<br /> -�- -- --'� - -� CITY OF EVERETT TESC NOTES DEMOLITION NOTES
<br /> � NOTES � 1. APPROVA�OF THIS EROSION/SEDIMENTATION CONTROL(ESC) 1. DEMOLITION: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO m i t h .
<br /> TCH BASIN INSERTS SHALL BE REMOVED AT THE PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD INCLUDE THE DEMOLITION OF ALL EXISTING BUILDINGS, PAVING, UTILITIES S
<br /> hoes
<br /> 5" MAX 1 END OF THE PROIECT. ; OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, AND OTHER EXISTING SITE IMPROVEMENTS INCLUDING THEIR
<br /> DRAINAGE GRATE RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). UNDERGROUND COMPONENTS AS INDICATED BY THIS DRAWING AND AS
<br /> -TRIM
<br /> 2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN REQUIRED FOR NEW CONSTRUCTION. IT IS THE CONTRACTOR'S
<br /> DRAINAGE DEVICES PER THE MANUFACTURES'S 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE RESPONSIBILITY TO FULLY REVIEW THE SITE CONDITIONS AND TO
<br /> RECOMMENDATIONS. CATCH BASIN INLET INSERTS CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING CORRELATE THESE OBSERVATIONS WITH THE PROJECT WORK AND ' �
<br /> GRATE FRAME - - OVERFLOW BYPASS SHALL BE INSTALLED IN CURB INLETS. OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE INCLUDE ALL NECESSARY DEMOLITION, WHETHER SHOWN OR NOT, AND r c h i t e c t s �
<br /> APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS INCLUDE ALL SUCH COSTS IN THE BASE BID. �
<br /> BELOW INLET GRATE 3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO COMPLETED AND APPROVED AND VEGETATIONlLANDSCAPING IS
<br /> SEDIMENT �' DEVICE CLEARING AND GRADING ACTIVITY, OR UPON ESTABLISHED. 1928 43rd Ave E., Ste A
<br /> AND DEBRIS PLACEMENT OF A NEW CATCH BASIN. 2. CLEARING: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO
<br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN CONDUCT ALL CLEARING NECESSARY TO BE ABLE TO COMPLETE ALL THE S e a t t I e , W A 9 8 1 1 2
<br /> --FILTEREDWATER ( 206 ) 453 - 4053
<br /> I 4. SED�MENT SHALL BE REMOVED FROM THE UNIT SHALL BE CLEARIY FLAGGED IN THE FIELD PRIOR TO WORK OF THIS PROJECT. s h o e s m i t h c o x . c o m
<br /> �, WHEN IT BECOMES ONE THIRD FULL OR IN CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO
<br /> ' ----------- , ACCORDANCE WITH THE MANUFACTURES
<br /> � -- � � DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE 3. CONTRACTOR SHALL LEGALLY DISPOSE OF THE OWNER'S PROPERTY, •
<br /> ��:
<br /> � INSTRUCTIONS. PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE DEMOUSHED AND REMOVED MATERIALS, UNLESS INDICATED OTHERWISE.
<br /> I APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
<br /> 5. SEDIMENT REMOVAI SHALL BE ACCOMPLISHED BY 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR FOR ENSURING THAT ALL
<br /> , REMOVING THE INLET INSERTS, EMPTYING,AND 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE
<br /> _____ RE-INSTALLING IT INTO THE CATCH BASIN. DO NOT UTILITIES HAVE BEEN DISCONNECTED PRIOR TO COMMENCING
<br /> ``___ ' CONSTRUCTED W CONJUNCTION WITH ALL CLEARING AND
<br /> ---
<br /> , WASH SEDIMENT INTO STORM DRAINS WHILE GRADING ACTIVITIES,AND IN SUCH A MANNER AS TO ENSURE THAT DEMOLITION. CONTRACTOR SHALL COORDINATE UTILITY DEMOLITIO
<br /> CLEANING. SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE W�TH NEW CONSTRUCTION.
