� <br /> G R I LLE. j. PLASTICS �SHEET WHERE SECTION IS DRAWN <br /> 7, ALL CUTTING,CHASING, DRILLING OR DEMOLITION OF WALLS,SLABS,ETC. k. CARPET AND PAD - CLK CAULKING I G I N S U L A T E D G L A Z I N G <br /> REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER �. BEVERAGE CONTAINERS CLO CLOSET IHM INSULATED HOLLOW METAL SQ C SQUARE A T I O N pqNATTO N I <br /> TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS HOURS ON AN 2�, THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS,MAINTAIN AND PAY CLR CLEAR <br /> OVERTIME BASIS IF NECESSARY,UNLESS THE BUILDING MANAGEMENT AND 9'O' E�EVATION HANGE IN IN INCH SSK SERVICESSIN�j(EEL DEVELOPMENT <br /> CMU CONCRETE MASONRY UNIT INCL INCLUDE <br /> ALL COSTS FOR TEMPORARY WATER,PLUMBING,POWER,LIGHTING, CNTR COUNTER <br /> ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMITTING HEATING OR VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK. 7'-Q" INSUL INSULATION ST STONE/STONE TILE <br /> OTHERWISE. 28. DIMENSIONS ARE TO FACE OF STUD,CONCREfE,OR MASONRY UON. CO CLEANOUT <br /> 8. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITI'FOR DO NOT SCALE THESE DRAWINGS;WRITTEN DIMENSIONS SHALL GOVERN. �- DETAIL OR ENLARGED PLAN COL COLUMN INT INTERIOR STA STATION CO M PANY, LLC <br /> IPC INTERNATIONAL PLUMBING CODE STC SOUND TRANSMISSION <br /> JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS � X CONC CONCRETE <br /> SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED, <br /> PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.THIS DETAIL IDENTIFICATION CLASS 900 SW 16TH STREET, SUITE <br /> REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT, �(,�( CONSTR CONSTRUCTION <br /> NORMAL WORKING HOURS.THE CONTRACTOR SHALL PROVIDE PUBLiC Z9. LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND � � SHEET WHERE DETAIL IS DRAWN PT ]AN JANITOR STD STANDARD <br /> PROTECTION,AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES E��vATIONs. FINISH SYMBOL CONT CONTINUOUS JT )OINT RENTON� WA, 98057 <br /> 30. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' 2 CORR CORRIDOR STL STEEL <br /> HAVING JURISDICTION,UNTIL CLIENT ACCEPTANCE OF THE PREMISES. RECOMMENDATIONS. ANY DIFFICULTIES ARE TO BE REPORTED TO THE STOR STORAGE <br /> 9. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FORTHE PROVISION CPT CARPET KIT KITCHEN <br /> AND MAINTENANCE OF ALL BRACING,SHORING,ENCLOSURES,BARRIERS OR ARCHITECT IMMEDIATELY. CT CERAMIC TILE STRL STRUCTURAL <br /> 31. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL KO KNOCK OUT SUSP SUSPENDED GLACIER PEAK ' <br /> � SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS N/ORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE{1) CTR CENTER KS KNEE SPACE <br /> DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK. CY CUBIC YARD SV SHEET VINYL GREAT LITTLE BOX <br /> YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS SYM SYMMETRICAL <br /> 10. DURING THE ENTIRE CONSTRUCTION PERIOD,ALL EXITS,EXIT LIGHTING, OCCURRING IN THE 6UARANTEED PERIOD SHALL BE CORRECTED AT NO LAM LAMINATE <br /> FIRE PROTECTION DEVICES AND ALARMS SHALL BE CONTINUOUSLY ADDITIONAL COST. DBL DOUBLE <br /> MAINTAINED IN CONFORMANCE WITH LOCAL BUILDING CODE AND OTHER 32. THE CLIENT,ARCHITECT,CONSULTANTS AND ALL INSPECTORS FROM DEPT DEPARTMENT LAV LAVATORY T TREAD <br /> GOVERNING ENTITY REQUIREMENTS. UNO,ALL EXISTING,SERVICES AND PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL DF DRINKING FOUNTAIN(W/O COOLER) LB LAG BOLT TB TOWEL BAR <br /> DEVICES SHALL REMAIN ACTIVE. TIMES DURING NORMAL WORKING HOURS. LF LINEAL FOOT T&B TOP&BGTTOM <br /> DIA DIAMETER LG LENGTH TG TEMPERED GLASS 607 RIVERSIDE ROAD <br /> 11. