My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9209 10TH AVE SE 2020-12-08
>
Address Records
>
10TH AVE SE
>
9209
>
9209 10TH AVE SE 2020-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 1:53:12 PM
Creation date
12/8/2020 1:53:04 PM
Metadata
Fields
Template:
Address Document
Street Name
10TH AVE SE
Street Number
9209
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> 10/28/2020 10:06 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 7/28/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 9209 10TH AVE SE UT3473-20-3 <br /> Work Order No 20201411 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 7/28/2020 Time 08:10 Original WO Billing <br /> Customer Information <br /> Customer Name Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( ) - Ext <br /> Second Phone ( ) - Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 9209 Street 10TH AVE SE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem WATER WATER <br /> Sub Problem OTHER OTHER <br /> Requested By Date Requested <br /> Agency Related Request <br /> Initiated From <br /> Utility Locate (USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Priority Estimated Hours <br /> Crew <br /> Contractor <br /> Assigned To <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments INVENTORY MATERIAL IN THE AMOUNT OF$506.59 JOURNALIZED IN <br /> 2020 <br /> Action Taken CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND BOX.FLAT TO METER <br /> PROJECT.MEASUREMENTS ARE ON GO-SYNC. <br /> Recommended Action <br /> Approved By JDF JERRETT, DANIEL F. Job Cost Information(Y/N) <br /> Start Date i i Time Date Completed 8/5/2020 Permit No <br />
The URL can be used to link to this page
Your browser does not support the video tag.