<br /> '� 6. SIZE THE BELOW WLET GRATE DEVICE (BIGD) FOR THE DRA►NAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER 5. COORDINATE POWER DEMOLITION WITH UTIUTY PURVEYOR AND
<br /> '' STORM WATER STRUCTURE IT WILL SERVICE. QUALITY STANDARDS. ELECTRICAL PLANS. CONTRACTOR TO ENSURE THAT DEMOLITION OF LINES
<br /> 'I 7. THE BIGD SHALI HAVE A BUILT-IN HIGH-FLOW RELIEF 5. THE ESC FACILITIES SHOWN ON TH15 PLAN ARE THE MINIMUM WILL NOT COMPROMISE POWER TO OTHER AREAS.
<br /> �� SYSTEM {OVERFLOW BYPA5S). REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
<br /> SECTION VIEW CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE 6. GAS DISCONNECTION BY UTILITY PURVEYOR CONTRACTOR TO
<br /> 8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO COORDINATE WORK WITH P.S.E. CONTRACTOR TO DEMOLISH ABANDONED
<br /> THE BIGD WITHOUT SPILLING THE COLLECTED ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT SERVICE. CONTRACTOR TO ENSURE THAT DEMOLITION OF GAS LINES WILL
<br /> MATERIA�. LEAVE THE SITE. NOT IMPACT GAS SERVICE TO OTHER AREAS. NO DISRUPTION IN SERVICE
<br /> AL.LOWED.
<br /> 9. PERFORM MAINTENANCE IN ACCORDANCE WITH 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND
<br /> RETRIEVAL SYSTEM STANDARD SPECiFICATION 8-01.3(15). MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR �. ANY ABANDONED SIDE SEWER(S) SHALL BE PLUGGED OR CAPPED AS
<br /> TYPICAL CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. SHOWN.
<br /> DRAINAGE GRATE- � 7 MA NTA NEDCA MINIMUM OF ONCE A'MO TH OR WITHSN THE 48 AND $ UTILITIES TO BE ABANDONED SHALL BE CAPPED. CONTRACTOR SHALL
<br /> o Qi HOURS FOLLOWING A MAJOR STORM EVENT. AS-BUILT LOCATION.
<br /> o � skilled nursing
<br /> � 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE 9. REFER TO LANDSCAPE ARCHITECTURE DRAWINGS FOR TREE PROTECTION . .
<br /> o '� ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN.ALL REQUIREMENTS. a d d I � I O I7 S
<br /> 3
<br /> Z CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
<br /> Z PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH 10.ALL MONUMENTS DISTURBED AS A RESULT OF CONSTRUCTION ACTIVITIES
<br /> � SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. SHALL BE REPLACED PER WAC 332-120 AT NO ADDITIONAL COST TO THE
<br /> ° OWNER. CONTRACTOR SHALL APPLY FOR PERMIT FROM THE DEPARTMENT 2235 Lake Heights Drive
<br /> w
<br /> o WSDOT STD PLAN I-40.20-00 ACCEPTABI.E SUBSTITUTE IF
<br /> o BELOW INIET GRATE MAINTENANCE MEETS NOTES 1-5 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTAL�ED AT OF NATURAL RESOURCES AS NECESSARY.
<br /> � DEVICE OVERFLOW BYPASS THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE E v e rett� WA 9�2 O�
<br /> N TYPICAL - DURATION OF THE PROJECT.ADDITIONAL MEASURES MAY BE 11.CONTRACTOR SHALL ENSURE THAT ADEQUATE FIRE PROTECTION ACCESS
<br /> � CITY OF EVERETT REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN IS PROVIDED TO SITE AND EXISTING STRUCTURES TO REMAIN.
<br /> Z ' FOR THE DURATION OF THE PROJECT. CONTRACTOR SHALL ALSO PROVIDE ADEQUATE FIRE PROTECTION FOR
<br /> �Q �_
<br /> Z N � ��E�T PUBLIC WORKS DEPARTMENT
<br /> �o i THE NEW SUILDING.
