Laserfiche WebLink
(E) BUILT-UP ROOF ROOF SEAM ���(E) C.T. "�� �� <br /> W/ GRAVEL�R� BUILT-UP ROOF W/ <br /> INSULATION BULL NOSED TILE FACE OF WPi1 • <br /> GRAVEL OVER INSULAiION (E) CMU — (EJ 2" TO 4' CONC. <br /> • �TOPPING SIAB 12 G4. WIRE <br /> � ���4x4 CANT STRIP (CONT.) . HPNGER . <br /> y �q��s IV FRP (SEE <br /> �MEfAL FlASHING W/ - ^`�y STRUCTURAL) I <br /> GRAVEL STOP <br /> I T .- ._ WOOD FRAMING, 4• <br /> _� � 7/2" PLYV/OOD -REMOVE QT. CENNG GRID <br /> REPIACE (E) & CERAMIC TILE FOR NEW BASE SFJSMIC REfNNING <br /> WSUTATION W/ � � -REMOVE S.V. O Q1P, IYP. � <br /> NEW TO MATCH SEE STRUCTURAL DWGS FOR NEW 94SE � <br /> (E) 12' HOLLOW <br /> . . (E) CONC.� CORE SLAB, TYP. � <br /> .�- (E) 12� C.I.P. CONC. �— p�pUSI1CA1 CERING 71LE <br /> -.�� ��5 SIAB WHERE OCCURS 2" <br /> (E) GWB� `� (E) CMU WALL *.,`���'._�.51ti �_ 2' PERIMEIER WH1 A10lDING, 7YP. . <br /> ti <br /> FLASHING WITH CAP SHEEf AND GRAVEL R TROOM WA I S <br /> R ON EAST SIDE OF BUILOING. • SIZE DIMENSION TO <br /> -�� COVER STRUCNRAL ACT i All T-BN2 DEfAIL 7A <br /> ROOF PATCH 1 D ETAI L STRENGTHENING. 2 D ETAI L <br /> i <br /> _ SCALE: 3/4"=1 '-0" - SCALE: 3/4"=1 '-0" � <br /> ROOM FINISH SCHEDULE g'�,, 12 fA wIRE HANGER, iYP. <br /> SOUTH <br /> = FLOOR BASE NORTH WALL WALL WEST WALL EAST WALL CEILING <br /> a 3jr�4i <br /> = ROOM No. ROOM NAME MATERIAL FINISH MATERIAL FINISH MATERIAI FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH NOTES N a _� SPACER 84R5, ttP. <br /> Y FIRST FLOOR .1,. <br /> % 101 FIRST FLOOR LOBBY (E) ACT FF 3 �� � 6 ' <br /> � ACT FF 3 CERING GPoD SEISMIC REfAINING <br /> � 106 MEN'S ROOM (E) CUP, 7YP. <br /> = 123 WATER SHED PATROL q�7 FF 3 2' PER�uEIER WAll MOLD�NG, ttP. <br /> OFFICE (E) <br /> 124 pRINT ROOM (E) ACT FF 3 ACi soSuiC T-BPR oew� 2B <br /> SECOND FLOOR � <br /> 12 GA WIRE W 4' MIN. TIGVi� <br /> � 201 CORRIDOR (E) ACT Ff 3 ENDNOFWWTMREAND�TO• DEC�CH <br /> 8 <br /> 2 202 �qg (E) GWB PT ACT FF 1, 2, 3 . <br /> � S z04 WATER QUALIN ROOM (E) GWB PT ACT FF 2� 3 SIRUi <br /> 205 LUNCH ROOM SV FP RB FF �WB PT AR FF z' 3 ��� �� <br /> � CRO55 lEE I <br /> a Z�6 KITCHEN SV FF RB FF GWB PT A�T FF z' 3 <br /> 3 <br /> 45' AlN( <br /> „ z09 WOMEN'STOILET (E) CT FF 6WB PT 4, 5 � � I <br /> y � a 210 MEN'STOILET (E) CT FF GWB PT 4. 5 <br /> 2' <br /> � ; m ZlZ CONFERENCE CPT FF RB FF GWB PT pQ FF Z, 3 � _— �N � <br /> o � _ <br /> = i > 213 LOBBY SV FF RB FP GWB PT GWB PT ACT FF Z, 3, � ar.r SOsuk 7-flVi DEfNL 2c -...:.' . . .�,� .-... <br /> 214 CONTROLROOM SV FF RB FF GWB PT GWB PT GWB PT GWB PT ACT FF 2, 3, 6 <br /> GWB CEILING <br /> 215 ppNELS SV FF RB fF GWB PT ACT FF 2, 3 -CUT Gw8 rs NEEDED TO n�LOW FOR <br /> 3 D ETAI L SEISMIC INSERTS TO BE INSTALLED <br /> E Z16 RAC ROOM (E) CONC. GWB PT EX OTS Z� 3 - -PATCH CEILING WHEN COMPLEfED <br /> SCALE: 3"=1 '-0" <br /> � \ ZZl OPS OFFICE CPT FF RB FF GWB PT ACT FF z, 3 <br /> Q z2z LIBRARY SV FF RB FF GWB PT ACT FF Z, 3 <br /> � � (E) CONC. <br /> zZ4 WITH 12" FRP (E) TOPP�NG SLAB <br /> STRIP on <br /> SODA ASH BINS North wall (E) FRP (E) (E) (E) (E) (EI OTS S � � <br /> . � <br /> NOTES MATERIAL/FINISH ABBREVIATIONS <br /> � 1 CUT OUT PORTION OF EXISTING FLOOR AS NECESSARV TO INSTALL STRUCTURAL AN6LE. DO NOT PATCH OR REPLACE FLOOR UNDER CABINETS. ACT ACOUSTIC TILE OTS OPEN TO STRUCTURE <br /> o Z CUT OUT PORTION OF INSULATION AND GWB WALLAS NECESSARYTO INSTALL STRUCTURALANGLE. INFILL NEW RIGID INSULATION AND PATCH, TAPE, MUD, CONC. CONCRETE pT PAINTTO MATCH <br /> SAND B� PAINT WALL EXISTING WAIL OR (E) REINFORCING 3/8'0 A36 THRFADED ROD INTO (E) PRECAST <br /> N w� CPT CARPET GEILING COLOR & PRESTRESSED HOLLOW CORE CONC. PANEL W/ 3/4' EMBED <br /> �i � 3 UPGRADE SUSPENDED CEILING FOR SEISMIC BRACING. SEE DETAIL 3/5-441 AND SPECIFICATION SECTION 095113 ACOUSTICAL PANEL CEILING FOR SEISMICT-BAR � CERAMIC TILE STRANDS-DO NO7 uSiNG Hi�Ti HDIP DROP IN ANCHORS OR APPROVED <br /> E GRID CEILING. ACT TILES MAY BE REUSED THAT ARE NOT CHIPPED, DIRTY OR CRACKED. RB RUBBER BASE oisiuRe EOua� io SUPPORT NONSTRUCTURAL ITEMS. USE <br /> rI NONDESTRUCTNE MEANS TO LOCATE AND AVOID <br /> � I 4 CUT OUT PORTION OF GWB CEILING AS NECESSARY TO INSTALL STRUCTURAL ANGLE. PATCH GWB CEILING, TAPE, MUD, SAND & PAINT. (E) EXISTING VCT VINYL COMPOSITION TILE CUrnNG REiNFORCING & PRESTRESSED STRnNDS iN i � <br /> V N � PANEL PRIOR TO DRIWNG HOLES. ADJUST HOLE <br /> REMOVE CERAMIC TILE FLOOR AND PORTION OF CT WALL AS NECESSARY TO INSTALL STRUCfURAL ANGLE. PROVIDE CT CURB AT FLOOR AND WALL PER DETAIL FF FACTORY FINISH LOCATION AS NEEDED. Uu17 LOAD TO NOT MORE � 'J' <br /> �i I a m 5 SV SHEET VINVL THqN 200�j TENSION & 400�/ SHEAR FOR EACH z q <br /> 2/5-441. MATCH EXISTING FLOOR AND WALL TILE COLOR AS CLOSE AS POSSIBLE. FRP FIBER REINFORCED qNCHOR. � <br /> REMOVE ENTIRE FLOOR COVERING AND PROVIDE FRP PER STRUCTURAL. PROVIDE SV OVER FRP. USE SELF-LEVELING CEMENTTAPERED DOWN AT TRANSITIONS pp�yMER WRGWB WATER RESISTANT GWB � � o <br /> �' � I 6 FROM NEW SV FIOOR LEVELTO EXISTING FLOOR LEVELS. BACKING ueN�FR�/pNGHORS TO SLnB SOFFIT z a <br /> o a � y � REMOVE ENTIRE FLOOR COVERING IN LOBBY AND PROVIDE STRIP OF FRP AS SHOWN ON STRUCTURAL DRAWING 2/5-100. PROVIDE SV OVER FRP. USE GWB GYPSUM WALLBOARD � ''' <br /> 4 D ETAI L W � '� <br /> SELF-LEVELING CEMENTTAPERED DOWN ATTRANSITIONS FROM NEW SV FLOOR LEVELTO EXISTING FLOOR LEVEL IN LOBBY � NO WORKTO BE DONE � " a <br /> JN <br /> WSHADEDAREAS - SC.4�E: 3/4"=1 '-0' � <br /> 8 ALONG NORTH WALL OF ROOM, REMOVE EX. FLOOR COATING AND ROUGHEN CONCRETE FOR 12" WIDE TO ALLOW FRP TO BE ATTACHED TO FLOOR AND WALL. �' <br /> U <br /> �- Z <br /> 5ca1e CITY OF EVERETT ���w��9 � <br /> c o,�oe�,s ISSUED FOR PERMIT .�� • "�f,�c �en' � sr",ow"n, WFP OPERATIONS BUILDING <br /> . B ,2,Si,5 90R SET ISSUED FOR Cltt REVIEW , p�;y� ey_ SEISMIC RETROFIT NONSTRUCTURAL DETAILS 5 - 441 <br /> A 11/OS/15 SOR SET ISSUED FOR CITY REVIEW �� KWF pUBLIC WORKS <br /> � NO. DATE AI'RVD REVISION �" �."�'peMetl �" /� �/�/� S H E ET � sn..c rvo. <br /> 0 0 � B�o PL4NS ISSUED CONST AS—BLT �,��� � '---- EVEREtt UTILITIES DEPARTMENT /r+1��.VM <br /> 4 � x DATE PRVD ACTION: DATE APRVD ACTION: DATE PRVD ACTION: 09-11 -15 <br />