Laserfiche WebLink
CERTIFICATE OF COMPLETION <br />Project: 2020 Biosolids Removal <br />Contractor: American Process Group Inc. <br />Work Order No. 3705A <br />The above mentioned project was constructed per the plans and specifications and to <br />the satisfaction of the Public Works Department. <br />The Contractor physically completed the project, within the time allowed in the <br />contract. <br />It is recommended that the City accept this project as complete. <br />Recommended by: <br />Public Works Director <br />Ryan Sass <br />Approved by: <br />f( zoLcs <br />Date <br />Mayor, City of Everett Date <br />Cassie Franklin <br />Attest: <br />City Clerk <br />Sharon Fuller <br />APPROVED AS TO FORM <br />By: <br />David Hall, City Attorney Date <br />