My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Traffic Safety Commission 11/9/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
Washington Traffic Safety Commission 11/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 11:15:16 AM
Creation date
12/14/2020 11:14:39 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Traffic Safety Commission
Approval Date
11/9/2020
Council Approval Date
11/4/2020
End Date
9/30/2021
Department
Police
Department Project Manager
Tracey Landry
Subject / Project Title
Target Zero FFY 2021 HVE Program Agreement
Tracking Number
0002567
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30.4. If any WTSC property is lost, destroyed,or damaged,the SUB-RECIPIENT shall immediately notify <br /> the WTSC and shall take all reasonable steps to protect the property from further damage. <br /> 30.5. The SUB-RECIPIENT shall surrender to the WTSC all property of the WTSC upon completion, <br /> termination, or cancellation of this Agreement. <br /> 30.6.All reference to the SUB-RECIPIENT under this clause shall also include SUB-RECIPIENT's <br /> employees, agents,or sub-contractors. <br /> 31.WAIVER <br /> A failure by either Party to exercise its rights under this Agreement shall not preclude that Party from <br /> subsequent exercise of such rights and shall not constitute a waiver of any other rights under this Agreement. <br /> APPLICABLE CERTIFICATIONS AND ASSURANCES FOR HIGHWAY SAFETY GRANTS (23 <br /> CFR PART 1300 APPENDIX A): <br /> 32. BUY AMERICA ACT <br /> The SUB-RECIPIENT will comply with the Buy America requirement(23 U.S.C. 313)when purchasing <br /> items using federal funds. Buy America requires the SUB-RECIPIENT to purchase only steel, iron, and <br /> manufactured products produced in the United States, unless the Secretary of Transportation determines that <br /> such domestically produced items would be inconsistent with the public interest,that such materials are not <br /> reasonably available and of a satisfactory quality,or that inclusion of domestic materials will increase the cost <br /> of the overall project contract by more than 25 percent. In order to use federal funds to purchase foreign <br /> produced items,the WTSC must submit a waiver request that provides an adequate basis and justification, <br /> and which is approved by the Secretary of Transportation. <br /> 33.DEBARMENT AND SUSPENSION <br /> Instructions for Lower Tier Certification <br /> 33.1. By signing this Agreement,the SUB-RECIPIENT(hereinafter in this section referred to as the"lower <br /> tier participant") is providing the certification set out below and agrees to comply with the requirements of 2 <br /> CFR part 180 and 23 CFR part 1300. <br /> 33.2. The certification in this section is a material representation of fact upon which reliance was placed when <br /> this transaction was entered into. If it is later determined that the lower tier participant knowingly rendered an <br /> erroneous certification, in addition to other remedies available to the federal government,the department or <br /> agency with which this transaction originated may pursue available remedies, including suspension and/or <br /> debarment. <br /> 33.3. The lower tier participant shall provide immediate written notice to the WTSC if at any time the lower <br /> tier participant learns that its certification was erroneous when submitted or has become erroneous by reason <br /> of changed circumstances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.