..�__ . , � . . . . . .. <br /> -�- -- --'� - -� CITY OF EVERETT TESC NOTES DEMOLITION NOTES <br /> � NOTES � 1. APPROVA�OF THIS EROSION/SEDIMENTATION CONTROL(ESC) 1. DEMOLITION: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO m i t h . <br /> TCH BASIN INSERTS SHALL BE REMOVED AT THE PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD INCLUDE THE DEMOLITION OF ALL EXISTING BUILDINGS, PAVING, UTILITIES S <br /> hoes <br /> 5" MAX 1 END OF THE PROIECT. ; OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, AND OTHER EXISTING SITE IMPROVEMENTS INCLUDING THEIR <br /> DRAINAGE GRATE RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). UNDERGROUND COMPONENTS AS INDICATED BY THIS DRAWING AND AS <br /> -TRIM <br /> 2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN REQUIRED FOR NEW CONSTRUCTION. IT IS THE CONTRACTOR'S <br /> DRAINAGE DEVICES PER THE MANUFACTURES'S 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE RESPONSIBILITY TO FULLY REVIEW THE SITE CONDITIONS AND TO <br /> RECOMMENDATIONS. CATCH BASIN INLET INSERTS CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING CORRELATE THESE OBSERVATIONS WITH THE PROJECT WORK AND ' � <br /> GRATE FRAME - - OVERFLOW BYPASS SHALL BE INSTALLED IN CURB INLETS. OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE INCLUDE ALL NECESSARY DEMOLITION, WHETHER SHOWN OR NOT, AND r c h i t e c t s � <br /> APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS INCLUDE ALL SUCH COSTS IN THE BASE BID. � <br /> BELOW INLET GRATE 3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO COMPLETED AND APPROVED AND VEGETATIONlLANDSCAPING IS <br /> SEDIMENT �' DEVICE CLEARING AND GRADING ACTIVITY, OR UPON ESTABLISHED. 1928 43rd Ave E., Ste A <br /> AND DEBRIS PLACEMENT OF A NEW CATCH BASIN. 2. CLEARING: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN CONDUCT ALL CLEARING NECESSARY TO BE ABLE TO COMPLETE ALL THE S e a t t I e , W A 9 8 1 1 2 <br /> --FILTEREDWATER ( 206 ) 453 - 4053 <br /> I 4. SED�MENT SHALL BE REMOVED FROM THE UNIT SHALL BE CLEARIY FLAGGED IN THE FIELD PRIOR TO WORK OF THIS PROJECT. s h o e s m i t h c o x . c o m <br /> �, WHEN IT BECOMES ONE THIRD FULL OR IN CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br /> ' ----------- , ACCORDANCE WITH THE MANUFACTURES <br /> � -- � � DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE 3. CONTRACTOR SHALL LEGALLY DISPOSE OF THE OWNER'S PROPERTY, • <br /> ��: <br /> � INSTRUCTIONS. PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE DEMOUSHED AND REMOVED MATERIALS, UNLESS INDICATED OTHERWISE. <br /> I APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br /> 5. SEDIMENT REMOVAI SHALL BE ACCOMPLISHED BY 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR FOR ENSURING THAT ALL <br /> , REMOVING THE INLET INSERTS, EMPTYING,AND 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE <br /> _____ RE-INSTALLING IT INTO THE