My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> rim and invert elevations, prior to construction, of all existing structures and pipes where <br /> connections are to be made. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, <br /> tools, survey instruments, materials and other equipment necessary for obtaining the "as <br /> constructed" location and elevations of the Work, in particular, storm drain pipe invert <br /> elevations and other information necessary for production of the Record Drawing (As- <br /> Constructed) documents meeting the requirements defined in RECORD DRAWINGS of <br /> these Special Provisions. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, <br /> tools, survey instruments, materials and other equipment necessary for furnishing and <br /> placing survey monuments and monument cases with covers that are disturbed by the work <br /> in accordance with Section 8-13. <br /> Bid Item 3 - Traffic Control Labor <br /> Measurement and Payment: Unit Price per Hour <br /> This unit price bid item includes all costs associated with traffic control labor as identified in <br /> 1-10.3(3) TRAFFIC CONTROL LABOR. Furnish all personnel for flagging to control traffic, <br /> including pedestrians, during construction operations in accordance with Section 1-10 of the <br /> Standard Specifications, the Plans, approved traffic control plans, these Special Provisions <br /> and as directed by the City. <br /> Payment will be the hourly rate per the unit price and at least as much as the prevailing wage <br /> rate with all benefits at the time of bid opening. <br /> Bid Item 4 - Maintenance and Protection of Traffic Control <br /> Measurement and Payment: Lump Sum <br /> Measurement for Maintenance and Protection of Traffic Control shall be the ratio of the <br /> number of working days completed to the total number of working days authorized in the <br /> Contract. <br /> This lump sum bid item includes the maintenance and protection of traffic control materials, <br /> tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2) <br /> MAINTENANCE AND PROTECTION OF TRAFFIC CONTROL, including but not limited to, <br /> signs, barricades, cones, flashers, reader boards, and temporary pavement markings. Also <br /> included is cost associated with preparation and distribution of public notices involving <br /> parking, street access or traffic issues. <br /> Bid Item 5 - Trench Excavation Safety Systems <br /> Measurement and Payment: Lump Sum <br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and <br /> backfilled to the total quantity of pipe listed on the Proposal. <br /> The lump sum bid item includes the costs directly allocated to the safety system for trenches <br /> and all other excavations including, but not limited to, shoring, benching, bracing, excavation, <br /> sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, <br /> 2, 7, and 8 of the Standard Specifications and Special Provisions. Payment per lump sum <br /> includes all equipment, materials, labor, installation, and removal, and all other work required <br /> to meet the trench excavation and safety system requirements. <br /> Jackson Park Area Stormwater Separation Division B—BID DESCRIPTIONS September 2020 <br /> WO No—UP3703 SP-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.