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE 33. THE CONTRACTOR SHALL PROVIDE ALL LABOR,MATERIALS,AND <br /> DIAG DIAGONAL LH LEFT HAND THK THICK EVERETT, WA g 1 <br /> BUILDING OWNER. INCLUDING,BUT IS NOT LIMITED T0,WINDOWS,FLOOR EQUIPMENT NECESSARY TO EXECUTE ALL WORK,EXCEPT WHERE NOTED AS DIM DIMENSION LINO LINOLEUM TIG TEMPERED INSULATED <br /> AND CEILING FINISHES, PUBLIC TOILETS,ELEVATORS,DOORS&BUCKS, NOT IN CONTRACT(N.I.C.). <br /> ELECTRICAL AND AIR-CONDITIONING EQUIPMENT.THE CONTRACTOR SHALL 34. MINOR DETAILS NOT SHOWN OR SPECIFIED,BUT NECESSARY FOR PROPER DISP DISPENSER LKR LOCKER GLAZING Descrlption� N0; ate: <br /> PROTECT ADJOINING PROPERTY. DAMAGE CAUSED BY THE CONTRACTOR'S CONSTRUCTION OF ANY PART OF THE WORK,SHALL BE INCLUDED AS IF THEY DN DOWN <br /> WORK OR WORKMEN MUST BE MADE GOOD,IN A TIMELY FASHION. WERE INDICATED IN THE DRAWINGS,UNLESS OTHERWISE AGREED UPON. DR DOOR OR DRAIN LT LIGHT TO TOP OF PERMIT SET 02/14/2020 <br /> PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT WHERE THE CONTRACT,CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY TOC TOP OF CONCRETE <br /> THE COST OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE DTL DETAIL MACH MACHINE TOP TOP OF PAVEMENT <br /> RESPONSIBLE FOR ALL SUB-CONTRACTORS, IF THE CONTRACTOR FAILS TO BUILDING CODE,OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE DWR DRAWER MATL MATERIAL TOS TOP OF STEEL <br /> COMPLETE THE REPAIRS IN A TIMELY FASHION,SAID REPAIRS WILL BE MADE WORK,THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE DS DOWNSPOUT MAX MAXIMUM TOSL TOP OF SLAB <br /> � BY A CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK FURNISHED IN ALL C�ISES. DW DISHWASHER <br /> DWG DRAWING MECH MECHANICAL TOW TOP OF WALL <br /> CHARGED ACCORDINGLY. 35. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNLSH <br /> 12, THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD, MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE-CONSUMER(POST- MEZZ MEZZANINE TPD TOILET PAPER DISPENS <br /> THE TENANT,AND ARCHITECT AGAINST ANY AND AlL CL4IMS AND DEMANDS INDUSTRIAL)AND POST-CONSUMER RECYCLED CONTENT.THE CONTRACTOR E EAST MFR MANUFACTURER TPH TOILET PAPER HOLDER <br /> FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON,FIRM OR INDIVIDUAL SHALL FURNISH THESE MATERIALS WITHIN THE PARAMEfERS OF THE BUDGET MH MANHOLE TPTN TOILET PARTITION <br /> EA EACH MIN MINIMUM TS TUBULAR STEEL <br /> OR FOR PERSONAL INJURIES(INCLUDING DEATH)ARISING OUT OF,OR AND SHALL NOT PURCHASE ANY COST-ADDING MATERIAL OR PAY A PREMIUM EB EXPANSION BOLT MIR MIRROR N TELEVISION <br /> SUFFERED WHILE ENGAGED IN,OR CAUSED,IN WHOLE OR IN PART,BY THE (MORE THAN FAIR MARKET VALUE)WITHOUT PROJECT MANAGER AND OWNER <br /> EXECUTION OF THE WORK;THE CONTRACTOR SHALL WELL AND TRULY ACKNOWLEDGEMENT AND APPROVAL. EJ EXPANSION JOIN MISC MISCELLANEOUS TYP TYPICAL <br /> DEFEND THE LANDLORD,TENANT AND ARCHITECT AND SHALL PAY ALL 36. FOR ALl MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH EL ELEVATION <br /> MONIES AWARDED FOR SUCH DAMAGES OR INJURIES(INCLUDING DEATH),ALL MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT ELEC ELECTRIC MLD MOLdING <br /> COSTS INCLUDING ATTORNEY'S FEES SUSTAINED,AND SHALL OBTAIN A FULL SITE WHERE AVAILABLE,WITHIN BUDGET,WITHIN FAIR MARKET VALUE AND ELEV ELEVATOR MRGWB MOISTURE RESISTANT GWB UL UNDERWRITERS LABORATORY <br /> ACQUAINTANCE AND RELEASE IN FAVOR OF THE LANDLORD,TENANT AND DO NOT PRESENT RISK TO THE PROJEC'f SCHEDULE. MTD MOUNTED UNF UNFINISHED <br /> ARCHITECT,UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE EM ENTRY MAT MTL METAL UON UNLESS OTHERWISE NOTED <br /> OF THE LANDLORD,TENANT,ARCHITECT,ITS AGENTS OR EMPLOYEES. 37• FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE EMER EMERGENCY <br /> 13. