My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 34 - Double Chain Link Gate, 12-Foot - Relocate <br /> Measurement and Payment: Lump Sum <br /> The lump sum price for this bid item shall be full compensation for all labor, materials, <br /> equipment to remove an existing double chain link gate, 12-foot and re-install it within the <br /> new fence at the location shown on the plans. Any work or materials necessary to complete <br /> the gate reinstallation that are not otherwise included in Bid Item 33 are incidental to this bid <br /> item. <br /> Bid Item 35 - Force Account <br /> Measurement and Payment: Force Account <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> The Force Account bid item has been included for specific miscellaneous work items listed <br /> below and for any additional work directed by the Engineer that is not required by the original <br /> Contract and to address changed conditions or unanticipated work. The amount indicated in <br /> the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br /> under this bid item may vary from no payment to the full amount of the bid item. Work <br /> performed under this bid item will be initiated with a work directive issued by the Engineer. <br /> In lieu of the preceding prescribed method of determining payment for Force Account work, <br /> payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br /> Contractor prior to beginning the Force Account work. <br /> The following miscellaneous construction work will be paid for by Force Account as specified <br /> in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br /> Bidders, and for that purpose only, the City has estimated an amount and included it in the <br /> bid item for Force Account work to become part of the total Bid by the Contractor. <br /> (a) Repair or replace existing water service pipes beyond the limits indicated on the <br /> Plans. <br /> (b) Repair or replace storm or sanitary side sewer pipes beyond the limits indicated <br /> on the Plans. <br /> (c) Restoration of existing special private improvements including, but not limited to, <br /> brick or stone walkways, decorative concrete walks or driveways, concrete <br /> masonry or stone walls, rockery's, fences, landscape plantings, including but not <br /> limited to, hedges, trees, flowerbeds, bark, mulch, irrigation systems, yard <br /> lighting, rockeries, retaining walls, or steps. <br /> (d) Topsoil and seeding, including areas adjacent to sidewalk installation. <br /> Grant Eligible Bid Items: <br /> Most of the work is considered "grant eligible" however, some work is not. The City will utilize the <br /> contractors pay requests to determine the amount of cost reimbursement that Ecology shall pay <br /> the City. The contractor is expected to complete work and submit pay requests for all of the "grant <br /> eligible" work no later than June 30, 2021. The following is a summary tabulation that defines the <br /> amount (percentage) of the bid item's value that is considered "grant eligible". <br /> Bid Item Description % Grant <br /> No. Eligible <br /> 1 MOBILIZATION 100 <br /> 2 SURVEYING 100 <br /> 3 TRAFFIC CONTROL LABOR 100 <br /> 4 MAINTENANCE AND PROTECTION OF TRAFFIC CONTROL 100 <br /> Jackson Park Area Stormwater Separation Division B—BID DESCRIPTIONS September 2020 <br /> WO No—UP3703 SP -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.