PLUMBING LEGEND ELECTRICAL LEGEND PLUMBINC DESIGN CRITERIA ABBREVIATIONS
<br /> WIRING PLUMBING BASIS OF DESIGN
<br /> SYMBOL DESCRIPTION ABv ABOVE H� HUB DRAIN .
<br /> A. THE PROJECT INCLUDES A STRUCTURAL RETROFIT FOR A 13,800 SQUARE FOOT, WATER FILTRATION PLANT OPERATIONS AD ACCESS DOOR HP HORSEPOWER
<br /> BUILDING OF THE ORIGINAL CONSTRUCTION BUILT IN 1981. ADA AMERICANS WITH DISABILITIES HW HOT WATER
<br /> TRAP PIMER SYMBOL DESCRIPTION B. THE DE51GN INCLUDES THE FOLLOWING NOTABLE FEATURES, BUT IS NOT LIMITED TO THIS SCOPE. CONTRACTOR IS ACT
<br /> RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS AND COORDINATING WITH ALL DISCIPLINES. HWFU HOT WATER FIXTURE UNIT
<br /> � _.___.___._____ WIRING CONCEALED (N CEILING OR WALL, LINE WEIGHT TOP TO BOTTOM= AFF ABOVE FINISHED FLOOR IAPMO INTERNATIONAL ASSOCIATION
<br /> BALL VALVE _____________________ NEW, EXISTING TO REMAIN, FUTURE 1. RELOCATE EXISTING PIPING SYSTEMS TO ACCOMMODATE STRUCTURAL SEISMIC UPGRADE. AFG ABOVE FINISHED GRADE OF PLUMBING AND
<br /> GATE VALVE ----- WIRING CONCEALED IN FLOOR OR UNDER GRADE OR ROUTED IN CElLING 2. OWNER HAS ELECTED TO RELOCATE SOME ITEMS AS INDICATED ON THE PLANS. COORDINATE AL� WORK WITH THE OWNER
<br /> AP ACCESS PANEL MECHANICAL OFFICIALS
<br /> FOR ALL SYS7EM SHUT-DOWN AND SYSTEM RELOCATION. ARCH ARCHiTECT ICBO INTERNATIONAL CONFERENCE
<br /> - - - - - SPACE OF FLOOR BELOW. LINE WEIGHT TOP TO BOITOM= NEW, EXISTIN6 OF BUILDING OFFICIALS
<br /> ------------------ TO REMAtN� FUTURE ASR AUTO FlRE SPRINKLER RISER
<br /> BALANCING VALVE 3. PROVIDE FLEX CONNECTION TO ISOLATE POLY TANKS AND DAY TANK LOCATED OUTSIDE OF THE OPERATIONS BUILDING: ASR AUTO FIRE SPRINKLER RISER I.E. INVERT ELEVATION
<br /> )E-1f-��E' EXISTING WIRING TO BE REMOVED a. PROVIDE FLEX FITTINGS TO ALUM POLY TANKS AWG AMERICAN WIRE GAUGE f.R.R. IRRIGATION
<br /> ANGLE GATE VALVE -T TELEPHONE SYSTEM CONDUIT b. PROVIDE FI.EX CONNECTION TO DAY TANK PVC PIPE BEL BELOW LAV LAVATORY
<br /> BFV BUTTERFLY VALVE LBS POUNDS (UNIT OF FORGE) ,
<br /> MV- MEDIUM VOLTAGE CONDUIT c. PROVIDE PVC PIPE MODIFICATIONS IN CHEMICAL TANK BHP BRAKE HORSEPOWER LP LUBRICATED PLUG VALVE
<br /> � � CHECK VALVE C. CODES AND STANDARDS BTU BRITISH THERMAL UNIT MAX MAXIMUM
<br /> -G- BARE GROUNDING GRID OR CONDUCTORS, UON. BV BALL VALVE MBH THOUSANDS BTU/HR
<br /> -��- PRESSURE REDUCING VALVE 1. WASHINGTON BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ): BWV BACKWATER VALVE MCCB MOLDED CASE CIRCUIT
<br /> -GC GROUNDING CONDUCTOR(S) ROUTED IN CODE SIZED CONDUIT, UON. a. 2012 INTERNATIONAL BUILDING CODE (IBC) WITH STATE AMENDMENTS CA COMPRESSED AIR BREAKER
