My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> If the Engineer determines that the Contractor has pursued the Work diligently before <br /> the suspension, then the City will maintain the temporary roadway, sidewalk, and path <br /> (and bear its cost). This City-provided maintenance work will include only routine <br /> maintenance of: <br /> 1. The Traveled Way, Auxiliary Lanes, Shoulders, detour surface, sidewalks, and <br /> paths, <br /> 2. Roadway drainage along and under the traveled Roadway, sidewalk, path or <br /> detour, and <br /> 3. All barricades, signs, and lights needed for directing traffic through the <br /> temporary Roadway, sidewalk, path or detour in the construction area. <br /> The Contractor shall protect and maintain all other Work in areas not used by traffic. All <br /> costs associated with protecting and maintaining such Work shall be the responsibility <br /> of the Contractor except those costs associated with implementing the TESC Plan <br /> according to Section 8-01. <br /> After suspension during which the City has done the routine maintenance, the Contractor <br /> shall accept the traveled Roadway, sidewalk, path or detour as is when Work resumes. <br /> The Contractor shall make no claim against the City for the condition of the Roadway or <br /> detour. <br /> After any suspension, the Contractor shall resume all responsibilities the Contract <br /> assigns for the Work. <br /> 1-08.8 Extensions of Time <br /> Delete the first and second sentences in the second paragraph of 1-08.8. <br /> Supplement 1-08.8 by adding the following: <br /> Any requests for extensions in Contract Time, whether resulting from Extra Work <br /> directed by the City or not, shall be accompanied by an analysis of schedules using the <br /> critical path method. This analysis shall include an updated schedule, an as-planned <br /> schedule, an as-built schedule, a but-for schedule, and narrative explaining the alleged <br /> causes, schedule impacts and all costs related to or arising out of the proposed <br /> extension. Any requests for extensions of Contract Time by the Contractor shall be <br /> submitted in accordance with these Contract Documents. Extensions of Contract Time <br /> will be granted only as provided in the Contract Documents and to the extent that <br /> affected critical activities exceed the Total Float time along the affected paths of the <br /> reviewed Preliminary Schedule at the time the change was authorized in writing by the <br /> City. Contractor has the burden of clearly and convincingly demonstrating entitlement <br /> to any adjustment of Contract Time. <br /> If the City is solely responsible for any Delay to Substantial Completion, Physical <br /> Completion, Completion Date, or Final Acceptance, the Contractor shall only be entitled <br /> to compensation or other damages as described in 1-09.11A REMEDIES, provided that <br /> Contractor timely gave Notice pursuant to 1-04.5 NOTICE BY CONTRACTOR, timely <br /> submitted a Contract Claim pursuant to 1-09.11(2) CONTRACT CLAIMS and fulfilled the <br /> requirements of 1-08.3 PROGRESS SCHEDULE. <br /> 1-08.9 Liquidated Damages <br /> Revise the fourth paragraph of 1-08.9 to read as follows: <br /> When the Contract Work has progressed to Substantial Completion as defined in the <br /> Contract, the Engineer may determine that the work is Substantially Complete. The <br /> Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br /> overruns in Contract time occurring after the date so established, the formula for <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-103 <br />