<br /> Bid Item 16 - PE Storm Drain Pipe, 18-Inch
<br /> Bid Item 17 - PE Storm Drain Pipe, 24-Inch 1
<br /> Measurement and Payment: Unit Price per Linear Foot
<br /> The unit price per linear foot bid for the type and size of storm drain pipe shall be full
<br /> compensation for all labor, material, incidentals, tools and equipment necessary to complete
<br /> the work as defined in these Contract Documents.
<br /> The unit price per linear foot of storm drain pipe shall be full compensation for furnishing,
<br /> hauling, and assembling in place the completed installation, including all wyes, tees, caps,
<br /> plugs, special fittings, joint materials and adjustment of inverts and connections to inlets,
<br /> catch basins and manholes for the completion of the installation to the required lines and
<br /> grades.
<br /> The unit price of storm drain pipe shall also include, but not be limited to; all costs for trench
<br /> excavation; hauling and disposing of surplus material; dewatering; storm water flow
<br /> bypassing; furnishing, stockpiling, hauling placing and compacting of suitable native backfill;
<br /> cleaning and flushing pipes and existing structures; testing and inspecting pipe; pipe
<br /> separation pads; connecting pipe to existing structures; reconnecting existing storm drains;
<br /> and replacing, protecting, and maintaining utilities.
<br /> All costs associated with abandoning existing storm drainage pipe as indicated on the plans
<br /> including plugging and/or removal and disposal shall be included in the unit price for this bid
<br /> item.
<br /> Bid Item 18 — Bore and Jack Installation, 36-Inch Dia. Casing
<br /> Measurement and Payment:Unit Price per Linear Foot
<br /> The unit price per linear foot of Bore-and-Jack Pipe Installation, 36-inch diameter casing shall
<br /> be full compensation for all labor, materials, submittals, equipment, casing, carrier pipe (size
<br /> defined on plans), restrained joints, spacers, end seals, excavation of the jacking/receiving
<br /> pits (including shoring and dewatering), bedding, backfill and compaction, traffic control,
<br /> disposal of excess materials, surface restoration (including sawcutting, pavement removal
<br /> and replacement), and survey information required in this specification.
<br /> Bid Item 19 - Inlet
<br /> Bid Item 20 - Catch Basin, Type 1
<br /> Bid Item 21 - Catch Basin, Type 1 L
<br /> Bid Item 22 - Catch Basin, Type 2, 48-inch Dia
<br /> Measurement and Payment: Unit Price per Each
<br /> The unit price per each for the inlet or the type and size of catch basin shall be full
<br /> compensation for all labor, material, incidentals, tools and equipment necessary to
<br /> satisfactorily complete the work as defined in these Contract Documents.
<br /> The unit price for each inlet and catch basin shall be full compensation for furnishing, hauling,
<br /> and assembling in place the completed installation including inlets, catch basins, frames and
<br /> grates, adjustment sections, pipe connections, special fittings, and joint materials up to a
<br /> Jackson Park Area Stormwater Separation Division B—BID DESCRIPTIONS September 2020