<br /> RELIEF VALVE
<br /> CD CONDENSATE DRAIN MECH MECHANICAL
<br /> � STROKES INDICATE QUANTITY OF #12 AWG. CONDUCTORS, UON. NOTE: b. 2012 UNIFORM PLUM8ING CODE (UPC) WITH STATE AMENDMENTS CFF CAP FOR FUTURE MFR MANUFACTURER
<br /> VACUUM RELIEF VALVE WIRING STROKES FOR 20A BRANCH CIRCUITS ARE NOT SHOWN ON
<br /> -�I"�-- CFH CUBIC FEET PER HOUR MIN MINIMUM
<br /> PRESSURE & TEMPERATURE RELIEF VALVE DRAWINGS. CONTRACTOR SHALL USE INFORMATION IN PANE� AND BRANCH c. 2012 NATIONAL FUEL GAS CODE (NFGC) NFPA 54, WAC 51-52 CFM CUBIC FEET PER MINUTE MH MANHOLE
<br /> CIRCUIT SCHEDULES TD PROVIDE REQUIRED CIRCUITING.
<br /> d. 2012 WASHINGTON STATE ENERGY CODE (WAC 51-11, WSEC) CFS CUBIC FEET PER SECOND N.C. NORMALLY CLOSED
<br /> � _�� CONDUIT RUN TURNED WP THROUGH FLOOR OR CEILING. CORE & D. DOMESTIC WATER SYSTEM CI CAST IRON NFPA NATIONAL FIRE PROTECTION
<br /> AUTOMATIC AIR VENT FIREPROOF AS REQUIRED. CLG CEII.ING ASSOCfATiON
<br /> 1. PIPE SIZING CRITERIA BASED ON THE REQUIREMENTS OF THE STATE OF WASHINGTON 2012 EDITION OF THE UNIFORM CO CLEANOUT N0. NUMBER
<br /> CIRCUIT SETTER CONDUIT RUN TURNED DOWN THROUGH F�OOR OR CEILING. CORE & PLUMBING CODE, WITH AMENDMENTS. CONC CONCRETE N.O. NORMAL.LY OPEN
<br /> ��F-- UNION FIREPROOF AS REQUIRED. 2. PIPE SIZES ARE BASED ON A MAXIMUM 0.5 PSI FRICTION LOSS FOR COPPER PIPE AT A MAXIMUM VELOCITY OF 4 FPS,
<br /> CONDUIT STU86ED OUT AT LOCATION SHOWN. PROVIDE INSUTATED AND, A PREDOMINANTLY VALVE TYPE OF SYSTEM REQUIRING A MINIMUM RESIDUAL PRESSURE OF 30 PSI. CONN CONNECTION NIC NOT IN CONTRACT
<br /> STRAINER CONTR CONTRACTOR OFCI OWNER FURNISHED
<br /> STRAINER WITH BLOW OFF BUSHING & PULLROPE. E. SANITARY WASTE AND VENT SYSTEM
<br /> CONT CONTINUATION CONTRACTOR INSTALLED
<br /> TELEPHONE/DATA SLEEVE THROUGH WALL, ABOVE CEILING. EXTEND TO 1. ALL PIPING SHALL BE SLOPED AT �/4 INCH PER F�OT COORD COORDINATE OW OIL WASTE
<br /> 7 CAP OR PLUG ACCESSIBLE TILE CLG. BOTH SIDES. TERMINATE WITH BUSHINGS. (1) 1.25" CS CIRCUIT SETfER POC POINT OF CONNECTION
<br /> � CO UON. COORDINATE LOCATIONS WITH CABLE INSTALLER(S) PRIOR TO F. PLUMBING SEISMIC DESIGN CRITERIA POLY POLYMER
<br /> CV CHECK VALVE
<br /> ROUGH-IN. 1. HORIZONTAI. = PLUS OR, MINUS 2��" PLBG PLUMBING
<br /> -I I C0�11VC0 CLEANOUT/WALL CLEANOUT CW COLD WATER
<br /> 2. VERTICAL = 0 INCHES. CW(FU) COLD WATER FIXTURE UNIT PRV PRESSURE REDUCING VALVE
<br /> -�FCO FLOOR CLEANOUT � BASKEf TYPE CABLE TRAY WITH 90 DEGREE ELBOW SHOWN DN DOWN PS PRESSURE SWITCH
