My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> each item of claimed Extra Work shall constitute a waiver of any Contract Claim for <br /> reimbursement or additional Contract Time for each such item of Extra Work. The <br /> Contractor shall permit the City access to these and any other records needed for <br /> evaluating requests for additional Contract Time or Contract Sum. <br /> 1-04.6 Variation in Estimated Quantities <br /> Revise the first paragraph to read as follows: <br /> Payment to the Contractor will be made only for the actual quantities of Work performed <br /> and accepted in conformance with the Contract. When the accepted quantity of Work <br /> performed under a unit item varies from the original Proposal quantity, payment will be <br /> at the unit Contract price for all Work unless the total accepted quantity of any Contract <br /> item, adjusted to exclude added or deleted amounts included in change orders accepted <br /> by both parties, increases or decreases by more than 25 percent from the original <br /> Proposal quantity, and if the total extended bid price for that item at time of award is <br /> equal to or greater than 10 percent of the total contract price at time of award. In that <br /> case, payment for contract work may be adjusted as described in the Standard <br /> Specifications and modified in these Special Provisions. <br /> 1-04.7 Differing Site Conditions (Changed Conditions) <br /> Delete all of 1-04.7 and substitute the following: <br /> Upon discovery and before such conditions are disturbed, the Contractor shall promptly <br /> provide Notice to the City's Representative of: <br /> Pre-existing subsurface or latent physical conditions at the site differing materially <br /> from those indicated in this Contract, or <br /> Pre-existing unknown physical conditions at the site, of an unusual nature, differing <br /> materially from those ordinarily encountered and generally recognized as inhering <br /> in work of the character provided for in this Contract. <br /> Upon written request, the City's Representative shall determine whether the actual <br /> conditions encountered by the Contractor conditions are materially different and, if so, <br /> are the cause of a material increase or decrease in the Contractor's cost of performance <br /> of the Work, or extend the duration of the critical path of the schedule. Upon such <br /> determination, the City's Representative will make an adjustment of Contract Sum or <br /> Contract Time, as appropriate. Extensions of Contract Time will be evaluated in <br /> accordance with 1-08.3 PROGRESS SCHEDULE. <br /> The City's Representative's determination that differing site conditions do not exist <br /> and/or the appropriate adjustment in Contract Sum or Contract Time (if any) shall be <br /> final. If there is a decrease in the cost or time required to perform the Work, failure of <br /> the Contractor to notify the City's Representative of the differing site condition shall not <br /> affect the City's right to make an adjustment in the Contract Sum or Contract Time. <br /> Additionally, no Contract Claim or adjustment of Contract Sum or Contract Time shall be <br /> allowed unless the Contractor has followed the procedures provided for in this Contract, <br /> including, but not limited to, furnishing timely Notice of the event and its effect on <br /> Contract Time and Contract Sum as required herein. <br /> Contractor shall in no event be entitled to a Contract Claim or adjustment of Contract <br /> Sum or Contract Time based on an allegation that the pre-existing subsurface or latent <br /> physical conditions at the site differing materially from those indicated in this Contract <br /> unless Contractor establishes that it reasonably relied on the conditions indicated in this <br /> Contract when making its bid, that the actual conditions encountered on the site differed <br /> materially from those indicated in this Contract, and that such materially-different <br /> conditions were not foreseeable at the time of its bid. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.