My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6000 23RD DR W 2017 TEAGUE Plans 2022-11-04 (2)
>
Address Records
>
23RD DR W
>
6000
>
TEAGUE
>
Plans
>
6000 23RD DR W 2017 TEAGUE Plans 2022-11-04 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 1:59:43 PM
Creation date
10/14/2020 9:51:09 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6000
Tenant Name
TEAGUE
Permit
B1708-030
Year
2017
Notes
TI CONVERT WAREHOUSE SPACE TO OFFICE SPACE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2 3 4 5 <br /> , <br /> STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TESTING - CC�NTINUED <br /> D <br /> INSPECTION TASKS PRIOR TO BOLTING: WSPECTION OR EXECUTION TASKS PRIOR TO MECHANICAL FASTENING: � . <br /> MANUFACTURER'S CERTIFICATIONS X MANUFACTURER INSTALLATION ; � <br /> AVAILABLE FOR FASTENER MATERIALS INSTRUCTIONS AVAILABLE FOR X - - . � <br /> FASTENERS MARKED IN ACCORDANCE MECHANICAL FASTENERS <br /> WITH ASTM REQUIREMENTS X PROPER TOOLS AVAILABLE FOR 1705.2.2 SDI QA/QC: APP. 1 , <br /> PROPER FASTENERS SELECTED FOR THE FASTENER INSTALLATION X � � � <br /> JOINT DETAIL (GRADE, TYPE, BOLT LENGTH X PROPER STORAGE FOR MECHANICAL X _ _ � <br /> IF THREADS ARE TO BE EXCLUDED FROM FASTENERS <br /> SHEAR PLANE) INSPECTION OR EXECUTION TASKS DURING MECHANICAL FASTENING: • " ' " " " � " <br /> - • . . .. - - � •• � <br /> PROPER BOLTING PROCEDURE FOR JOINT X _ _ FASTENERS ARE POSITIONED AS _ _ <br /> DETAIL REQUIRED X <br /> CONNECTING ELEMENTS, INCLUDING THE AISC 360: TB N5.6-1 FASTENERS ARE INSTALLED IN 1705.2.2 SDI QA/QC: APP. 1 _ _ �. . � <br /> APPROPRIATE FAYING SURFACE 1705.2 AISC 360: N5.6 ACCORDANCE WITH MANUFACTURERS X � <br /> CONDITION AND HOLE PREPARATION, IF X - - INSTRUCTIONS � _ <br /> SPECIFIED, MEET APPLICABLE INSPECTION OR EXECUTION TASKS AFTER MECHANICAL FASTENING: <br /> REQUIREMENTS <br /> CHECK SPACING, TYPE, AND INSTALLATIO <br /> OF SUPPORT FASTENERS, SIDELAP - X - <br /> 1601 Fifth Avenue,Suite 1600 <br /> PRE-INSTALLATION VERIFICATION TESTING FASTENERS, AND PERIMETER FASTENERS � Seattle,wA 98101 ' <br /> BY INSTALLATION PERSONNEL OBSERVED 1705.2.2 SDI QA/QC: APP. 1 <br /> AND DOCUMENTED FOR FASTENER X ' - VERIFY REPAIR ACTIVITIES - X - ios.6zi.ss2i <br /> ASSEMBLIES AND METHODS USED DOCUMENT ACCEPTANCE OR REJECTION _ _ kpff.com <br /> OF MECHANICAL FASTENERS X <br /> PROPER STORAGE PROVIDED FOR BOLTS, INSPECTION ., . <br /> NUTS, WASHERS AND OTHER FASTENER X - - SYSTEM OR MATERIAL IBC CODE CODE OR STANDARD FREQUENCY(NOTE 6) REMARKS . , � , . � . <br /> COMPONENTS REFERENCE REFERENCE CONTINUOUS PERIODIC <br /> INSPECTION TASKS DURING BOLTING: COLD-FORMED STEEL FRAMING <br /> � P ' 8 <br /> FASTENER ASSEMBLIES, OF SUITABLE