<br /> 3. ANCHORAGE AND RESTRAINTS MUST BE COORDINATED WITH STRUCTURAL ENGINEER AND AUTHORITY HAVING JURISDICTION. PSI POUNDS PER SQUARE INCH
<br /> DCVA DOUBLE CHECK VALVE ASSEMBLY pT PRESSURE TEMPERATURE
<br /> -�- YCO YCO YARD CLEANOUT DDCVA DOUBLE DETECTOR CHECK TRAP (PETE'S PLUG)
<br /> 1� SLOPE� � LADDER NPE CABLE TRAY WITH 90 DEGREE ELBOW SHOWN VALVE ASSEMBLY PV PROCESS VENT
<br /> DIRECTION OF SLOPE G E N E R A L N O T E S DFU DRA�NAGE FIXTURE UNIT p�/ PLUG VALVE
<br /> DIRECTION OF FLOW HWR HOT WATER RECIRC RI&C ROUGH IN AND CONNECT
<br /> DIA DIAMETER RPBFP REDUCED PRESSURE
<br /> 1. FIELD VERIFY ALL EQUIPMENT, DUCTWORK AND, APPURTENANCES PRIOR TO COMMENCING WORK. NOTIFY OWNER OF ANY DSN DOWNSPOUT NOZZLE
<br /> �, PIPE UP OR UP & DN ELECTRICAL DESIGN CRITERIA PRINCIPLE BACKFLOW
<br /> m DISCREPANCIES OF ACTUAL INSTALLATIONS D DRAIN
<br /> PREVENTER
<br /> m � PIPE DOWN DWG DRAWING RPM REVOLUTIONS PER MINUTE
<br /> ° ELECTRICAL BASIS OF DESIGN 2. MAINTAIN AN ORDERLY AND CLEAN WORK SITE. CIIY PRODUCES A PRODUCT FOR GONSUMPTION. SITE DUST AND DIRT DWV DRAINAGE WASTE AND VENT
<br /> � � �--- PIPE DROP A. THE PROJECT INCLUDES A STRUCTURAL RETROFIT FOR A 13,800 SQUARE FOOT, WATER CONTROL IS REQUIRED. EXIST EXISTING �/ RELIEF VALVE
<br /> � o TOP CONNECTION - BRANCH LINE FILTRATION PLANT OPERATIONS BUILDING OF THE ORIGINAL CONSTRUCTION BUILT IN 1981. 3. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH PLUMBING SPECIFICATIONS. ELEC ELECTRICAL SD STORM DRAIN
<br /> B. THE DESIGN INCLUDES THE FOLLOWING NOTABLE FEATURES, BUT IS NOT LIMITED TO THIS FA FLOW ALARM SF SQUARE FEET '
<br /> BOTTOM CONNECTION - BRANCH LINE SCOPE. CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS AND 4. AS-BUILT RECORD DOCUMENTS: AT PRQJECT CLOSEOUT, CONTRACTOR SHALL SUBMIT DETAILED INSTALLATION DRAWINGS, FC FLEXIBLE CONNECTION SHT SHEET
<br /> ° F FIRE MAIN COORDINATING WITH ALL DISCIPLINES. CHANGE ORDERS AND SPECIFICATION CHANGES TO ARCHITECT FOR APPROVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL FCO FLOOR CLEANOUT SMACNA SHEET METAL AND AIR
<br /> � 1. RELOCATE EXISTING ELECTRICAL CONDUIT TO ACCOMMODATE STRUCTURAL SEISMIC DETAILS. FDV FIRE DEPARTMENT VALVE CONDITIONING CONTRACTORS
<br /> N � qS AUTOMATIC WET SPRINKLER UPGRADE. FDVC FIRE DEPARTMENT VALVE SN SNEET NOTE
<br /> 5. DETAILED INVESTIGATION OF EXISTING CONDITIONS ARE PART OF THE CONTRACT WORK. VISIT THE JOB SITE PRIOR TO BID. CABINET SOV SHUT-OFF VALVE
<br /> � o � - coLD wATER 2. OwNER HAS ELECTED TO RELOCATE SOME ITEMS AS INDICATED ON THE PLANS. REVIEW AVAILABLE EQUIPMENT LAYOUTS, ASSEMBI.Y DRAWINGS AND INSTALLATION SCHEDULES. FFE FINISHED FLOOR ELEVATION
