Laserfiche WebLink
I , <br /> Work Activity Work Order Page 2 <br /> 8/18/2020 13:45 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 3/12/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 5 E MARILYN AVE UT3473-20-3 <br /> Work Order No 20200910 Project " Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 3/12/2020 Time 12:56 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS1384Y028 WASRVC YES 5/5/2020 <br /> Address 5 E MARILYN AVE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 1 17.118 05/08/2020 PM <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.608 05/08/2020 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 210.989 05/08/2020 PM <br /> M NIPP34132047 NIPPLE 3/4 NPTX6 BRASS 1 5.128 05/08/2020 PM <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 123.222 05/08/2020 PM <br /> Total Material Cost r $432.07 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS .25 6.405 05/08/2020 <br /> NA N/A SHARKBITE 3/4 X 1" 1 8.67 05/08/2020 <br /> NA N/A TOPSOIL .12 3.554 05/08/2020 <br /> Total NA Cost $18.63 <br /> Personnel Costs <br />