<br /> o� i a n'fvsass He`nTHEag�aiFFw `�Pnu wi�He�M °"w°ESH `Jfe"`a°"°"e 10.THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING
<br /> o� r,��E 12/30/2016 TO REMOVE DEBRI S A N D S E D 1 M E N T T R A C K E D O F F T H E S I T E. 12.COORDINATE DEMOLITION OF ASPHALT WITH TESC PLAN. MAINTAIN
<br /> w� ISOMETRIC VIEW STORM DRAIN INLET 210 PAVEMENT AS A WORKING SURFACE AS LONG AS FEASIBLE. COORDINATE
<br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT
<br /> v Q o � PROTECTION FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED STUDENT ACCESS ALONG SOUTH SIDE OF PROJECT LIMITS WITH COLLEGE
<br /> ��o _ BMPS FAIL. - PROVIDE A SAFE PEDESTRIAN ACCESS MEETING ADA REQUIREMENTS.
<br /> -- - _ -� - -------- --- --_ KEYMAP
<br /> 12.BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED 13.CONTRACTOR SHALL MINIMIZE DUST GENERATION ONSITE BY SPRINKLING
<br /> STO RM D RAI N I N L ET P ROT E CTI O N AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM THE SITE WITH WATER UNTIL SURFACE IS WET.
<br /> 1 NOT TO SCALE OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS
<br /> FROM MAY 1 THROUGH SEPTEMBER 30. 14.SAWCUT CONCRETE SIDEWALK AT THE NEAREST JOINT. B e t h a n y
<br /> TESC NOTES of tne Nor-tnwest
<br /> 1. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION 7. WATER SITE AS NECESSARY TO CONTROL DUST. No. on� REv�sioN
<br /> � - � PRESERVATION AS PRESCRIBED ON THESE PLANS DOH CRS
<br /> `_ 1 01-28-2019 RESPONSE#1
<br /> NOTES SHALL BE CLEARLY FLAGGED IN THE FIELD AND 8. TOPSOIL SHALL NOT BE PLACED WHILE SUBGRADE IS IN --
<br /> OBSERVED DURING CONSTRUCTION. A FROZEN OR MUDDY CONDITION, WHEN THE CITY OF EVERETT
<br /> ATTACH IN A MANNER THAT POST SEE WSDOT STANDARD 1. INSTALL THE fND5 OF THE SILT FENCE TO POINT , SUBGRADE IS EXCESSIVELY WET, OR WHEN 3___ ___03.29-2019 _ RESPONSE#� (BLDG) .
<br /> ASSURES FABRIC IS FIRMLY SPECIFICATIONS 8-01.3(9)A
<br /> HELD BY THE BACKUP SLIGHTIY UPSIOPE TO PREVENT SEDIMEtVT FROM 2. ALL TEMPORARY SEDIMENTATION AND EROSION CONDITIONS EXIST THAT MAY OTHERWISE BE CITY OF EVERETf
<br /> SUPPORT IN A WAY THAT FLOWING AROUND THE ENDS OF THE FENCE. CONTROL MEASURES, AND PROTECTIVE MEASURES DETRIMENTAL TO PROPER GRADING OR PROPOSED 4 _04.29-201 Q__RESPONSE#1 (PW)
<br /> REDUCES THE POTENTIAL FOR CRITICAL AREAS AND SIGNIFICANT TREES SHALL SODDING OR SEEDING.
<br /> FOR FABRIC TEARING 2. PERFORM MAINTENANCE IN ACCORDANCE WITH CITY OF EVERETT
<br /> -FASTEN GEOTEXTILE TO WSDOT STANDARD SPECIFICATIONS 8-Q1.3(9)A BE INSTALLED PRIOR TO INITIATING ANY 5_ _Orj.31-2019 RESPONSE#2(PW)
<br /> POST EVERY 6" IN O.C. AND 8-01.3(15).
<br /> CONSTRUCTION ACTIVITIES. 9. ON-SITE EROSION CONTROL MEASURES SHALL BE THE
<br /> RESPONSIBILITY OF THE CONTRACTOR. ANY PROBLEMS
<br /> BACKUP SUPPORT 3. SPLICES SHA�I NEVER BE PLACED IN LOW SPOTS 3. ALL REQUIRED SEDIMENTATION AND EROSION OCCURRING BEFORE FINAL STABILIZATION OF THE SITE - --
<br /> _-� OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN CONTROL FACILITIES MUST BE CONSTRUCTED AND IN SHALL BE CORRECTED BY THE CONTRACTOR.
