My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/02 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:30:39 AM
Creation date
12/3/2020 2:48:45 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -site meetings will be dependent on travel policies regarding Covid-19 restrictionsset by City of Everett, <br />Timmons Group, and or States of Washington, Oregon, Virginia, Maryland and/or Louisiana depending on <br />resources required. <br />If on -site meetings cannot occur, they will be replaced via virtual meetings <br />Phase 1, Task 2: Estimated Timeframe: <br />. Project Kick-off meeting should occur approximately 4 weeks after the project has been initiated <br />P hase 1 Exit Criteria: <br />• Bi-weekly Project Status Reports <br />• A project collaboration portal will be setup for the duration of the project and for support after Go -live <br />• Project Management Plan <br />• Project Kick-off presentation & meeting minutes <br />P hase 2: Cityworks Environment Preparation & Installation <br />P hase 2, Task 3. Implementation Planning <br />The goal of this task and its subtasks is to develop the IT System Architecture components of the System <br />Design and Configuration (SD&C) Plan that consolidates the gathered existing IT system architecture <br />data with requirements, and interface requirements that will be identified and modeled during the <br />"Discovery" portion of the project. <br />Phase 2, Task 3 City's Responsibility: <br />City's project manager assistance in .scheduling necessary kickoff meetings (4 FTE hours) <br />City's Information System stakeholder' attendance/participation meeting. (4 FTE hours each attendee). <br />Phase 2, Task 3 Timmons Group Responsibilities and Deliverables: <br />IT System Architecture document. <br />Phase 2, Task 3: Assumptions: <br />• City will provide the necessary information for connections to the City provided off -site Azure system <br />environment <br />Phase 2, Task 3: Estimated Timeframe. <br />• City provided off -site Azure environment should be available approximately 4 weeks after <br />initiated <br />the project has been <br />Phase 2, Task 4: IT System Review <br />Our implementation team will meet with the City's' project management team and IT/GIS staff to discuss <br />hardware and environment requirements for the Cityworks implementation to include Cityworks Office, <br />Respond and Mobile app. During this meeting, various system architectures and minimum requirements <br />will be explored to ensure a stable implementation for the City. The goal is to ensure the off -site hosted <br />environment is in place and that all related system and security policies are understood prior to initial <br />software configuration. <br />The implementation team will document the Core System Design Plan components required to support <br />the Cityworks implementation The Core System Design Plan is developed in preparation for the <br />configuration and implementation of Cityworks. This plan will include the following: <br />• Network Requirements • Hardware Requirements <br />• Peripheral Requirements • Software Applications <br />• Internal Security • DMZ <br />• Access to externalized data • Mobile device requirements <br />15JPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.