|
soh es
<br /> mith
<br /> h i t cts `�
<br /> arc e �
<br /> 1928 43rd Ave E., Ste A
<br /> Seattle , WA 98112
<br /> GENERAL LANDSCAPE NOTES PLANTING SPECIFICATION � 2 0 6 � 4 5 3 - 4 0 5 3 .
<br /> — shoesmithcox . com
<br /> 1. SEE L1.02 FOR PLANT SCHEDULE. BMP T5.13: POST-CONSTRUCTION SOIL QUALITY AND DEPTH
<br /> 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF
<br /> 2. PLANTING SHALL CONFORM TO ALL EVERETT CODE REQUIREMENTS, INCLUDING 10% DRY WEIGHT IN PLANTING BEDS AND 5% ORGANIC CONTENT IN
<br /> PRESERVATION OF ADEQUATE INTERSECTION SIGHT DISTANCE LINES/TRIANGULAR AREAS. TURF AREAS, WITH A pH FROM 6.0 -8.0 OR MATCHING THE pH OF
<br /> THE UNDISTURBED NATIVE SOIL.
<br /> 3. CONTRACTOR SHALL VERIFY ON-SITE CONDITIONS PRIOR TO BIDDING AND CONSTRUCTION.
<br /> 2. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF EIGHT
<br /> 4. INSTALL AUTOMATIC UNDERGROUND IRRIGATION SYSTEM IN ALL NEW AND RENOVATED INCHES EXCEPT WHERE TREE ROOTS �IMIT THE DEPTH OF
<br /> LANDSCAPE AREAS. MAINTAIN WATER SUPPLY TO EXISTING SYSTEM DURING GROWING INCORPORATION OF AMENDMENTS NEEDED TO MEET THE
<br /> SEASON. CRITERIA.
<br /> 5. THE CONTRACTOR AND OWNER ARE RESPONSIBLE FOR READING THE PLANS, 3. SUBSOILS BELOW THE TOPSOIL LAYER SHALL BE SCARIFIED AT
<br /> SPECIFICATIONS AND NOTES. LEAST FOUR INCHES WITH SOME INCORPORATION OF THE UPPER
<br /> MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE.
<br /> 6. THE CONTRACTOR SHALL VERIFY ALL PLANT MATERIAL QUANTITIES PRIOR TO INSTALLATION.
<br /> ANY PLANT MATERIAL QUANTITIES LISTED ARE FOR THE CONVENIENCE OF THE CONTRACTOR. 4. PLANTING BEDS SHALL BE MULCHED WITH 2 INCHES OF ORGANIC
<br /> ACTUAL NUMBER OF SYMBOLS SHALL HAVE PRIORITY OVER QUANTITY DESIGNATED. THE MATERIAL.
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR COUNTING THE TOTAL NUMBER OF PLANTS
<br /> INDICATED ON THE PLANS AND ESTIMATING GROUNDCOVER QUANTITIES. 5. MULCH TO BE FREE OF DELETERIOUS MATERIALS AND SUITABLE
<br /> AS A TOP DRESSING OF TREES AND SHRUBS, CONSISTING OF
<br /> 7. THE CONTRACTOR SHALL FURNISH AND PAY FOR ALL CONTAINER OR FIELD GROWN TREES, COMPOSTED AGED (MIN. 1 YEAR) FIR OR HEMLOCK BARK CHIPS
<br /> SHRUBS AND GROUNDCOVERS, INCLUDING SEEDED AND SODDED TURF, HYDROMULCHES AND TO BE DARK (BLACK) IN COLOR. COMPOST MULCH TO BE
<br /> AND FLATTED GROUNDCOVERS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE AND PAY WELL-COMPOSTED, STABLE AND WEED-FREE ORGANIC MATTER
<br /> FOR: PLANTING OF ALL PLANT MATERIALS; THE SPECIFIED GUARANTEE OF ALL PLANT WITH ORGANIC MATTER COMPRISING 50 TO 60 PERCENT OF DRY
<br /> MATERIALS; THE STAKING AND GUYING OF TREES AND THE CONTINUOUS PROTECTION OF ALL WEIGHT.
