Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 9/23/2020 14:59 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 6/1/2020 <br /> Fund 401 Accounts Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 9230 1ST AVE SE UT3473-20-3 <br /> Work Order No 20201158 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 6/1/2020 Time 15:18 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WS1384R006 WASRVC YES 6/22/2020 <br /> Address 9230 1ST AVE SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 9230 1ST AVE S.E. <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 17.403 06/23/2020 PAP <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.608 06/23/2020 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R900I CU FT STUB ANTENNA 1 210.989 06/23/2020 PAP <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.431 06/23/2020 PAP <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 123.222 06/23/2020 PAP <br /> Total Material Cost C428.65_� <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 06/23/2020 <br /> NA N/A TOPSOIL .13 3.851 06/23/2020 <br /> NA N/A TRACING WIRE 3 .6 06/23/2020 <br /> NA N/A WIRE CLAMP 1 1.62 06/23/2020 <br /> Total NA Cost $12.48 <br /> Personnel Costs <br /> ON 1ILUJad OZOZ/ZZ/9 pa}aldwoa a}ea awll / / e ea}.le}g <br /> (N/A)uo1leu.uoi.ul lsoo qor 1alNVO'_1D)Aldr de' AA panaddw <br />