Laserfiche WebLink
� � � �� � ARCHITECT <br /> StI,IC�IIC`MENG � <br /> GENERAL NOTES NON-STRUCTURAL ELECTRICAL NOTES nseRewnnoNs �STRAZZARA , <br /> ,a�.�.E:,�YG I <br /> 1. PERFORMWORKINACCORDANCEWITHAPPLICABLE 8. COORDINATETELECOMMUNICATIONSWORKWITH 1. THEFOLLOWINGITEMSARETAKENDIRECTLYFROM A AMPERE MAX MAXIMUM «N,��,�. , . � � . <br /> NATIONAL AN� STATE CODES AS AMENDEO LOCALLY THAT OF OTHER TRADES. REFER TO ELECTRICAL, THE 2075 1NTERNATIONAL BUILDING CODE AND FROM A� AIR CONDITIONING; ALTERNATING CURRENT; MC MAIN CROSS CONNECT; METAL CLA� (CABLE) � <br /> . ANDENFORCEDBYTHEAHJ. MECHANIGAL, ARCHITECTURAL, STRUCTURAL, CIVIL, THEAMERICANSOCIETYOFCIVILENGINEERS �ASCE) ABWECOUNTER MCB MAINCIRCUITBREAKER 2ooiWestern P: 206.58].3�9] � <br /> AND LAN�SCAPE DR4WING5 AND SPECIFICATIONS. STANOARD 7. THE CONTRACTOR SHALL ftEFER TO THE AF AMP FUSE', AMP FRAME MCC MOTOR CONTROL CENTER Ave.Suite M200 F 20s.58].0588 <br /> 2. OBTAIN AND PAV FOR PERMITS REQUIRED FOR COORDINATION SHALL OCCUR PRIOR TO ABOVE FOR ADOITIONAL INFORMATION, EXCEPTIONS, AFF ABOVE FlNISHED FLOOft Seanle, WA 98121 ww`vsWtlioms.com . <br /> WSTALLATION OF WORK. ARRANGE AND SGHEOULE FABRICATION, PURCHASE. AND INSTALLATION OF AND FURTHER OESCRIPTIONS. THE CONTRACTOR MDF MAIN DISTRIBUTION FRAME - <br /> AG ABOVE GR4DE MDP MAIN �ISTRIBUTION PANEL CONSULTANT <br /> RE�UIREDINSPECTIONS. WORK. SHALLADHERETOREQUIREMENTSANDASSUCH, qHJ AUTHORITIESHAVINGJURISDICTION MFR MANUFACTURER <br /> SHALL BE INCLUDED WITHIN BID. ALSO REFER TO qHU AIR HANDLING UNIT �.. <br /> 3. COOROINATE ELECTRICAL WORK WITH THAT OF 9. NEW CABLING INSTALLATIONS SHALL BE CONCEALED SPEQFICATIONS. AIC AMPERE WTERRUPTING CURRENT MH MANHOLE H A R G 1 S <br /> � OTHERTRADES. REFERTOARCHITECTURAL, CIVIL, IN WALL, CEILINGS, AND BELOW RAISED FLOOR MIN MINIMUM <br /> � AN� LANDSCAPE DRAWINGS AND SPEQFICATIONS. SPACES UNLESS OTHERWISE NOTEO ON THE 2. 20151B4 1613.1, SCOPE: ARCHITECTURAL, AL AIUMINUM MLO MAM WGS ONLY . <br /> COOR�INATION SHALL OCCUR PRIOR TO DRAWINGS. CABLING IN ACCESSIBLE CEILING SPACES MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL ANSI AMERICAN NATIONAL STANDARDS INSTITUTE MM MULTIMODE "'^`"` � <br /> FABRICATION, PURCHASE, AND INSTALIATION OF SHALL BE INSTAL�ED AS OPEN CABLING NEAR COMPONENTS THAT ARE PERMANENTLV ATTACHED TO q5 AMP SWITCH MPOE MAIN POINT OF ENTRY `�""' . � <br /> WORK. STRUCTURES ANO WALLS OR AS SPEQFICALLY NOTED STRUCTURES AND THEIR SUPPORTS AND pT qN7p TRIP - <br /> ON OR4WING5. SEE SPECIFlCATIONS