My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE <br /> BIDDER: <br /> ITEM PLAN TOTAL <br /> ITEM DESCRIPTION UNIT PRICE <br /> NO. QUANTITY AMOUNT <br /> 1 1 LS MOBILIZATION S $ <br /> 2 1 LS SURVEYING $ $ <br /> 3 1,200 HR TRAFFIC CONTROL LABOR $ $ <br /> 4 1 LS MAINTENANCE AND PROTECTION $ $ <br /> OF TRAFFIC CONTROL <br /> TRENCH EXCAVATION SAFETY <br /> 5 1 LS SYSTEMS $ $ <br /> 6 100 1-1R STREET CLEANING AND SWEEPING $ $ <br /> EROSION/WATER POLLUTION <br /> 7 1 LS CONTROL $ $ <br /> 8 3,400 LF SAWCUT EXISTING IMPROVEMENTS $ $ <br /> 9 850 TON CRUSHED SURFACING BASE $ $ <br /> COURSE <br /> 10 2,500 TON GRAVEL BORROW $ $ <br /> 11 50 TON FOUNDATION MATERIAL $ $ <br /> 12 1 LS TEMPORARY ROADWAY PATCH $ $ <br /> 13 86 TON CRUSHED SURFACING TOP COURSE $ $ <br /> 14 965 LF PE STORM DRAIN PIPE, 12-INCH DIA $ S <br /> 15 36 LF PE STORM DRAIN PIPE, 15-INCH DIA $ S <br /> 16 1,055 LF PE STORM DRAIN PIPE, 18-INCH DIA $ $ <br /> 17 96 LF PE STORM DRAIN PIPE, 24-INCH DIA $ $ <br /> BORE AND JACK INSTALLATION, 36- <br /> 18 120 LF $ $ <br /> INCH DIA CASING <br /> 19 4 EA INLET $ $ <br /> 20 2 EA CATCH BASIN, TYPE 1 $ $ <br /> Jackson Park Area Stormwater Separation Division P—PROPOSAL Addendum 1 <br /> Work Order No.—UP3703 SP—16 September 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.