CATCH BASIN. DO NOT UTILITIES HAVE BEEN DISCONNECTED PRIOR TO COMMENCING <br /> ``___ ' CONSTRUCTED W CONJUNCTION WITH ALL CLEARING AND <br /> --- <br /> , WASH SEDIMENT INTO STORM DRAINS WHILE GRADING ACTIVITIES,AND IN SUCH A MANNER AS TO ENSURE THAT DEMOLITION. CONTRACTOR SHALL COORDINATE UTILITY DEMOLITIO <br /> CLEANING. SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE W�TH NEW CONSTRUCTION. <br /> '� 6. SIZE THE BELOW WLET GRATE DEVICE (BIGD) FOR THE DRA►NAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER 5. COORDINATE POWER DEMOLITION WITH UTIUTY PURVEYOR AND <br /> '' STORM WATER STRUCTURE IT WILL SERVICE. QUALITY STANDARDS. ELECTRICAL PLANS. CONTRACTOR TO ENSURE THAT DEMOLITION OF LINES <br /> 'I 7. THE BIGD SHALI HAVE A BUILT-IN HIGH-FLOW RELIEF 5. THE ESC FACILITIES SHOWN ON TH15 PLAN ARE THE MINIMUM WILL NOT COMPROMISE POWER TO OTHER AREAS. <br /> �� SYSTEM {OVERFLOW BYPA5S). REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br /> SECTION VIEW CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE 6. GAS DISCONNECTION BY UTILITY PURVEYOR CONTRACTOR TO <br /> 8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO COORDINATE WORK WITH P.S.E. CONTRACTOR TO DEMOLISH ABANDONED <br /> THE BIGD WITHOUT SPILLING THE COLLECTED ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT SERVICE. CONTRACTOR TO ENSURE THAT DEMOLITION OF GAS LINES WILL <br /> MATERIA�. LEAVE THE SITE. NOT IMPACT GAS SERVICE TO OTHER AREAS. NO DISRUPTION IN SERVICE <br /> AL.LOWED. <br /> 9. PERFORM MAINTENANCE IN ACCORDANCE WITH 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND <br /> RETRIEVAL SYSTEM STANDARD SPECiFICATION 8-01.3(15). MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR �. ANY ABANDONED SIDE SEWER(S) SHALL BE PLUGGED OR CAPPED AS <br /> TYPICAL CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. SHOWN. <br /> DRAINAGE GRATE- � 7 MA NTA NEDCA MINIMUM OF ONCE A'MO TH OR WITHSN THE 48 AND $ UTILITIES TO BE ABANDONED SHALL BE CAPPED. CONTRACTOR SHALL <br /> o Qi HOURS FOLLOWING A MAJOR STORM EVENT. AS-BUILT LOCATION. <br /> o � skilled nursing <br /> � 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE 9. REFER TO LANDSCAPE ARCHITECTURE DRAWINGS FOR TREE PROTECTION . . <br /> o '� ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN.ALL REQUIREMENTS. a d d I � I O I7 S <br /> 3 <br /> Z CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED <br /> Z PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH 10.ALL MONUMENTS DISTURBED AS A RESULT OF CONSTRUCTION ACTIVITIES <br /> � SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. SHALL BE REPLACED PER WAC 332-120 AT NO ADDITIONAL COST TO THE <br /> ° OWNER. CONTRACTOR SHALL APPLY FOR PERMIT FROM THE DEPARTMENT 2235 Lake Heights Drive <br /> w <br /> o WSDOT STD PLAN I-40.20-00 ACCEPTABI.E SUBSTITUTE IF <br /> o BELOW INIET GRATE MAINTENANCE MEETS NOTES 1-5 