My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Fill all voids associated with lifting provisions provided by the manufacturer. These <br /> voids shall be filled with non-shrinking grout providing a finished surface consistent <br /> with adjacent surfaces. Trim all protruding lifting provisions flush with the adjacent <br /> concrete surface in a manner, which leaves no sharp points or edges. Remove all <br /> loose material and pooling water from the water quality treatment structure prior to <br /> the transfer of operational responsibility to the Owner. <br /> 7-06.2 Submittals <br /> Submit shop drawings for review and approval a minimum 20 days prior to ordering <br /> structures. <br /> The manufacturer shall submit to the Engineer a "Manufacturer's Performance <br /> Certification" certifying that each unit is capable of achieving the specified removal <br /> efficiencies and flow rates listed in the plans and special provisions. <br /> Submissions for substitutions require review and approval of the Engineer, for <br /> hydraulic performance, impact to project design, and equivalent treatment <br /> performance. Contractor to coordinate with the Engineer for any modifications <br /> resulting from the product substitution. <br /> 7-06.3 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-06.4 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will <br /> be as described in Division B — Bid Item Descriptions of these Special Provisions <br /> and Section 1-09 MEASUREMENT AND PAYMENT of the Standard <br /> Specifications. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> Controlled Density Fill 2-09.3(1)E Special Provisions <br /> Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br /> 7-08.3 Construction Requirements <br /> 7-08.3(1) Excavation and Preparation of Trench <br /> 7-08.3(1)A Trenches <br /> Revise the second paragraph in 7-08.3(1)A to read as follows: <br /> Excavate trench in accordance with COE Standard Drawing No 614. <br /> Delete the second sentence in the third paragraph in 7-08.3(1)A and substitute the <br /> following: <br /> Contractor may excavate above the top of the pipe zone only as wide as <br /> necessary to meet OSHA requirements. <br /> 7-08.3(1)C Bedding the Pipe <br /> Delete the second and third paragraphs in 7-08.3(1)C and substitute the following: <br /> Provide pipe zone bedding in accordance with COE Standard Drawing 614, <br /> and 615.All structural fill material placed as pipe zone bedding shall be crushed <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 7—STORM, SEWER,WATER <br /> SP-161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.