<br /> �' � ���� ���:
<br /> ,,, o z LOW OR SUMP AREAS,THE FENCE MAY NEED TO OPERATION PRIOR TO ANY LAND CLEARING AND/OR - -�----
<br /> BACKFILLED & � ^' � -SELF-LOCKING TIE-NYLONE BE REINSTALLED UNLESS OTHERWISE APPROVED. OTHER CONSTRUCTION ACTIVITIES TO ENSURE THAT 10. IF EROSION OR SEDIMENTATION OCCURS ON ADJACENT
<br /> COMPACTED � 6/6(MIN GRADE) SEDIMENT LADEN WATER DOES NOT ENTER ANY SITES, ALL CONSTRUCTION WORK WITHIN THE PROJECT
<br /> NATIVE SOIL GEOTEXTI�E � 120#MIN TENSILE STRENGTH, 4. INSTALL SILT FENCING PARALLEL TO MAPPED EXISTING DRAINAGE SYSTEM. THE CONTRACTOR SHALL LIMITS THAT WILL AGGRAVATE THE SITUATION MUST
<br /> � i l UV STABILIZED CONTOUR LINES. SCHEDULE AN INSPECTION OF THE EROSION CONTROL CEASE AND THE CONTRACTOR SHALL IMMEDIATELY _ _
<br /> FLOw f i / 5. DURING EXCAVATION, MINIMIZE DISTURBING FACILITIES PRIOR TO ANY LAND CLEARING AND/OR COMMENCE RESTORATION OR MITIGATION MEASURES. PRo�ECT MnN,ac�R
<br /> _��'�� � THE GROUND AROUND TRENCH AS MUCH AS IS OTHER CONSTRUCTION. ALL EROSION AND SEDIMENT RESTORATION ACTIVITY SHALL CONTINUE UNTIL SUCH LD� _ ___ _
<br /> �i FEASIBLE,AND SMOOTH 5URFACE FOLIOWING CONTROL FACILITIES SHALL BE MAINTAINED IN A TIME AS THE PROBLEM IS RECTIFIED. PRo�ECT er,c�NEER
<br /> i ,, = EXCAVATION TO AVOID CONCENTRATING F�OWS. SATISFACTORY CONDITION UNTIL SUCH TIME THAT T�M
<br /> �.� ��� COMPACTION MUST BE ADEQUATE TO PREUENT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND 11. ALL EROSION AND SEDIMENTATION CONTROL
<br /> BURY GEOTEXTILE � � UNDERCUTTING FLOWS. THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. MEASURES SHOWN ON THESE DRAWINGS SHALL BE PROJECT TEAM MEMBERS
<br /> , IN TRENCH � � ° �a � THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, INSTALLED PRIOR TO, OR AS THE FIRST STAGE OF SITE R�S_ _
<br /> � .!`�, ,/�BACKUP SUPPORT AND ADDITIONS TO THE EROSION AND SEDIMENTATION PREPARATION. cHECK
<br /> SEE STANDARD SPECIFICATION ; � /� (nP�CAL)
<br /> ' � \, 't'p STEEL PO5T CONTROL MEASURES SHALL BE THE RESPONSIBILITY DCN
<br /> GEOTEXTILE FOR SILT FENCE F,` � �� 12. SHOULD THE TEMPORARY EROSION AND
<br /> z t __ _ _ ____
<br /> � � \ � � � (nPICAL� OF THE CONTRACTOR.