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTAL�ED AT OF NATURAL RESOURCES AS NECESSARY. <br /> � DEVICE OVERFLOW BYPASS THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE E v e rett� WA 9�2 O� <br /> N TYPICAL - DURATION OF THE PROJECT.ADDITIONAL MEASURES MAY BE 11.CONTRACTOR SHALL ENSURE THAT ADEQUATE FIRE PROTECTION ACCESS <br /> � CITY OF EVERETT REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN IS PROVIDED TO SITE AND EXISTING STRUCTURES TO REMAIN. <br /> Z ' FOR THE DURATION OF THE PROJECT. CONTRACTOR SHALL ALSO PROVIDE ADEQUATE FIRE PROTECTION FOR <br /> �Q �_ <br /> Z N � ��E�T PUBLIC WORKS DEPARTMENT <br /> �o i THE NEW SUILDING. <br /> o� i a n'fvsass He`nTHEag�aiFFw `�Pnu wi�He�M °"w°ESH `Jfe"`a°"°"e 10.THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING <br /> o� r,��E 12/30/2016 TO REMOVE DEBRI S A N D S E D 1 M E N T T R A C K E D O F F T H E S I T E. 12.COORDINATE DEMOLITION OF ASPHALT WITH TESC PLAN. MAINTAIN <br /> w� ISOMETRIC VIEW STORM DRAIN INLET 210 PAVEMENT AS A WORKING SURFACE AS LONG AS FEASIBLE. COORDINATE <br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT <br /> v Q o � PROTECTION FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED STUDENT ACCESS ALONG SOUTH SIDE OF PROJECT LIMITS WITH COLLEGE <br /> ��o _ BMPS FAIL. - PROVIDE A SAFE PEDESTRIAN ACCESS MEETING ADA REQUIREMENTS. <br /> -- - _ -� - -------- --- --_ KEYMAP <br /> 12.BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED 13.CONTRACTOR SHALL MINIMIZE DUST GENERATION ONSITE BY SPRINKLING <br /> STO RM D RAI N I N L ET P ROT E CTI O N AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM THE SITE WITH WATER UNTIL SURFACE IS WET. <br /> 1 NOT TO SCALE OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS <br /> FROM MAY 1 THROUGH SEPTEMBER 30. 14.SAWCUT CONCRETE SIDEWALK AT THE NEAREST JOINT. B e t h a n y <br /> TESC NOTES of tne Nor-tnwest <br /> 1. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION 7. WATER SITE AS NECESSARY TO CONTROL DUST. No. on� REv�sioN <br /> � - � PRESERVATION AS PRESCRIBED ON THESE PLANS DOH CRS <br /> `_ 1 01-28-2019 RESPONSE#1 <br /> NOTES SHALL BE CLEARLY FLAGGED IN THE FIELD AND 8. TOPSOIL SHALL NOT BE PLACED WHILE SUBGRADE IS IN -- <br /> OBSERVED DURING CONSTRUCTION. A FROZEN OR MUDDY CONDITION, WHEN THE CITY OF EVERETT <br /> ATTACH IN A MANNER THAT POST SEE WSDOT STANDARD 1. INSTALL THE fND5 OF THE SILT FENCE TO POINT , SUBGRADE IS EXCESSIVELY WET, OR WHEN 3___ ___03.29-2019 _ RESPONSE#� (BLDG) . <br /> ASSURES FABRIC IS FIRMLY SPECIFICATIONS 8-01.3(9)A <br /> HELD BY THE BACKUP SLIGHTIY UPSIOPE TO PREVENT SEDIMEtVT FROM 2. ALL TEMPORARY SEDIMENTATION AND EROSION CONDITIONS EXIST THAT MAY OTHERWISE BE CITY OF EVERETf <br /> SUPPORT IN A WAY THAT FLOWING AROUND THE ENDS OF THE FENCE. CONTROL MEASURES, AND PROTECTIVE MEASURES DETRIMENTAL TO PROPER GRADING OR PROPOSED 4 _04.29-201 Q__RESPONSE#1 (PW) <br /> REDUCES THE POTENTIAL FOR CRITICAL AREAS AND SIGNIFICANT TREES SHALL SODDING OR SEEDING. <br /> FOR FABRIC TEARING 2. PERFORM MAINTENANCE IN ACCORDANCE WITH CITY OF EVERETT <br /> -FASTEN GEOTEXTILE TO WSDOT STANDARD SPECIFICATIONS 8-Q1.3(9)A BE INSTALLED PRIOR TO INITIATING ANY 5_ _Orj.31-2019 RESPONSE#2(PW) <br /> POST EVERY 6" IN O.C. AND 8-01.3(15). <br /> CONSTRUCTION ACTIVITIES. 