FOR SUPPORT ATTACHMENTS SHALL BE DESIGNED AND MPOP MAIN POINT OF PRESENCE <br /> � 4. COMPLETION OP WORK SHALL BE EXECl1TED IN RE�UIREMENTS. CONSTRUCTED TO RESIST THE EFFECTS OF ATM ASVNCHRONOUS TRANSFER MODE MTD MOUNTED `06"Yf16 """,'•." <br /> ACCOR�ANCE WITH THE PROJECT SCHE�ULE. EARTH�UAKE MOTIONS IN ACCORDANCE WITH ASCE 7, ATS AUTOMATIC TRANSFER SWITCH MTS MANUAL TRANSFER SWITCH . . <br /> SCHEDULE INSTALLATION WITH OTHER TRADES TO 'Ia. PROVI�E FlRESTOPPING SYSTEMS FOR CONOUIT AN� EXCLUDING CHAPTER 14 AND APPENDIX 11A. AV AUDIO VISUAL ; , <br /> ENSUREPROJEGTMIIESTONESAREMET. R4CEWAYSVSTEMSATPENETRATIONS, SLEEVESAN� AWG AMERICANWIREGAUGE (N) NEW CLIENTIOWNER <br /> SLOTS OF FIRE RATED CONSTRUCTION FOR 3. ASCE 7-02 1'IA L22 CONTRACTOR RESPONSIBILIN: N NEUTRAL <br /> 5. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW HORIZONTAL AND INTRABUIL�ING PATHWAVS AND EACH CONTR4CTOR SHALL BE RESPONSIBLE FOR THE BAS BUILDING AUTOMATION SYSTEM � <br /> ALLCOMPONENTSREQUIREDFORACOMPLETE SPACES. CONSTRUCTIONOFASEISMIC-FORGERESISTING NAC NOTIFICATIONAPPLIANCECIRCUIT • ry- � <br /> INSTALLATION. PROVIDE WMPONENTS REQUIRE� SYSTEM, DESIGNATED SEISMIG SYSTEM, OR OATT BATTERIES NEC NATIONAL ELECTRICAL CODE ��� EV E R ETT <br /> I FOR COMPLETE AND OPERATIONAL SYSTEMS 11. INTRABUILDING OPTICAL FIBER CABLING SHALL BE COMPONENT 45TED IN THE QUALITV ASSURANCE PLAN BIL BASIC IMPULSE INSUL4TION LEVEL NEMA NATIONAL ELECTRICAL MANUFACTURERS � � .:�;� p U BL I C .. <br /> WCLUDWGRACEWAVS, CONDUCTORS, BOXES, CLEARLVANDVISIBLVIDENTIFIEDINPULLBOXES, SHALLSUBMITAWRITTENCONTRACTOR'SSTATEMENT BKBD BACKBOARD ASSOCIATION � � � SCNOOLS <br /> SUPPORTS AND SIMILAR ITEMS. ENTRQNCE POINTS, FACH RISEft ROOM, AND 5'-0" OF RESPONSIBILIN TO THE REGULATORY AUTHORITV 9KR 9REAKER NF NON-FUSED <br /> I BEFORE ENTERING A FREE STAN�ING RACK UTILIZING HAVING JURISDICTION AN�TO THE OWNER PRIOR TO BLDG BUIL�WG NIC NOT IN CONTRACT � � <br /> 6. BRANCH CIRCUIT HOMERUNS ARE SHOWN TO AN OPTICAL FIBER CABLE MARKER TAG SYSTEM. THE COMMENCEMENT OF WORK ON THE SVSTEM OR NL NIGHT LIGHT <br /> INDICATE CIRCUIT PROPERTIES AND CONFlGURATION. COMPONENT. THE WNTR4GTOR'S STATEMENT OF NO [3ax 2046, F,Veret[,WA�98213 <br /> SMGLECIRCUITHOMERUNSSERVE� FROMTHESAME 12. CATEGORV6I6ACABLING: MAINTAINAMINIMUM RESPONSIBILINSHALLINCLUDETHEFOLLOWING: C CONOUIT; OEGREESCELSIUS <br /> I PANELBOARD MAY BE COMBWE� IN ACCORDANCE SPACING OF 12" FROM ELECTRICAL FEEDERS ANO CAB CABW ET OFC OPTICAL FIBER CABLE N(W W.eVefett5dAf9 <br /> WITH THE DNISION 2fi SPEqFICATIONS, UNLESS BRANCH CIRCUIT WIRING AND t2" FROM AUXILIARV A. ACKNOWLEDGMENT OF AWARENESS OF THE CAT CATEGORY OHL OVERHEAD LME <br /> IBRANCHEOIRCUITRAICEWAVAENDWRDNG ROMT SVSTEMCABLWG. pUALITVAS9URA CENPSAN NTAWEDINTHE CBN CRCUTNBREAKERNNATELEVISION 05 OCCUP�ANOVSENSOR TITLE <br /> . HOMERUNTODEVICESANDE�UIPMENTWITHCIRCUIT 13. MINIMUMSPACINGPROMELECTRICALAPPARATUS B. ACKNOWLEDGMENTTHATCONTROLWILLBE CCN CLOSEDCIRCUITTELEVISION OSP OUTSIDEPLANT GARFIELD <br /> � NUMBERSINDICATED. CONDUGTORQUANTITIESAND SUCHASMOTORDRIVENE�UIPMENTAND EXERq5E0TOOBTAINCONFORMANCEWITH CLG CEILING <br /> SIZESAREINDICATEOATHOMERUNSONLY. SHOW TRANSFORMERSSHALLBE6'-0". SPACWG THECONSTRUCTIONDOCUMENTSAPPROVED CM CEILING-MOUNTED P POLE ELEMENTARY � <br /> ACTUAL RACEWAV ROUTIN6 AND qRCUITING ON REQUIREMENTS SHALL APPLY TO OPEN CABLWG BV THE AUTHORIN HAVING JURISDICTION; <br /> RECOR� DRAWINGS. MINIMUMCONDUCTORSIZE #12 PATHWAYSWHEREEQUIPMENTISLOCATEDONTHE C. PROGEDURESFOREXERCISINGWNTROL CO WNDUITONLY PBX PRIVATEBRANCHEXCHANGE SCHOOL � � <br /> AWG. SAME FLOOR, FLOOR qBOVE, FLOOR BELOW, OR IN WITHIN THE CONTRACTOR'S ORGANIZATION, THE COW COMPUTER ON WHEELS PF POWER FACTOR . <br /> ROOMS ADJACENT TO SUCH E�UIPMENT AS THOUGH METHOD AND FRE�UENCV OF REPORTING AND CR CONTROLLED RECEPTACLE PH PHASE � <br /> � l. LOCATIONSOFRACEWAY, PATHWAYAN� SIMILAR WALLSANDPLOORSDIDNOTEXIST. EXCEPTION: THEDISTRIBUTIONOFTHEREPORTS', AND CT CURRENTTR4NSFORMER PIR PASSNEINFRARED <br /> ITEMSARESHOWNSCHEMATICALLV. COORDINATE BUILOINGCONSTRUCTIONTHATRESULTSIN D. IDENTIFICATIONAND �UALIFICATIONSOPTHE CU COPPER PN POSTINDICATINGVALVE PORTABLE �� <br /> INSTALLP.TION, WCLl10WGBUTNOTLIMITEDTO CONTINUOUSMETALLICBARRIERBETWEEN PERSON(5) EXERCISWGSUCHCONTROLAN� PNL PANEL � � <br /> CABLING, TELECOMMUNICATIONPATHWAYSANO ELECTRICALAPPARATUSANDCABLEPATHWAYS THEIRPOSITION(S) WTHEORGANIZATION. CLASSROOM I , <br /> SPACES, AND EXACT LOCATION OF HORRONTAL AND SHALL BE CONSIDEftED AS SUITABLE SEPARATION. ��C DIRECT DIGITAL CONTROL PP PATCH PANEL <br /> BACKBONE CABLING WITH LOCATIONS OF FIXED 4. DIVISION 26 RESPONSIBILITIES: DEMARC �EMARCATION POINT PT POTENTIALTR4NSFORMER <br /> CASEWORKANDBUILDMGCONDITIONSAFFECTING 14. PRIORTOSTARTINGTELECOMMUNICATIONS DISC DISCONNECT PVC POLWINYLCHLORIDE , <br /> THE WORK OFTHIS CONTRACT. INSTALLATION, CAREFULLV WSPECT INSTALLED WORK A. HANGERS AND SEISMIC BRACING FOR DIST DISTRIBUiION 2215 Pine St, Everett� I <br /> OF OTHER TRAOES AND VERIFY