<br /> PLANT MATERIALS UPON THEIR ARRIVAL AT THE SITE. S k i 11 e d n u rs i n g `
<br /> 6. TOP OF MULCH SHALL BE FLUSH WITH FINISH GRADES. DO NOT
<br /> 8. MINIMIZE DISTURBANCE OF EXISTING PLANTING TO REMAIN. WHEN INFILL PLANTING AROUND PLACE MULCH WITHIN 2 INCHES OF TRUNKS OR STEMS. a d (;� I t I O I7 S
<br /> EXISTING PLANTING, DIG ONLY AS NEEDED PER INDIVIDUAL PLANT. TYPICAL SOIL
<br /> PREPARATION DOES NOT APPLY TO THESE AREAS. APPLY 2 LAYER OF MULCH. PREPARATION:
<br /> • 1. CLEAN SOIL OF CONCRETE SLURRY, CONCRETE LAYERS OR
<br /> CHUNKS, CEMENT, PLASTER, BUILDING DEBRIS, OILS, GASOLINE, 2235 Lake Heights Drive
<br /> DIESEL FUEL, PAINT THINNER, TURPENTINE, TAR, ROOFING
<br /> COMPOUND, ACID AND OTHER EXTRANEOUS MATERIALS THAT ARE Everett WA 9�ZOH
<br /> HARMFUL TO PLANT GROWTH. �
<br /> PLACING MANUFACTURED PLANTING TOPSOIL OVER EXPOSED
<br /> SUBGRADE:
<br /> 2. APPLY AND MIX APPROXIMATELY HALF THE THICKNESS OF
<br /> TOPSOIL OVER PREPARED, LOOSENED SUBGRADE. SPREAD
<br /> REMAINDER OF T�PSO�L.
<br /> 3. SPREAD UNAMENDED SOIL TO TOTAL DEPTH REQUIRED TO MEET
<br /> FINISH GRADES AFTER NATURAL SETTLEMENT. DO NOT SPREAD IF
<br /> � SOIL OR SUBGRADE IS FROZEN, MUDDY, OR EXCESSIVELY WET.
<br /> 4. APPLY AND MIX TOPSOIL IN LIFTS NOT EXCEEDING 8 INCHES IN
<br /> LOOSE DEPTH FOR MATERIAL COMPACTED BY COMPACTION � �� � � � �
<br /> EQUIPMENT, AND NOT MORE THAN 6 INCHES IN LOOSE DERTH FOR
<br /> MATERIAL COMPACTED BY HAND-OPERATED TAMPERS.
<br /> of the Northwest
<br /> NO. DATE REVISION �
<br /> �'� 1/2812019 DOH CRS Response#1
<br /> CITY OF EVERETT
<br /> 4� _4/29/2019 RESPONSE#1_(PW�___
<br /> • CITY OF EVERETT
<br /> ,�5� 5131/2019 RESPONSE#2 PW�
<br /> � PROJECT MANAGER
<br /> CT
<br /> PROJECT ARCHITECT �
<br /> PROJECT TEAM MEMBERS
<br /> MS, BV
<br /> ---------------_------- —
<br /> CHECK
<br /> CS .
<br /> ARCHITECT SEAL �
<br /> �F W A sy�
<br /> _ ,<<(i P��', R. SK�AT�/
<br /> .,
<br /> � `���J; � I�� � O
<br /> - � 1' -
<br /> . '�
<br /> � `
<br /> r , ^ �
<br /> ! � V
<br /> Y�i2� i;�, ��`1'o,`�U
<br /> �s �EXP.03�� ��
<br /> Cq P E ARG
<br /> 05.31 .2019
<br /> TITLE
<br /> Civil Engineers -�- ���D�����
<br /> �� ., �
<br /> Structural Engineers - �������������
<br /> ,,, .�,.. , �
<br /> Landscape Architects '�= �`�
<br /> ------------------- -—---_ ---
<br /> Community Planners � � & N�T E S
<br /> Natural Resource Ecologists ' �
<br /> - � �� PROJECT NO.
<br /> Land Surveyors
<br /> Neighbors 1$.03-�1
<br /> DATE ----- .
<br /> � � 5/06/2019
<br /> .
<br /> :
<br /> --__----- ------ ---____
<br /> - PROJECT NETWORK PATH
<br /> .., - TACOMA • SEATTLE
<br /> O ���`� �� �VE����
<br /> z. ` c� �[� SPOKANE • TRI - CITtES
<br /> ----------_----
<br /> __--- ----------- --_
<br /> �'.. 9 `_;�-, �`���I��i��,��� �1...,r`i�. ����r��i � SNEETNUMBER �
<br /> � 2215 North 30th Street, Suite 300 Tacoma, WA 98403
<br /> � ` 253.383.2422 TE� 253.383.2572 F�c www.ahbLcom wE6
<br /> ■
<br /> Know what's b@IOW. Y
<br /> Cal� before you dig.
<br /> N OT FO R C O N ST R U CT I O N PERMIT SET
<br /> COPYRIGHT O 2018 shoesmith cox architects
<br /> DATE: May 8, 2019 FILENAME: Q:\201812180406\40_LAN\CAD\2180406-SH-PLANTING PLAN.dwg
<br />
|