9. ON-SITE EROSION CONTROL MEASURES SHALL BE THE <br /> RESPONSIBILITY OF THE CONTRACTOR. ANY PROBLEMS <br /> BACKUP SUPPORT 3. SPLICES SHA�I NEVER BE PLACED IN LOW SPOTS 3. ALL REQUIRED SEDIMENTATION AND EROSION OCCURRING BEFORE FINAL STABILIZATION OF THE SITE - -- <br /> _-� OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN CONTROL FACILITIES MUST BE CONSTRUCTED AND IN SHALL BE CORRECTED BY THE CONTRACTOR. <br /> �' � ���� ���: <br /> ,,, o z LOW OR SUMP AREAS,THE FENCE MAY NEED TO OPERATION PRIOR TO ANY LAND CLEARING AND/OR - -�---- <br /> BACKFILLED & � ^' � -SELF-LOCKING TIE-NYLONE BE REINSTALLED UNLESS OTHERWISE APPROVED. OTHER CONSTRUCTION ACTIVITIES TO ENSURE THAT 10. IF EROSION OR SEDIMENTATION OCCURS ON ADJACENT <br /> COMPACTED � 6/6(MIN GRADE) SEDIMENT LADEN WATER DOES NOT ENTER ANY SITES, ALL CONSTRUCTION WORK WITHIN THE PROJECT <br /> NATIVE SOIL GEOTEXTI�E � 120#MIN TENSILE STRENGTH, 4. INSTALL SILT FENCING PARALLEL TO MAPPED EXISTING DRAINAGE SYSTEM. THE CONTRACTOR SHALL LIMITS THAT WILL AGGRAVATE THE SITUATION MUST <br /> � i l UV STABILIZED CONTOUR LINES. SCHEDULE AN INSPECTION OF THE EROSION CONTROL CEASE AND THE CONTRACTOR SHALL IMMEDIATELY _ _ <br /> FLOw f i / 5. DURING EXCAVATION, MINIMIZE DISTURBING FACILITIES PRIOR TO ANY LAND CLEARING AND/OR COMMENCE RESTORATION OR MITIGATION MEASURES. PRo�ECT MnN,ac�R <br /> _��'�� � THE GROUND AROUND TRENCH AS MUCH AS IS OTHER CONSTRUCTION. ALL EROSION AND SEDIMENT RESTORATION ACTIVITY SHALL CONTINUE UNTIL SUCH LD� _ ___ _ <br /> �i FEASIBLE,AND SMOOTH 5URFACE FOLIOWING CONTROL FACILITIES SHALL BE MAINTAINED IN A TIME AS THE PROBLEM IS RECTIFIED. PRo�ECT er,c�NEER <br /> i ,, = EXCAVATION TO AVOID CONCENTRATING F�OWS. SATISFACTORY CONDITION UNTIL SUCH TIME THAT T�M <br /> �.� ��� COMPACTION MUST BE ADEQUATE TO PREUENT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND 11. ALL EROSION AND SEDIMENTATION CONTROL <br /> BURY GEOTEXTILE � � UNDERCUTTING FLOWS. THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. MEASURES SHOWN ON THESE DRAWINGS SHALL BE PROJECT TEAM MEMBERS <br /> , IN TRENCH � � ° �a � THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, INSTALLED PRIOR TO, OR AS THE FIRST STAGE OF SITE R�S_ _ <br /> � .!