THAT SUCH WOftK IS ELECTRICAL SYSTEMS SHALL BE DESIGNED AND DSL DIGITAL SUBSCRIBER LINE RCP REFLECTED CEILING PLAN ' <br /> COMPLETETOTHEPOINTWHEREWORKMAV SPECIFIEDBYDIVISION26. DIVISION26SHALL DWG DRAWING REC RECEPTACLE WA98201 � <br /> PROPERLVCOMMENCE. NOTIFVTHEARCHITECTAND REFERWTHEELECTRICALDRAWINGSFOR <br /> ENGINEER IN WRITING OF CONOITIONS DETRIMENTAL LOGATIONS OF EQUIPMENT AND ELECTRICAL REF REFER TO I . ' � <br /> i TO THE PROPER AND TIMELV COMPLETION OF THE SYSTEMS AS STRUCTURAL DRAWINGS DO NOT (E) EXISTING REV REVISION . <br /> WORK. SHOW THE LOCATIONS OF ELECTRICAL EA EACH RM ROOM STAMP <br /> E�UIPMENT, RACEWAYS, ANDOTHER EF EXHAUSTPAN RU RACKUNIT xM <br /> 15. DO NOT BEGIN TELECOMMUNICATIONS INSTALLATION WMPONENTS. EIA ELECTRONIC INDUSTRIES ASSOCIATION �� � � <br /> UNTIL ALL UNSATISFACTORV CONDITIONS ARE B. DIVISION 26 SHALL COORDINATE THE SUPPORT ELEV ELEVATION SHT SHEET <br /> RESOLVED. BEGINNING WORK CONSTITUTES SYSTEMS ANO �ESIGN LOADS FOR HUNG <br /> ACCEPTANCEOFCONDITIONSASSATISFACTORY. RAGEWAYSANDOTHERELECTRICALSYSTEMS EM EMERGENCY SLC SIGNALINGLINEqRCUIT ' <br /> QNCLUDINGCOMBWEDMULTIPLERACEWAY EMT ELECTRICALMETALLICTUBING SM SINGLEMOOE C - <br /> 16. ROUTE CATEGORY 6/6A CABLES TO THEIR ASSIGNED RUNS) WITH THE GENERAL CONTRACTOR AND ENCL ENCLOSURE SMFC SURFACE-MOUMEO OPTICAL FIBER CABINET � . <br /> CROSS-CONNECT PER THE IDENTIFICATION LABEL AT THE STEEL AND WO00 JOIST MANUFACTURERS EPM ELECTRONIC POWER METER SMR SURFACE METAL RAGEWAV � <br /> EACHTELECOMMUNICATIONSWORKSTATIONDEVICE. INADDITIONTOOTHERTRADESTHATMAVBE EPO EMERGENCYPOWEROFF SONET SYNCHftONOUSOPTICALNETWORK 4 y�4� <br /> TERMINATE ALL CABIES ON 48-PORT PATCH PANELS IMPACTED. EQUIP EQUIPMENT SP SERVICE PROVIDER � � <br /> ON RACKS UNLESS OTHERWISE NOTE�. � ' <br /> ETR EXISTINGTOREMAIN SPD SURGEPROTECTIVEDEVICE . <br /> ' � �Z THEELECTRICALCONTRACTORSHALLPROVIDEALL EWC ELECTRICWATERCOOLER SPEC SPECIFICATIONS ISSUED: DATE: � <br /> CON�UIT, OUTLET BOXES, JUNCTION BOXES, SPST SWGLE POLE SINGLE THROW i � <br /> RACEWAY SYSTEMS, ETC. FORACOMPLETE AND F FUSE; OEGREES FAHRENHEIT ST SHUNT TRIP PERMIT SET APRIL 1, 2020 � . � <br /> OPERATIONALPATHWAVSYSTEMFORALL FA FIREAL4RM STP SHIELDEDTWISTEDPAIR � <br /> TELECOMMUNICATIONS SYSTEMS PER THE SCOPE OF FAAP FIRE AL4RM ANNUNGIATOR PANEL SVGA SUPER VIOEO GRAPHICS ARRAY � <br /> WORK INDICATE� ON THE CONSTRUCTION DRAWINGS I .. <br /> ANDBIDSPEGFICATIONS. FACP FIREALARMCONTROLPANEL SW SWITCH <br /> FBO FURNISHEDBVOWNER SWBD