My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Timmons Group 12/4/2020
>
Contracts
>
6 Years Then Destroy
>
2025
>
Timmons Group 12/4/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 1:42:43 PM
Creation date
12/16/2020 12:26:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Timmons Group
Approval Date
12/4/2020
Council Approval Date
12/2/2020
End Date
12/31/2025
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Computerized Maintenance & Asset Mgmt (CMAMS)
Tracking Number
0002581
Total Compensation
$639,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Timmons Group Inc 2/16/2025 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Procurement Agreements
Timmons Group Inc. 11/8/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• On-site meetings will be dependent on travel policies regarding Covid-19 restrictions set by City of Everett, <br /> Timmons Group, and or States of Washington, Oregon, Virginia, Maryland and/or Louisiana depending on <br /> resources required. <br /> • If on-site meetings cannot occur, they will be replaced via virtual meetings <br /> Phase 1,Task 2:Estimated Timeframe: <br /> • Project Kick-off meeting should occur approximately 4 weeks after the project has been initiated <br /> Phase 1 Exit Criteria: <br /> • Bi-weekly Project Status Reports <br /> • A project collaboration portal will be setup for the duration of the project and for support after Go-live <br /> • Project Management Plan <br /> . Project Kick-off presentation & meeting minutes <br /> Phase 2: Cityworks Environment Preparation & Installation <br /> Phase 2, Task 3: Implementation Planning <br /> The goal of this task and its subtasks is to develop the IT System Architecture components of the System <br /> Design and Configuration (SD&C) Plan that consolidates the gathered existing IT system architecture <br /> data with requirements, and interface requirements that will be identified and modeled during the <br /> "Discovery" portion of the project. <br /> Phase 2, Task 3: City's Responsibility: <br /> • City's project manager assistance in scheduling necessary kickoff meetings. (4 FTE hours) <br /> • City's Information System stakeholder attendance/participation meeting. (4 FTE hours each attendee). <br /> Phase 2,Task 3:Timmons Group Responsibilities and Deliverables: <br /> • IT System Architecture document. <br /> Phase 2,Task 3:Assumptions: <br /> • City will provide the necessary information for connections to the City provided off-site Azure system <br /> environment. <br /> Phase 2,Task 3:Estimated Timeframe: <br /> • City provided off-site Azure environment should be available approximately 4 weeks after the project has been <br /> initiated <br /> Phase 2, Task 4: IT System Review <br /> Our implementation team will meet with the City's'project management team and IT/GIS staff to discuss <br /> hardware and environment requirements for the Cityworks implementation to include Cityworks Office, <br /> Respond and Mobile app. During this meeting, various system architectures and minimum requirements <br /> will be explored to ensure a stable implementation for the City. The goal is to ensure the off-site hosted <br /> environment is in place and that all related system and security policies are understood prior to initial <br /> software configuration. <br /> The implementation team will document the Core System Design Plan components required to support <br /> the Cityworks implementation. The Core System Design Plan is developed in preparation for the <br /> configuration and implementation of Cityworks. This plan will include the following: <br /> • Network Requirements • Hardware Requirements <br /> • Peripheral Requirements • Software Applications <br /> • Internal Security • DMZ <br /> • Access to externalized data • Mobile device requirements <br /> 15IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.