Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 25 <br /> Change Order Effective Date: 9-29-2020 <br /> CONTRACTOR <br /> BY ZQ.«Cc a o_ Date: 9/ 30/ZZô <br /> 0 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This Change Order No. 25 creates seventeen(17)new items and modifies four(4) existing bid items as <br /> shown below. <br /> Exhibit B—Existing and New Bid Item(s) <br /> Existing Bid Item#A-43—Ductile Iron Pipe for Storm Sewer,36-Inch Diameter Class 53. <br /> Modify existing bid item#A-43 entitled,"Ductile Iron Pipe for Storm Sewer, 36-Inch Diameter Class <br /> 53"at the Contract Unit Price of$3,450.00/LF,by adding 13 linear feet to the Contract,resulting in a <br /> Contract increase of$44,850.00. <br /> Existing Bid Item #A-77—30-Inch Diameter Flexible Coupling(Single Ball with Exp). Modify <br /> existing bid item#A-77 entitled,"30-Inch Diameter Flexible Coupling(Single Ball with Exp)"at the <br /> Contract Unit Price of$52,000/Each,by adding One(1) Coupling to the Contract,resulting in a <br /> Contract increase of$52,000.00. <br /> Existing Bid Item#A-92—Steel Reinforcing Bar-Utility Bridge. Modify existing bid item#A-92 <br /> entitled, "Steel Reinforcing Bar-Utility Bridge"at the Contract Unit Price of$1.80/LB, by adding <br /> 36,500.00 pounds to the Contract,resulting in a Contract increase of$65,700.00. <br /> Existing Bid Item#A-171—Shoring or Extra Excavation Class B. Modify existing bid item#A- <br /> 171 entitled,"Shoring or Extra Excavation Class B"at the Contract Unit Price of$10.00/SF,by adding <br /> 3,500 square feet to the Contract,resulting in a Contract increase of$35,000.00. <br /> New Item#A-326—Third Party Damage: Fisherman's Harbor Apartment Fire. Add new item# <br /> A-326 entitled,"Third Party Damage: Fisherman's Harbor Apartment Fire"at the agreed to Lump <br /> Sum Price of$1,020.00,resulting in a Contract increase of$1,020.00. <br /> New Item#A-327—Fence Replacement. Add new item#A-327 entitled, "Fence Replacement"at <br /> the agreed to Lump Sum Price of$5,545.00,resulting in a Contract increase of$5,545.00. <br /> Page 3 of 8 <br />