CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. Include submittals to agencies required for performance of Work with <br /> sufficient, adequate and reasonable time for review, comment and return <br /> submittals. <br /> 5. Allow for appropriate durations to complete activities that may be affected <br /> by weather during the time of year the activities are performed. <br /> 6. Identify logical connections, dependency upon preceding or succeeding <br /> activities, restraints or constraints, planned start and completion dates, <br /> duration, actual start and completion dates, and variances. <br /> 7. Activity durations shall not exceed twenty (20) days. The activities shall <br /> be related to early and late start, early and late finish, and Float dates. <br /> Activities listed in the Preliminary Schedule shall be included in all subsequent <br /> schedules. No activity in the Preliminary Schedule shall be deleted without prior <br /> written consent of the Representative and City. <br /> Contractor shall notify City's Representative and City in writing and highlight the <br /> addition of all activities to the schedule after the Preliminary Schedule. <br /> The Baseline Schedule shall be part of the Contract. <br /> Each activity shall be identified with a number that incorporates the Specification <br /> section number. <br /> Activities shall be consistent and identified with the Schedule of Values (if <br /> applicable) or unit prices of the bid schedule. All elements and items in the <br /> Schedule of Values or unit prices in the bid schedule shall appear in the Progress <br /> Schedules. <br /> Contractor shall provide sub-schedules for each stage/phase of Work as required <br /> by City, City's Representative, or Subcontractor. <br /> Contractor shall provide sub-schedules to define major portions of the entire <br /> schedule. Include long-lead-time items for Equipment and material that requires <br /> long fabrication time. Order these well in advance of required delivery time to <br /> sequence with overall construction schedule. <br /> Each schedule shall show accumulated percentage of completion of each activity, <br /> and total percentage of Work completed, as of the date of payment application. <br /> Contractor shall include in each schedule as activities the submission, review, and <br /> correction of Submittals, Shop Drawings, Product Data and Samples. The <br /> schedule should show: <br /> 1. The dates for Contractor's Submittals. <br /> 2. A minimum of 14 calendar days duration for City or City's <br /> Representative's review. <br /> 3. Indicate decision data for selection of finishes. <br /> 4. Show Submittal preparation, submission, review, and breakdown at a <br /> minimum. Show individual parts of major Submittals. <br /> Contractor shall identify any and all Work furnished by City and installed by City on <br /> the construction schedule. <br /> 1-08.3(4) Measurement <br /> Delete 1-08.3(4). <br /> 1-08.3(5) Payment <br /> Delete 1-08.3(5) and substitute the following: <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—97 <br />