Laserfiche WebLink
(Onsite)Workshop 7 <br /> -Traffic 12 $1,660.00 $1,660.00 <br /> Data Gathering- <br /> Workshop 8 <br /> (Lighting): <br /> Preparation-WebX 6 $790.00 $790.00 <br /> (Onsite)Workshop 8 <br /> -Lighting 12 $1,660.00 $1,660.00 <br /> Data Gathering- <br /> Workshop 9(Parks): <br /> Preparation-WebX 6 $790.00 $790.00 <br /> (Onsite)Workshop 9 <br /> -Parks 16 $2,160.00 $2,160.00 <br /> Data Gathering- <br /> Workshop 10 <br /> (Engineering): <br /> Preparation-WebX 6 $790.00 $790.00 <br /> (Onsite)Workshop <br /> 10-Engineering 16 $2,160.00 $2,160.00 <br /> once weekly <br /> meetings during <br /> SD&C writing 72 $9,640.00 $9,640.00 <br /> Fit Analysis 60 $7,900.00 $7,900.00 <br /> Draft System Design <br /> and Configuration <br /> Plan 86 $11,270.00 $11,270.00 <br /> Finalize System <br /> Design and <br /> Configuration Plan 54 $7,110.00 $7,110.00 <br /> Edit System Design <br /> and Configuration <br /> Plan 38 $5,110.00 $5,110.00 <br /> sub-total 546 $72,930.00 $3,850.00 $76,780.00 <br /> 46' Page <br />