Laserfiche WebLink
LOCATION DETAILS: Headquarters <br /> The following sections detail the configuration of the Axon Interview recording system at HEADQUARTERS <br /> Location Name Headquarters <br /> Cable Considerations <br /> Axon Professional Services will install the networking cables using a Cat6e Cable. <br /> Cabling Runs 6 cable runs are required for this installation. <br /> 6 110v power outlets are required for this installation(Customer Responsibility). <br /> All Devices: <br /> Network cabling must be provided for the following devices: <br /> Cabling •Axis IP Camera <br /> Requirements •Server <br /> •Touch Panel or PC running a virtual Touch Panel <br /> • POE Switch <br /> Servers, Switches, Touch Panels <br /> Axon Interview Lite Server 1 <br /> Servers Quantity: <br /> Axon Interview Lite Server 1 <br /> Redundancy This system includes recording redundancy <br /> HPE Aruba 2530 8-Port POE Switch 1 <br /> Data Switch/POE Power Quantity: <br /> N/A <br /> Touch Panels POS-X Touch Panel <br /> Touch Panel Location Wall mounted outside each room <br /> Number of I/O Boxes Required 0 <br /> Additional Location Notes <br /> Notes <br />