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE OF BOARD,MDF,PLYWOOD,OSB AND WOOD DOORS,THE CONTRACTOR SHALL ENCL ENCLOSURE OR ENCLOSED MULL MULLION UR URINAL <br /> FURNISH MATERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE. EP ELECTRICAL PANEL N NORTH VAR VARIES <br /> ANY WORK,NOR FOR THE MEANS AND MEfHODS OF CONSTRUCTION CHOSEN 38 DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN.MINOR EWC ELECTRIC WATER COOLER NIC NOT IN CONTRACT VCT VINYL COMPOSITION TILE <br /> BY THE CONTRACTOR OR ANY SUB-CONTRACTORS,NOR SHALL THE ARCHITECT MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS. <br /> . GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS. REQUIRED MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK, EPX EPDXY NO/# NUMBER VERT VERTICAL <br /> 14, THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE <br /> DURING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK 39. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS EQ E UAL NOM NOMINAL VEST VESTIBULE <br /> FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY,THE AND TRADESPERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN EQUIP EQUIPMENT NTS NOT TO SCALE VIN VINYL <br /> CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA ACCORDANCE WITH THE BEST TRADE PRACTICES. EST ESTIMATE <br /> INCLUDING,BUT NOT LIMITED T0,WET WIPING OF FURNITURE,AND 40. THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES EX EXPANSION OA OVERALL �C VINYL WALL COVERING <br /> CASEWORK,WASHING AND WAXING OF VCT FLOORING AND THE VACUUMING FOR ALL SPECIFIED MATERIALS&EQUIPMENT REQUIRED TO PERFORM THE EXIST EXISTING OC ON CENTER <br /> OF CARPEf.ALL CLEANING SHALL BE IN ACCORDANCE WITH WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS.SHOULD THE EXT EXTERIOR OD OUTSIDE DIAMETER/ W WEST <br /> MANUFACTURERS'RECOMMENDATIONS AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON-TIME DIMENSION W� WITH <br /> 15. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL COMPLEfION OF THE PROJECT,THE CONTRACTOR SHALL NOTIFY THE OFF OFFICE W/O WITHOUT <br /> SUB-CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO FA FIRE ALARM WC WATER CLOSET <br /> MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK.IT IS EXPECTED BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE. FBO FURNISHED BY OTHERS OH OVERHEAD <br /> THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH 41. SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE FCIC FURNISHED BY CONTRACTOR OPH OPPOSITE HAND WD WOOD <br /> THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT ARCHITECT,WHERE THE TERM "OR EQUAL"IS USED THE ARCHITECT SHALL INSTALLED BY CONTRACTOR OPNG OPENING WF WIDE FLANGE <br /> ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY, BE THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION FCTY FACTORY OPP OPPOSITE wG WIRE GLASS <br /> 16. BIDDERS,BEFORE SUBMITfING PROPOSALS,SHALL VISIT AND CAREFULLY FURNISHED BY THE CONTRACTOR.SUBSTITUTIONS MUST BE ACCEPTED IN FD FLOOR DRAIN PERP PERPENDICULAR WHSE WAREHOUSE 10194 <br /> EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILiARIZE THEMSELVES WRITING BEFORE THEY MAY BE USED. WP WATER PROOF REC�9PTERED <br /> WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT 42• THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE FDN FOUNDATION PFN PREFINISHED WR WATER RESISTANT AR.C�HITECT/ <br /> � THE EXECUTION OF THE WORK.SUBMISSION OF A PROPOSAL WILL BE ARCHITECT,FOR ALL MATERIALS AND EQUIPMENT SPECIFIED.IF THE FE FIRE EXTINGUISHER pL PLATE OR PROPERTY LINE V1/SCT WAINSCOT J <br /> CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, CONTRACTOR,THE OWNER,OR THE OWNER'S REPRESENTATIVE SUBSTITUTES FEC FIRE EXTINGUISHER CABINET PLAM PLASTIC LAMINATE WT WEIGHT <br /> AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, A MATERIAL,METHOD OF