My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Sections and subsections in the Special Provisions labeled under the headers with (******) <br /> indicate City of Everett Provisions. <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> Delete the three paragraphs under the heading Completion Dates, and substitute the <br /> following: <br /> Substantial Completion Date: The day the Engineer determines the City has full and <br /> unrestricted use and benefit of the facilities, both from the operational and safety <br /> standpoint, any remaining traffic disruptions will be rare and brief, and only minor <br /> incidental work, replacement of temporary substitute facilities, plant establishment <br /> periods, or correction or repair remains for the Physical Completion of the total Contract. <br /> Physical Completion Date: The day all of the Work is physically completed on the <br /> project. All documentation required by the Contract and required by law does not <br /> necessarily need to be furnished by the Contractor by this date. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical <br /> work, including Punch List, is complete and Contractor has completed and fulfilled all <br /> contractual obligations except any maintenance of landscaping. Contractual obligations <br /> that must be fulfilled prior to achievement of the Completion Date include and are not <br /> limited to; the Contractor's furnishing all documentation, including correct, complete and <br /> accurate as-built or record drawings and operation and maintenance manuals and <br /> transfer of warranties. (This definition replaces the definition in WSDOT 1-01.3 for <br /> Completion Dates.) <br /> Revise the following definitions to read as follows: <br /> Bid Documents: The component parts of the proposed Contract which may include, <br /> but are not limited to, the Proposal Form, the proposed Contract Provisions, the <br /> proposed Contract Plans, and Addenda. (This definition replaces the definition in <br /> WSDOT 1-01.3 for Bid Documents.) <br /> Contract: Written agreement signed between the Owner and Contractor and includes <br /> Division C — CONTRACT, Division P - PROPOSAL, Division B — BID ITEM <br /> DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications and <br /> amendments, Standard Plans in effect as of the date Bids are opened, Addenda, <br /> supplemental agreements, change orders, certifications and affidavits required by this <br /> Contract and by law, and Federal requirements that apply to this Contract and Project. <br /> (This definition replaces the definition in WSDOT 1-01.3 for Contract.) <br /> Contract Bond(s): Include a separate performance bond and payment bond, as set <br /> forth in the Contract Documents. (This definition supplements the definition in WSDOT <br /> 1-01.3 for Contract Bond.) <br /> Engineer: The City's representative who administers the construction program for the <br /> City. Provisions in the Contract Documents that state the Engineer"shall" or "will" shall <br /> be deemed to mean that the Engineer shall or will take such action if requested in writing <br /> by the Contractor. (This definition replaces the definition in WSDOT 1-01.3 for <br /> Engineer.) <br /> Specifications: Includes 2020 WSDOT/APWA Standard Specifications and latest <br /> Amendments, and all other specifications (including these Special Provisions) for the <br /> prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1- <br /> 01.3 for Specifications.) <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.