`�, ,/�BACKUP SUPPORT AND ADDITIONS TO THE EROSION AND SEDIMENTATION PREPARATION. cHECK <br /> SEE STANDARD SPECIFICATION ; � /� (nP�CAL) <br /> ' � \, 't'p STEEL PO5T CONTROL MEASURES SHALL BE THE RESPONSIBILITY DCN <br /> GEOTEXTILE FOR SILT FENCE F,` � �� 12. SHOULD THE TEMPORARY EROSION AND <br /> z t __ _ _ ____ <br /> � � \ � � � (nPICAL� OF THE CONTRACTOR. <br /> � SECTION 9 33.2(1),TABLE 6 ' SEDIMENTATION CONTROL MEASURES SHOWN ON <br /> i <br /> � � ' I �i � � 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEM THESE DRAWINGS NOT PROVE ADEQUATE TO CONTROL <br /> SEAL <br /> -f'�5-�. �,� , ;j/ I � MEASURES DEPICTED ON THESE PLANS ARE INTENDED EROSION AND SEDIMENTATION, THE CONTRACTOR <br /> - �T�,o��'.��o ;�'% �1 i � � � TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SHALL INSTALL ADDITIONAL FACILITIES AS NECESSARY <br /> 9�i� \� ;., !�! � �O p,��P � / SITE CONDITIONS. AS CONSTRUCTION PROGRESSES TO PROTECT ADJACENT SITES, SENSITIVE AREAS, �,�ST Op� <br /> T Y P I C A L I N S T A L L A T I O N D E T A I L \. � -"' /'� �Q�o,��L'�� F A B R I C �� A N D U N E X P E C T E D O R S E A S O N A L C O N D I T I O N S D I C T A T E, N A T U R A L W A T E R C O U R S E S, A N D/O R S T O R M D R A I N A G E o F w A s k �' <br /> � <br /> � � (GEOTEXTILE) ADDITIONAL MEASURES MAY BE NECESSARY TO SYSTEMS. ��`�� rN�To�� <br /> (T Y P I C A L) , `� �, E N S U R E C O M P L E T E S I L T A T I O N C O N T R O L O N T H E S I T E. <br /> ; � -� � � <br /> � D U R I N G T H E C O U R S E OF CONSTRUCTION, IT SHALL BE 13. ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON ` � <br /> INSTALL BACKUP SUPPORT FOR �.^,,y' i �I F THE OBLIGATION AND RESPONSIBILITY OF THE SITE TO PREVENT DEBRIS, DUST, AND MUD FROM <br /> THE GEOTEXTILE SEE STANDARD �; � _�` , �� � <br /> 1 <br /> SPECIFICATION SECTION 8.01.3(9)A { � ,(11� CONTRACTOR TO ADDRESS ANY NEW CONDITIONS ACCUMULATING ON ADJACENT ROADWAYS. j� <br /> 3 �'��" � ' I II THAT MAY BE CREATED BY CONSTRUCTION RELATED ��°�c>S'�Ecrs�����'�� <br /> t�` / <br /> � � ` i-��-�!}-���i-;'" � � / v �` ( �!� ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, 14. THE CONTRACTOR SHALL BE REQUIRED TO CALL �`SjONAL �� <br /> � � �! XI� ��,i�"'� ��'I� QPL��P OVER AND ABOVE THE MINIMUM REQUIREMENTS, AS 1-800-424-5555 OR "811"A MINIMUM OF TWO WORKING <br /> -�.5 pEl SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER MAY BE NEEDED TO PROTECT ADJACENT SITES, DAYS PRIOR TO COMMENCING ANY EXCAVATION <br /> 3 ,:} � , �i II �P,��p TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE 5/31/2019 <br /> Z � 6� p'��G FENCE AT THE OVERLAP. SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR ACTIVITIES TO DETERMINE FIELD LOCATIONS OF ALL o <br /> W � ` '� � Q� STORM DRAINAGE SYSTEMS. UNDERGROUND UTILITIES. T,nE <br /> � `�rr <br /> � � ' `'� � `�l� ` �a ' % � SPLICE DETAIL <br /> � t .,. , <br /> � �' ��� � 4 � � � �"` y �� � ' 5. ANY DISTURBED AREA WHICH HAS BEEN STRIPPED OF 15. RUNOFF SHA�L NOT BE ALLOWED TO DRAIN INTO THE ___DEMOLITION_AN D <br /> - WSDOT STD PLAN I-3Q.10-02 ACCEPTABLE SUBSTITUTE <br /> o � � ,�� � <br /> � ~! ;/��--�� � ��� �� TYPICAL SILT FENCE EXCEPT STEEL POST REQUIRED