<br /> COORDINATE ALL WORK WITH THE OWNER FOR ALL SYSTEM SHUT-DOWN AND SYSTEM FH FIRE HYDRANT SPR SPRINKLER
<br /> . � � i a - - HOT WATER (120'F) RELOCATION. 6. OBTAIN WRITTEN PERMISSION FROM OWNER BEFORE PROCEEDING WITH ANY CUTTING OR PATCHING OF STRUCTURAL SYSTEMS. SV SOLENOID VALVE
<br /> m ._ FHV FIRE HOSE VALVE S.S. STAINLESS STEEL
<br /> � o m - - - HOT WATER CIRC (110'F) C. CODES AND STANDARDS FIN FINISHED TB THRUST BLOCK
<br /> 7. VISIT SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING PROPOSALS.
<br /> °_ ° 1. NFPA 101 LIFE SAFEfY CODE: 2012 EDITION FLEX FLEXIBLE TP TRAP PRIMER
<br /> i > SAN - SANITARY SEWER, WASTE �
<br /> � TS TAMPER SWITCH
<br /> Q 8. REFER TO THE ARCHITECTURAL INTERIOR DETAILS FLOOR PLANS ELEVATIONS AND THE STRUCTURAL AND OTHER CONTRACT FLR FLOOR
<br /> - SD - STORM DRAIN 2. NFPA 110 : STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS: 2010 EDITION DRAWINGS, AND COORDINATE THE WORK WITH THAT OF THE OTHER TRADES TO AVOID INTERFERENCE. ALL DIMENSIONS AND FLSW FLOW SWITCH 1T TEST TEE •
<br /> 3. WASHINGTON BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ): EXISTING CONDITIONS WILL BE CONFIRMED IN THE FIELD. FO FUEL OIL T1'P TYPICAL
<br /> - PIPING BELOW GRADE FPS FEET PER SECOND U URINAL
<br /> a. 2012 INTERNATIONAL BUILDING CODE (IBC) WITH STATE AND LOCAL AMENDMENTS. 9. OBTAIN A COMPLEfE SET OF AS-BUILT DRAWINGS FROM THE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR VISUALLY UN UNION
<br /> � WASTE, OR SOIL ABOVE GRADE OR FLOOR b. 2012 INTERNATIONAL RESIDENTIAL CODE WlTH STATE AND LOCAL AMENDMENTS. VERIFYING ALL EXIST(NG CONDITIONS. FRM FROM
<br /> m FRP FIBER REINFORCED UON UNLESS OTHERWISE NOTED
<br /> � ----------- VENT c. 2012 INTERNATIONAL MECHANICAL CODE (IMC) WITH STATE AND LOCAL AMENDMENTS. POLYMER VB VACUUM BREAKER
<br /> � a d. 2012 UNIFORM PLUMBING CODE (UPC} WITH STATE AND LOCAL AMENDMENTS. lO.OBTAiN AND PAY FOR ALL REQUIRED FEES, PERMITS AND INSPECTIONS. � FE� V VENT
<br /> � G NATURAL GAS (7"W.C.) e. 2012 INTERNATIONAL FIRE CODE (IFC) WITH STATE AND LOCAL AMENDMENTS. VTR VENT THROUGH ROOF
<br /> , o m 11.COORDINATE ALL WORK WITH ARCHITECTURAL, MECHANICAL AND STRUCTURAL DRAWINGS. IN5TALL ALL WORK TO CLEAR NEW FT FLUSH TANK
<br /> � � f. 2014 NATIONAL ELECTRfCAL CODE (NEC) AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPES, DUCTS, OR DUCTWORK, EfC., IS TO BE (FU) FIXTURE UNIT W WASTE
<br /> � � CA COMPRESSED AIR 2012 WASHINGTON STATE ENERGY CODE WAC 51-11, WSEC IN CONTACT WITH ANY EQUIPMENT. ADJUST EXISTING PIPING AND DUCTWORK IF REQUIRED TO ACCOMMODATE NEW WORK.
