Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall make best effort to utilize recycled materials in the construction of <br /> the project as detailed in elsewhere in the Standard Specifications and these Special <br /> Provisions. <br /> Prior to Physical Completion Contractor shall report the quantity of recycled materials <br /> utilized in the construction of the project for each of the items listed in Section 9-03.21. <br /> Include hot mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag <br /> and other recycled materials (e.g. utilization of on-site material and aggregates from <br /> concrete returned to the supplier). Contractor shall provide report on DOT form 350- <br /> 075A Recycled Materials Reporting. <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> 1-07.1 Laws to be Observed <br /> Revise 1-07.1 by replacing the second sentence of the first paragraph with the following: <br /> The Contractor shall indemnify, defend, and save harmless the City (including its agents, <br /> officers, and employees) against any claims that may arise because the Contractor (or <br /> any employee of the Contractor or Subcontractor or materialperson) violated a legal <br /> requirement. <br /> Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], Section <br /> 508 of the Clean WaterAct(33 U.S.C. 1368), Executive Order 11738, and Environmental <br /> Protection Agency Regulations (40 CFR Part 15). (Contracts, subcontracts, and <br /> subgrants of amounts in excess of$100,000). <br /> The Contractor shall comply with mandatory standards and policies relating to energy <br /> efficiency that are contained in the state energy conservation plan issued in compliance <br /> with the Energy Policy and Conservation Act (Pub. L. 94-163). <br /> The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the completion <br /> of this project. The City advises each prospective Contractor that they are responsible <br /> to be aware of and comply with all applicable statutes and regulations. It is <br /> recommended that each Contractor contact the local office of the following agencies for <br /> a list of applicable regulations and requirements that might affect the implementation of <br /> this project: <br /> • Federal Environmental Protection Agency <br /> • Washington Department of Health <br /> • Washington Department of Ecology <br /> • Washington Department of Fisheries <br /> • Washington Department of Wildlife <br /> • Washington Department of Labor & Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br /> Plant or the Wastewater Pollution Control Facility, Contractor shall comply with the <br /> requirements of the Washington Department of Labor & Industries for such work <br /> including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-75 <br />