Laserfiche WebLink
Ni MATERIALS <br /> Work Activity Work Order Page 1 <br /> 10/22/2020 9:45 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 4/30/2020 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 675 <br /> Program <br /> Title TEST.75 INCH 1218 COLBY AVE 710119675 <br /> Work Order No 20201046 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 4/30/2020 Time 06:36 Original WO Billing <br /> Customer Information <br /> Customer Name Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( ) - Ext <br /> Second Phone ( ) - Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 1218 Street COLBY AVE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem WATER WATER <br /> Sub Problem OTHER OTHER <br /> Requested By Date Requested <br /> Agency Related Request <br /> Initiated From <br /> Utility Locate (USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Priority Estimated Hours <br /> Crew <br /> Contractor <br /> Assigned To <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments <br /> Action Taken CHECKED PRESSURE AND FLOW 58PSI AND 6GPM.EXCAVATED AROUND METER TO CONFIRM <br /> CURB STOP WAS ON ALL THE WAY,AND CHECKED FLOW AT 1220 COLBY BOTH HAVE.5 INCH <br /> SERVICE LINES AND FLOW OF 6GPM.INFORMED CUSTOMER IF THEY WANTED MORE THEY <br /> NEEDED TO SPEAK WITH JIM SPOONER TO COMPLETE ESTIMATE FOR WORK.THE CUSTOMER <br /> WAS SATISFIED WITH CURRENT FLOW. <br /> Recommended Action <br />