MATERIAL VERIFICATION OF WELDING X MANUFACTURER'S CERTIFIED TEST REPORTS c���oF WAskj�q <br /> CONDITION, PLACED IN ALL HOLES AND X _ _ CONSUMABLES ��e�`� �'�o� <br /> WASHERS (IF REQUIRED)ARE POSITIONED _ AISI S100: COPY OF WELDING PROCEDURE � � C <br /> C AS REQUIRED VERIFYING USE OF PROPER WPS - - <br /> APP. A E2a X ' <br /> SPECIFICATIONS <br /> JOINT BROUGHT TO SNUG-TIGHT VERIFYING WELDER QUALIFICATIONS - X COPY OF QUALIFICATION CARDS `�� w�' �' <br /> CONDITION PRIOR TO THE X - - p��0036475�1����,�' <br /> PRETENSIONING OPERATION WELDED FRAMING CONNECTIONS - AWS D1.3: 6 - X D1 3 6E1 DS VISUALLY INSPECTED PER AWS �`�SIONA���� '�� <br /> FASTENER COMPONENT NOT TURNED BY AISC 360: TB N5.6-2 �`2� <br /> 1705.2 AISC 360: N5.6 � � <br /> THE WRENCH PREVENTED FROM X - - � <br /> ROTATING ' ' • � � • <br /> FASTENERSARE PRETENSIONED IN TABLE 2A - REQUIRED STRUCTURAL SPECIAL INSPECTI�NS FOR <br /> ACCORDANCE W ITH THE RCSC Wa re h o u se <br /> SPECIFICATION, PROGRESSING X - - <br /> SYSTEMATICALLY FROM THE MOST RIGID S E I S M I C RES I STAN C E R <br /> POINT TOWARD THE FREE EDGES U ath roo m Expa n s i o n ` <br /> INSPECTION TASKS AFTER BOLTING: INSPECTION <br /> DOCUMENT ACCEPTANCE OR REJECTION 1705.2 AISC 360: TB N5.6-3 - X _ SYSTEM OR MATERIAL IBC CODE CODE OR STANDARD FREQUENCY(NOTE 6) REMARKS FOR <br /> OF BOLTED CONNECTIONS REFERENCE REFERENCE CONTINUOUS PERIODIC <br /> INSPECTION OF STEEL ELEMENTS OF COMPOSITE CONSTRUCTION PRIOR TO CONCRETE PLACEMENT: GENERAL . � <br /> PLACEMENT AND INSTALLATION OF STEEL _ X _ REFERENCE GENERAL STRUCTURAL NOTES Teag u e/ Boe i n g � <br /> DECK AISC 360: TB N6.1 SEISMIC FORCE-RESISTING SYSTEMS (SFRS) IN FOR OUTLINE OF SFRS SYSTEM. REFERENCE <br /> 1705.2 AISC 360: N6.1 STRUCTURES ASSIGNED TO SEISMIC DESIGN - X <br /> DOCUMENT ACCEPTANCE OR REJECTION CATEGORY C, D, E OR F TABLE 2A FOR MATERIAL SPECIFIC <br /> OF STEEL ELEMENTS X 1704.3.2 INSPECTION REQUIREMENTS. AT - <br /> STEEL DECK 1705.12 <br /> DESIGNATED SEISMIC SYSTEMS (SECONDARY) IN REFERENCE TABLE N1 AND N2 FOR <br /> INSPECTION OR EXECUTION TASKS PRIOR TO DECK PLACEMENT: STRUCTURES ASSIGNED TO SEISMIC DESIGN - X - INSPECTION REQUIREMENTS. 6000 - 23rd Drive West ` <br /> VERIFY COMPLIANCE OF MATERIALS (DEC CATEGORY C, D, E OR F Everett, Wa 98206 <br /> AND ALL DECK ACCESSORIES)WITH INSPECTION OF COMPOSITE STRUCTURES PRIOR TO CONCRETE PLACEMENT: <br /> CONSTRUCTION DOCUMENTS, INCLUDING - X - COLD-FORMED STEEL FRAMING <br /> PROFILES, MATERIAL PROPERTIES, AND 1705.2.2 SDI QA/QC: APP. 1 ;. <br /> BASE METAL THICKNESS WELDED CONNECTIONS FOR DIAPHRAGM AL�WELDS VISUALLY INSPECTED PER AWS PERM IT SET � � <br /> ELEMENTS, DRAG STRUTS, SHEAR WALL AWS D1.3: 6 - X � � <br /> DOCUMENT ACCEPTANCE OR REJECTION _ X _ ELEMENTS AND BRACING. D1.3: 6.1 08/21/2017 g <br /> B OF DECK AND DECK ACCESSORIES <br /> INSPECTION OR EXECUTION TASKS AFTER DECK PLACEMENT: ALL CONNECTIONS VISUALLY INSPECTED. NOT <br /> 1705.12.3 REQUIRED IF SHEATHING IS GYPSUM BOARD, This drawing is: <br /> VERIFY COMPLIANCE OF DECK AND ALL CONNECTIONS FOR DIAPHRAGM ATTACHMENT, FIBERBOARD, OR IF SHEATHING IS WOOD 1. Copyright 2017 Dykeman, Inc. <br /> DECK ACCESSORIES INSTALLATION WITH - X - DIAPHRAGM CHORDS, DRAG STRUTS, SHEAR - ' X STRUCTURAL PANEL OR STEEL SHEET ON 2. The Architect's Instrument of Professional Service. <br /> CONSTRUCTION DOCUMENTS WALL ELEMENTS, BRACING AND HOLD-DOWNS. 3. For use on this project only. Obtain Architect's i <br /> ONLY ONE SIDE AND FASTENER SPACING IS <br /> MORE THAN 4 INCHES ON CENTER written permission for any other use or reproduction. <br /> VERIFY DECK MATERIALS ARE <br /> REPRESENTED BY THE MILL 1705.2.2 SDI QA/QC: APP. 1 - X - <br /> CERTIFICATIONS THAT COMPLY WITH THE WOOD <br /> CONSTRUCTION DOCUMENTS FASTENING OF DIAPHRAGM AND SHEAR WALL ALL FASTENING VISUALLY INSPECTED. NOT . <br /> DOCUMENT ACCEPTANCE OR REJECTION SHEATHING WITH EDGE NAILING 4 INCHES ON - - X REQUIRED WHERE THE FASTENER SPACING IS 2017-013 . � <br /> OF INSTALLATION OF DECK AND DECK - X _ CENTER OR I.ESS MORE THAN 4 INCHES ON CENTER <br /> ACCESSORIES <br /> � <br /> INSPECTION OR EXECUTION TASKS PRIOR TO WELDING: <br /> WELDING PROCEDURE SPECIFICATIONS X _ _ MARK DATE DESCRIPTION <br /> AVAILABLE (WPS) , <br /> MANUFACTURER CERTIFICATIONS FOR 1705.2.2 SDI QA/QC: APP. 1 X - - <br /> WELDING CONSUMABLES AVAILABLE <br /> MATERIAL IDENTIFICATION (TYPE/GRADE) X - - <br /> CHECK WELDING EQUIPMENT X - - <br /> INSPECTION OR EXECUTION TASKS DURING WELDING: � � � <br /> USE OF QUALIFIED WELDERS X - - � � <br /> CONTROL AND HANDLING OF WELDING X _ _ <br /> CONSUMABLES <br /> ENVIRONMENTAL CONDITIONS (WIND 1705.2.2 SDI QA/QC: APP. 1 <br /> . . � . <br /> SPEED, MOISTURE, TEMPERATURE) <br /> X PRINCIPAL IN CHARGE� - <br /> W PS FOLLOW ED X - - ° <br /> INSPECTION OR EXECUTION TASKS AFTER WELDING: PROJECT MANAGER: � - <br /> PROJECT ARCHITECT: � - <br /> VERIFY SIZE AND LOCATION OF WELDS, <br /> INCLUDING SUPPORT, SIDELAP, AND - X - JOB CAPTAIN: <br /> A I <br /> A <br /> PERIMETER WELDS � ' � <br /> WELDS MEET VISUAL ACCEPTANCE 1705.2.2 SDI QA/QC: APP. 1 - X - � � <br /> CRITERIA <br /> VERIFY REPAIR ACTIVITIES - X - STATE M E NT F <br /> DOCUMENT ACCEPTANCE OR REJECTION <br /> OF WELDS - X - SPECIAL I NSPE I <br /> � - . - w <br /> . <br /> � . ;. <br /> NOT FOR CONSTRUCTION � � � <br /> � 2 3 4 5 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.