SWITCHBOARD <br /> 18. CABLETRAYPATHWAYSABOVEACCESSIBLECEILWGS FOIC FURNISHEDBYOWNERINSTALLEDBY . <br /> . SHALL BE PROVIDED BY THE ELECTRICAL CONTR4CTOR TBB TELECOMMUNICATIONS BONDING BACKBONE � <br /> � WNTRACTOR. CABLE TRAV PATHWAYS BELOW FOIO FURNISHED BY OWNER INSTALLED BV OWNER TEL TELEPHONE � . <br /> RAISED FLOOR SPACES SHALL BE PROVIDED BY THE F5� FlRE SMOKE �AMPER TELCO TELEPHONE COMPANY - � <br /> TELECOMMUNICATIONS CONTRACTOR, � <br /> TGB TELECOMMUNICATIONSGROUNDINGBUSBAR <br /> � G GROUND TIA TELECOMMUNICATIONSINDUSTRYASSOCIATION � <br /> 6B GROUND FAULT CIRCUIT BREAKER TMGB TELECOMMUNICATIONS MAIN GROUNDING . � <br /> GF 6ROUND FAULT CIRCUIT INTERRUPTER BUSBAR <br /> GFP GROUNDFAULTPROTECTION TP TAMPERPROOF <br /> GND GROUND TR TELECOMMUNICATIONS ROOM <br /> GRS GALVANIZED RIGID STEEL TTB TELEPHONE TERMINAL BOAR� <br /> N TELEVISION <br /> HC HORIZONTALCROSSCONNECT N55 TRANSIENTVOLTAGESURGESUPPRESSION ELECTRICAL �� <br /> HID HIGH INTENSITY �ISCHARGE TYP TVPICAL <br /> o HTR HEOATEROWER UG UNDERGROUND ABBREVIATIONS � <br /> ' o Hz HERR UL UNDERWRITERSLABORATORIES AND GENERAL � <br /> UON UNLESSOTHERWISENOTE� � <br /> i UPS UNINTERRUPTIBLEPOWERSUPPLY � � <br /> o IBC INTERNATIONALBUILDINGCODE NOTES I . <br /> o IC WTERMEDIATE CROSS CONNECT USB UNNERSAL SERIAL BUS <br /> / IDF INTERMEDIATE DISTRIBUTION FRAME UTP UNSHIELDED TYVISTED PAIR <br /> � w IEEE INSTITUTEOFELECTRICALANOELECTRONIC UV UNITVENTILATOR '� <br /> ENGINEERS <br /> — IG ISOLATEO GROUND V VOLTS �- <br /> 0 <br /> IMC INTERMEDIATEMETALLICCONDUIT VA VOLTAMPERES � <br /> NI ISDN INTEGRATED SERVICES DIGITAL NETWORK ' � <br /> / VPD VARIABLE PRE�UENCY DRNE PefRllf #: _ <br /> 0 <br /> . � J JUNCTION yy WATT; WIRE CUP #: � <br /> m W/ WITH <br /> o KCMIL THOUSAND CIRCULAft MILS yy�0 WITHOUT OWnef'S PfoJBCl #: <br /> � kVA KILOVOLTAMPERE yyq WORKSTATIONAREA <br /> o KVAR KILOVOLT AMPERE REACTNE yyqN WIDE AREA NETNORK AfChifeCl'S PfOjeGf #: ZOZO� OZ <br /> , /� kW KILOWATT WG WIREGUARD <br /> o WH WATTHOURME7ER DrawnBy KSR <br /> _ j LAN LOCALAREANETWORK � <br /> � LCP LIGHTINGCONTROLPANEL WP WEATHERPROOP CheCkedBy JPH <br /> a. a LT LGHTLEXCHANGECARRIER J(MFR TftANSFORMER <br /> � a E0 . 02 <br /> , o LTG LIGHTING <br /> z Y WYE <br /> a <br /> � M METER Z IMPEDANCE . <br /> a MAN METROPOLITANAREANETWORK <br /> z <br /> � � <br /> — LL <br /> a � <br /> O . —.—. _.. "_— —"__ _.— ._ _. _ . . . _'_'. _ _ _ .— _._. '_— —_.___'_.. . <br /> U _. ., . . _ .. _—'. _._ . . .— _- -- - . <br />