ATTACHMENT,REVISES A CONSTRUCTION DETAIL, FF FACTORY FINISH PLYWD PLYWOOD /�M EGr LL <br /> EQUIPMENT,OR MATERIALS,REQUIRED BECAUSE OF DIFFICULTIES OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO FIN FINISH PNL PANEL XFMR TRANSFORMER <br /> ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH THESE DOCUMENTS,WITHOUT THE WRITTEN ACCEPTANCE OF THE FL FLOOR STATE OF WAS{i11N�TON <br /> AN EXAMINATION BEEN MADE.THE GENERAL CONTRACTOR SHALL VERIFY ALL ARCHITECT,SUCH ACTION WILL RELIEVE THE ARCHITECT OF ANY PNT PAINT YD YARD � 1 <br /> CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL RESPONSIBILITY OR LIABILITY INCLUDING,BUT NOT LIMITED TO,AESTHETIC FLG FLASHING PR PAIR `"' <br /> DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR CONSEQUENCES,SUBSEQUENT FAILURE(5)AND PERSONAL OR PROPERTY <br /> TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. DAMAGE ATTRIBUTABLE TO THIS CHANGE. <br /> 17. THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LiMITATI0N5, 43. REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY <br /> EXCLUSIONS,OR MODIFICATIONS TO THE PROJECT DURING THE BID OF WHICH THE ITEM IS A COMPONENT. <br /> SELECTIONS PERIOD.ANY AND ALL LIMITATIONS,EXCLUSIONS,OR 44. SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR <br /> MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE INADEQUATE MAY BE RETURNED WITHOUT ACTION. COSTS INCURRED FOR <br /> PRESUMED"INCLUDED",IN WHICH CASE NO ADDITIONAL MONIES WILL BE THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE <br /> ALLOCATED FOR THIS WORK. CONTRACTOR. <br /> 18. EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING 45. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF <br /> DRAWINGS.ALL EXISTING INFORMATION MUST BE VERIFIED IN THE FIELD. OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE <br /> ' NEITHER THE OWNER NOR THE ARCHITECTS ARE RESPONSIBLE FOR ACCURACY REQUIREMENTS OF THESE CONTRACT DOCUMENTS,UNLESS THE ARCHITECT <br /> OF EXISTING INFORMATION. EXISTING CONSTRUCTION CONDITIONS IN AREAS IS NOTIFIED AND SPECIFICALLY APPROVES OF,THE DEVIATIONS AT THE <br /> WHERE NEW WORK IS NOT PLANNED MAY BE NOT COMPLEfELY SHOWN. TIME OF SUBMISSION. <br /> 19. WITHIN ONE(1)WEEK(5 BUSINESS DAYS),OF THE AWARD OF THIS 46. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S <br /> CONTRACT,PRIOR TO MOBILIZATION FOR ANY WORK,THE CONTRACTOR OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS <br /> SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY AND OMISSIONS IN THE SUBMITTALS,INCLUDING"FIELD MEASURE." <br /> THE PHASES OF THE WORK,AND ALL RELATED WORK FORTHE COMPLETION OF 47. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, <br /> THE PROJECT.THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR, G EN ERAL N OTES & <br /> LENGTH OF TIME FOR EACH PHASE,ITS START AND COMPLETION,WITH A ARCHITECT OR OWNER,SHALL BE DOCUMENTED BY THE ARCHITECT AND <br /> PROJECTED COMPLEfION DATE. APPROVED,P�oRTo EXE���oN. ABBREVIATIONS <br /> 20. CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEEfINGS 4g, THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE JOB SITE <br /> REQUIRED BY THIS CONTRACT. DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY WORK.THE <br /> 21. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT CONTRACTOR SHALL CALL TO THE ATTENTION OF THE ARCHITECT,IN <br /> WORK,PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING WRITING,ALL SPECIFIC ITEMS FOR WHICH ARCHITECT'S REVIEW IS REQUIRED. <br /> AUTHORITIES'SPECIFICATIONS FOR BUT NOT LIMITED T0,GUTTERS, Proj. No: 19.0005640.000 Reviewe By: PA/PM <br /> SIDEWALKS,POLES,AND OTHER STRUCTURES,INCLUDING THE REMOVAL OR <br /> RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN <br /> � ON PLANS OR NOTEU OTHERWISE. <br /> AN . �. <br />