<br /> g. ( ) FUT FUTURE WC WATER CLOSET
<br /> VAC VACUUM INSTALL ALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE. MAINTAIN AN 8" CLEAR ZONE ABOVE THE CEILING. �/ FLUSH VALVE W.C. WATER COLUMN
<br /> D. SITE WORK G GAS WHA WATER HAMMER ARRESTOR
<br /> 12.FURNISH AND INSTALL MATERIALS, EQUIPMENT AND LABOR AS SHOWN AND AS NECESSARY FOR COMPLETE WORKABLE
<br /> pW PROCESS WATER GAL GALLONS WCO WALL CLEANOUT '
<br /> 1. REFER TO CIVIL PLANS FOR SITE SCOPE OF WORK. EXTEND ALL UTILITIES (POWER, SYSTEMS. GC GAS COCK W/ WITH
<br /> EXISTING TO BE REMOVED TELECOMMUNICATIONS, SECURITY, PLUMBING, ETC.) 5 FEET PAST BUILDING LINE FOR 13.GUARANTEE ALL WORK AND MATERIALS FOR ONE (1) YEAR FROM DATE OF SUBSTANTIAL COMPLETION. GPH GA�LONS PER HOUR WGT WEIGHT
<br /> EXTENSION BY OTHERS GPM GALLONS PER MINUTE Y.B. YARD BOX
<br /> m E. SEfSMIC DESIGN CRITERIA 14.RESTORE ALL DAMAGE RESULTING FROM WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN FINISHED WITH WORK. ANY GV GATE VALVE
<br /> PLUMBING EQUIPMENT
<br /> T 1. HORIZONTAL = PLUS OR, MINUS 2�� DAMAGE NOT REPAIRED TO OWNER'S SATISFACTION WILL BE COMPLETED BY OWNER. ALL COSTS WILL BE THE RESPONSIBILITY
<br /> � �; OF THE CONTRACTOR.
<br /> . ��', o SHEET NOTE 2. VERTICAL = 0 INCHES. G I S
<br /> � 3. ANCHORAGE AND RESTRAINTS MUST BE COORDINATED WITH STRUCTURAL ENGINEER AND 15.NOTIFY OWNER 2 WEEKS IN ADVANCE BEFORE ANY BUILDING SYSTEM IS SHUT DOWN. COORDINATE SHUTDOWN WITH OWNER.