<br /> � SECTION 9 33.2(1),TABLE 6 ' SEDIMENTATION CONTROL MEASURES SHOWN ON
<br /> i
<br /> � � ' I �i � � 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEM THESE DRAWINGS NOT PROVE ADEQUATE TO CONTROL
<br /> SEAL
<br /> -f'�5-�. �,� , ;j/ I � MEASURES DEPICTED ON THESE PLANS ARE INTENDED EROSION AND SEDIMENTATION, THE CONTRACTOR
<br /> - �T�,o��'.��o ;�'% �1 i � � � TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SHALL INSTALL ADDITIONAL FACILITIES AS NECESSARY
<br /> 9�i� \� ;., !�! � �O p,��P � / SITE CONDITIONS. AS CONSTRUCTION PROGRESSES TO PROTECT ADJACENT SITES, SENSITIVE AREAS, �,�ST Op�
<br /> T Y P I C A L I N S T A L L A T I O N D E T A I L \. � -"' /'� �Q�o,��L'�� F A B R I C �� A N D U N E X P E C T E D O R S E A S O N A L C O N D I T I O N S D I C T A T E, N A T U R A L W A T E R C O U R S E S, A N D/O R S T O R M D R A I N A G E o F w A s k �'
<br /> �
<br /> � � (GEOTEXTILE) ADDITIONAL MEASURES MAY BE NECESSARY TO SYSTEMS. ��`�� rN�To��
<br /> (T Y P I C A L) , `� �, E N S U R E C O M P L E T E S I L T A T I O N C O N T R O L O N T H E S I T E.
<br /> ; � -� � �
<br /> � D U R I N G T H E C O U R S E OF CONSTRUCTION, IT SHALL BE 13. ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON ` �
<br /> INSTALL BACKUP SUPPORT FOR �.^,,y' i �I F THE OBLIGATION AND RESPONSIBILITY OF THE SITE TO PREVENT DEBRIS, DUST, AND MUD FROM
<br /> THE GEOTEXTILE SEE STANDARD �; � _�` , �� �
<br /> 1
<br /> SPECIFICATION SECTION 8.01.3(9)A { � ,(11� CONTRACTOR TO ADDRESS ANY NEW CONDITIONS ACCUMULATING ON ADJACENT ROADWAYS. j�
<br /> 3 �'��" � ' I II THAT MAY BE CREATED BY CONSTRUCTION RELATED ��°�c>S'�Ecrs�����'��
<br /> t�` /
<br /> � � ` i-��-�!}-���i-;'" � � / v �` ( �!� ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, 14. THE CONTRACTOR SHALL BE REQUIRED TO CALL �`SjONAL ��
<br /> � � �! XI� ��,i�"'� ��'I� QPL��P OVER AND ABOVE THE MINIMUM REQUIREMENTS, AS 1-800-424-5555 OR "811"A MINIMUM OF TWO WORKING
<br /> -�.5 pEl SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER MAY BE NEEDED TO PROTECT ADJACENT SITES, DAYS PRIOR TO COMMENCING ANY EXCAVATION
<br /> 3 ,:} � , �i II �P,��p TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE 5/31/2019
<br /> Z � 6� p'��G FENCE AT THE OVERLAP. SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR ACTIVITIES TO DETERMINE FIELD LOCATIONS OF ALL o
<br /> W � ` '� � Q� STORM DRAINAGE SYSTEMS. UNDERGROUND UTILITIES. T,nE
<br /> � `�rr
<br /> � � ' `'� � `�l� ` �a ' % � SPLICE DETAIL
<br /> � t .,. ,
<br /> � �' ��� � 4 � � � �"` y �� � ' 5. ANY DISTURBED AREA WHICH HAS BEEN STRIPPED OF 15. RUNOFF SHA�L NOT BE ALLOWED TO DRAIN INTO THE ___DEMOLITION_AN D
<br /> - WSDOT STD PLAN I-3Q.10-02 ACCEPTABLE SUBSTITUTE
<br /> o � � ,�� �
<br /> � ~! ;/��--�� � ��� �� TYPICAL SILT FENCE EXCEPT STEEL POST REQUIRED VEGETATI O N A N D W H E R E N O F U R T H E R W O R K I S S T O R M D R A I N A G E S Y S T E M D U R I N G C O N S T R U C T I O N. T E S C N O T E S A N D
