Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 9/24/2020 9:54 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 6/12/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 9330 1ST AVE SE UT3473-20-3 <br /> Work Order No 20201208 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 6/12/2020 Time 09:10 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS1384R009 WASRVC YES 6/10/2020 <br /> Address 9330 1ST AVE SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 9330 1ST AVE S.E. <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 17.403 06/10/2020 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 4.152 06/10/2020 PAP <br /> M VALV34008348 VALVE METER 3/4 LOCKWING ANGLE METER VALVE SWVLNUT X 3/4FIP 1 67.073 06/10/2020 PAP <br /> Total Material Cost �88.62� <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A UNIVERSAL TRANS COUPLING 1 24.34 06/10/2020 <br /> Total NA Cost $24.34 <br /> Total Cost $112.96 <br />