VEGETATI O N A N D W H E R E N O F U R T H E R W O R K I S S T O R M D R A I N A G E S Y S T E M D U R I N G C O N S T R U C T I O N. T E S C N O T E S A N D <br /> � - ` � �' � WITH BACKUP SUPPORT ANTICIPATED FOR A PERIOD OF 10 DAYS OR MORE PROVIDE TEMPORARY PROTECTION FOR YARD DRAINS _ <br /> � � � ' ����P W T= DURING THE DRY SEASON (MAY 1-SEPT 30) OR 5 DAYS AS REQUIRED TO PREVENT RUNOFF FROM ENTERING Civi1 Engineers „� � ---- -- -- -- - <br /> o � �� �� L�C��P ISOMETRIC � CITY OF EVERETT OR MORE IN THE WET SEASON (OCT 1-APIL 30), SHALL THE STORM DRAINAGE SYSTEM. Structural Engineers � .r. DETAILS - - <br /> Z a �r� �� ��" Q�O�� , ���TT PUBLIC WORKS DEPARTMENT BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS Landscape Architects �' e � ---- -------- - <br /> �� � � � Communit Planners „�� x"� <br /> � -__- Se ,a ,a age ppMa age oaw ey e Re pa PLANTING, OR OTHER APPROVED EROSION CONTROL 16. THE TEMPORARY EROSION AND SEDIMENT CONTROL Y <br /> o� 20 , RYaNSAss iHEnTHER�R�FF�r, PAULWIIHELM ESH 03%17�2017 TREATMENT APPLICABLE TO THE TIME OF YEAR IN MEASURES SHALL CONFORM TO THE CONSTRUCTION Natural Resource Ecologists <br /> o PROJECT N0. <br /> °� � 5T""°"R°°R"`"'"G"° QUESTION. GRASS SEEDING ALONE WILL BE STORMWATER POL�UTION PREVENTION PLAN AND THE Land Surveyors �°"�`� ' � � <br /> Q� TEM PORARY SILT FENCE 1 214 ACCEPTABLE ONLY DURING THE MONTHS OF MAY CONSTRUCTION STORMWATER NPDES AND STATE Neighbors 1 H.O3-01 <br /> =;o THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY WASTE DISCHARGE GENERAL PERMIT. UPDATES °A� <br /> ��d <br /> _ _ _ T - - - ' PROCEED OUTSIDE THE SPECIFIED TIME PERIOD MEASURES AS NECESSARY TO CONFORM TO SITE � 12/21/2018 ' <br /> WHENEVER IT IS IN THE INTEREST OF THE CONDITIONS. <br /> ------ -------_----- -_-- <br /> - PROJECT NETWORK PATH <br /> , - <br /> o T E M P C)RARY S I LT F E N C E CONTRACTOR BUT SHALL BE AUGMENTED WITH <br /> 2 NOT TO SCALE MULCHING, NETTING, OR OTHER TREATMENT. 17. ALL TEMPORARY EROSION AND SEDIMENTATION -- - -- - - - <br /> O CONTROL MEASURES SHALL BE COMPLETELY REMOVED T A C O M A : S E A T T L E - - - <br /> � 6. NO TEMPORARY OR PERMANENT STOCKPILING OF PRIOR TO PROJECT COMPLETION. S P O K A N E T R I - C I T I E S SHEET NUMBER <br /> „� Q� a MATERIALS OR EQUIPMENT SHALL OCCUR WITHIN <br /> �v � CRITICAL AREAS OR ASSOCIATED BUFFERS, OR THE 18. REFER TO THE CONSTRUCTION STORMWATER 2215 North 30th Street, Suite 300 Tacoma, WA 98403 <br /> � <br /> CRITICAL ROOT ZONE FOR VEGETATION PROPOSED POLLUTION PREVENTION PLAN AND NPDES PERMIT FOR 253.3$3.2422 TEL 253.383.2572 FAX www.a .com WEB <br /> Know what�S beIOW. FOR RETENTION. ADDITIONAL REQUIREMENTS. � <br /> Call before you dig. <br /> �����Y �,� �v�a�4� NOT FOR CONSTRUCTION PERMIT SET <br /> ��a�r-r, r p� -, ;�r, COPYRIGHT O 2018 shoesmith cox architects <br /> DATE: May 30, 2019 FILENAME: Q:\2018\2180406\10_CIV�CAD\2180406-SH-DEMO.dwg <br />