<br /> � - ` � �' � WITH BACKUP SUPPORT ANTICIPATED FOR A PERIOD OF 10 DAYS OR MORE PROVIDE TEMPORARY PROTECTION FOR YARD DRAINS _
<br /> � � � ' ����P W T= DURING THE DRY SEASON (MAY 1-SEPT 30) OR 5 DAYS AS REQUIRED TO PREVENT RUNOFF FROM ENTERING Civi1 Engineers „� � ---- -- -- -- -
<br /> o � �� �� L�C��P ISOMETRIC � CITY OF EVERETT OR MORE IN THE WET SEASON (OCT 1-APIL 30), SHALL THE STORM DRAINAGE SYSTEM. Structural Engineers � .r. DETAILS - -
<br /> Z a �r� �� ��" Q�O�� , ���TT PUBLIC WORKS DEPARTMENT BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS Landscape Architects �' e � ---- -------- -
<br /> �� � � � Communit Planners „�� x"�
<br /> � -__- Se ,a ,a age ppMa age oaw ey e Re pa PLANTING, OR OTHER APPROVED EROSION CONTROL 16. THE TEMPORARY EROSION AND SEDIMENT CONTROL Y
<br /> o� 20 , RYaNSAss iHEnTHER�R�FF�r, PAULWIIHELM ESH 03%17�2017 TREATMENT APPLICABLE TO THE TIME OF YEAR IN MEASURES SHALL CONFORM TO THE CONSTRUCTION Natural Resource Ecologists
<br /> o PROJECT N0.
<br /> °� � 5T""°"R°°R"`"'"G"° QUESTION. GRASS SEEDING ALONE WILL BE STORMWATER POL�UTION PREVENTION PLAN AND THE Land Surveyors �°"�`� ' � �
<br /> Q� TEM PORARY SILT FENCE 1 214 ACCEPTABLE ONLY DURING THE MONTHS OF MAY CONSTRUCTION STORMWATER NPDES AND STATE Neighbors 1 H.O3-01
<br /> =;o THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY WASTE DISCHARGE GENERAL PERMIT. UPDATES °A�
<br /> ��d
<br /> _ _ _ T - - - ' PROCEED OUTSIDE THE SPECIFIED TIME PERIOD MEASURES AS NECESSARY TO CONFORM TO SITE � 12/21/2018 '
<br /> WHENEVER IT IS IN THE INTEREST OF THE CONDITIONS.
<br /> ------ -------_----- -_--
<br /> - PROJECT NETWORK PATH
<br /> , -
<br /> o T E M P C)RARY S I LT F E N C E CONTRACTOR BUT SHALL BE AUGMENTED WITH
<br /> 2 NOT TO SCALE MULCHING, NETTING, OR OTHER TREATMENT. 17. ALL TEMPORARY EROSION AND SEDIMENTATION -- - -- - - -
<br /> O CONTROL MEASURES SHALL BE COMPLETELY REMOVED T A C O M A : S E A T T L E - - -
<br /> � 6. NO TEMPORARY OR PERMANENT STOCKPILING OF PRIOR TO PROJECT COMPLETION. S P O K A N E T R I - C I T I E S SHEET NUMBER
<br /> „� Q� a MATERIALS OR EQUIPMENT SHALL OCCUR WITHIN
<br /> �v � CRITICAL AREAS OR ASSOCIATED BUFFERS, OR THE 18. REFER TO THE CONSTRUCTION STORMWATER 2215 North 30th Street, Suite 300 Tacoma, WA 98403
<br /> �
<br /> CRITICAL ROOT ZONE FOR VEGETATION PROPOSED POLLUTION PREVENTION PLAN AND NPDES PERMIT FOR 253.3$3.2422 TEL 253.383.2572 FAX www.a .com WEB
<br /> Know what�S beIOW. FOR RETENTION. ADDITIONAL REQUIREMENTS. �
<br /> Call before you dig.
<br /> �����Y �,� �v�a�4� NOT FOR CONSTRUCTION PERMIT SET
<br /> ��a�r-r, r p� -, ;�r, COPYRIGHT O 2018 shoesmith cox architects
<br /> DATE: May 30, 2019 FILENAME: Q:\2018\2180406\10_CIV�CAD\2180406-SH-DEMO.dwg