Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall review its responsibilities under Chapter 19.122 RCW, a law <br /> relating to underground utilities. Cost to the Contractor incurred as a result of complying <br /> with this law shall be at the Contractor's expense. In accordance with RCW 19.122, the <br /> Contractor shall call the Utility Coordinating Council One Call Center, 1-800-424- <br /> 5555, for field location, not less than 2 nor more than 10 business days before the <br /> scheduled date for commencement of excavation that may affect underground utility <br /> facilities, unless otherwise agreed upon by the parties involved. A business day is <br /> defined as any day other than Saturday, Sunday, or a legal local, State, or Federal <br /> holiday. <br /> The Contractor shall be responsible for determining the exact location, including service <br /> connections, of all public and private underground utilities marked at the site of the Work. <br /> The Contractor shall perform field verification prior to beginning Work that could result <br /> in damage to buried utilities, including but not limited to exploratory excavations, in <br /> sufficient time so as not to impede the progress of the Work or fabrication of materials <br /> to be incorporated into the Work. The Contractor shall immediately notify the City's <br /> Representative as to any utility discovered by him in a different position than shown on <br /> the Plans or that is not shown on the Plans. <br /> No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of the <br /> City to show the existence of subsurface objects or installation on the Plans shall not <br /> relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience as of January 30, 2020: <br /> Snohomish County PUD #1 Puget Sound Energy <br /> P.O. Box 1107 3630 Railway Ave <br /> Everett, Washington 98206 Everett, WA 98201 <br /> Attn: Andra Shaughnessy Flaherty Attn: Mardy Punteney <br /> Tel. (425) 783-4419 Tel. (425) 754-8053 <br /> Email: Alflaherty@Snopud.Com Email: Mardy.Punteney@pse.com <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-83 <br />