<br /> � 1 DETAI� N0. AUTHORITY HAVING JURISDICTION. REFERENCE DIVISION G-002 FOR COMPLETE REQUIREMENT. MEP-001 LEGEND, ABBREVIATIONS, SCHEDULES, AND DRAWING LIST
<br /> �� P2 SHEET N0. F. SCOPE 16.PROVIDE "AS BUILT"DRAWiNGS INCLUDING ALL DIAGRAMS, SERVICE CONTRACT, GUARANTEES, AND OTHER APPLICABLE MEP-100 FOUNDATION PLAN
<br /> � 1. FURNISH AND INSTALL COMPLETE ALL MATERIALS, EQUIPMENT AND LABOR AS SHOWN DOCUMENTS, TO OWNER PER SPECIFICATIONS. MEP-101 FIRST FLOOR PLAN �
<br /> �i AND AS NECESSARY FOR COMPLETE WORKABLE SYSTEM. MEP-102 SECOND FLOOR PIAN
<br /> o �, � POINT OF CONNECTION 2. OBTAIN AND PAY FOR ALL REQUIRED FEES, PERMITS AND INSPECTIONS. 17 SERV C AND E ORE�PERATIONAL�TESTS AREKP�FORMED.REIGN MATERIAL AND ROUGH SPOTS PRIOR TO BEING PIACED �N MEP-901 DETAILS - PLUMBING
<br /> � � # POUNDS OR NUMBER
<br /> � � 3. GUARANTEE ALL WORK AND MATERIALS FOR ONE YEAR FROM DATE OF FILING NOTICE OF
<br /> COMPLETION. 18.PRESSURE TEST EACH SY�TEM OF PIPING AND DUCTWORK IN ACCORDANCE WITH RECOGNIZED INDUSTRY STANDARDS.
<br /> °D � 4. DISCONNECT AND REMOVE ALL DEVICES, CONDUIT, AND WIRE REQUIRED TO 19.PROTECT THE OCCUPANT FROM INJURY DURING PROGRESS OF THE WORK BY A REASONABLE METHOD AS APPROVED BY THE
<br /> 00 � � ACCOMMODATE STRUCTURAL SEISMIC UPGRADES. FIELD VERIFY EXISTING CONDITIONS AND OWNER.
<br /> • 3 m a COORDINATE WITH OWNER PRIOR TO STARTING WORKS. REINSTALL ELECTRICAL SYSTEMS
<br /> o � � TO BE FULLY FUNCTIONAL AND OPERATIONAL. COORDINATE WITH STRUCTURAL FOR 20.MAINTAIN ADEQUATE FIRE EXTINGUISHERS READY FOR USE IN CASE OF FIRE.
<br /> RE-UTILIZING EXISTING SUPPORTS.
<br /> 21.VERIFY ALL CONNECTIONS TO EXISTING WORK.
<br /> 22.REMOVE ALL ABANDONED EQUIPMENT AND ASSOCIATED PIPING, ETC., UNLESS OTHERWISE SPECIFIED BY OWNER. '
<br /> Scale:
<br /> Drowing No.
<br /> ., ve�z� As sHowN , C I TY O F EVE RETT OPERATIONS BUILDING
<br /> 01 08 16 ISSUED FOR PERMIT C LUM1�C , l��P 001
<br /> 12 15 15 90% SET ISSUED FOR CIIY REVIEW � � Designed By: SEISMIC RETROFIT �EG EN D AB B R EVIATI O N S
<br /> � A 11 05 15 50� SET ISSUED FOR CITY REVIEW engineers for a s�staina,le future� p U B L 1 C WO RK� � ' Sheet rvo.
<br /> ui
<br /> g N0. DATE APRVD REVISION Inspected By:
<br /> ,�,��hAY�.���,o � , � S H U LE , AN D AW I N G LI S
<br /> ' °� °' P LAN S I S S U ED Fo R: Sea�.WA�,o, -�--- EVERETT
<br /> � � T.zos.zsz.,o,o www.glumac.com W.�. N�.: U T 1 L 1 T 1 E S D E PA RT M E N T
<br /> Pro'ct Mana er. M.Aia a
<br /> � � B�� C 0 N ST AS-B LT EngineerlDesigner. M.A6aga Dote: �
<br /> � X DATE APRVD ACTION: DATE APRVD ACTION: DATE APRVD ACTION: �obNo.: 05.15.01� 1 1 -05-2015
<br /> Of Total
<br />
|