My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Floyd & Snider Inc. 12/4/2020 Amendment 9
>
Contracts
>
6 Years Then Destroy
>
2023
>
Floyd & Snider Inc. 12/4/2020 Amendment 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 12:39:27 PM
Creation date
12/16/2020 12:39:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Floyd & Snider Inc.
Approval Date
12/4/2020
Council Approval Date
12/2/2020
End Date
12/31/2023
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Consulting Svcs Everett Landfill/Riverfront
Amendment/Change Order
Amendment
Amendment/Change Order Number
9
Total Compensation
$511,332.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Grant Award Federal Emergency Management Agency (2)
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> 601 Union Street,Suite 600 <br /> F L O Y D I SNIDER Seattle,WA 98101 <br /> strategy • science - engineering tel:206.292.2078 fax:206.682.7867 <br /> Equipment Rates <br /> RATES <br /> Equipment Item Per Day Per Week <br /> Daily Use or Disposable Items <br /> Field Sampling Supplies, Tools, Disposables $35.00 NA <br /> Groundwater Filter(price per filter) $22.00 NA <br /> Safety Equipment <br /> Level D Safety Equipment per Person (gloves, hearing $10.00 $40.00 <br /> protection, first aid) <br /> Road Safety Barricades $5.00 $20.00 <br /> Air Sampling Equipment <br /> Photoionization Detector(PID) $85.00 $340.00 <br /> Water Sampling Equipment <br /> Submersible Pump (12v) $40.00 $160.00 <br /> Peristaltic Pump $65.00 $260.00 <br /> Water Level Tape $30.00 $120.00 <br /> Oil/Water Interface Probe $40.00 $160.00 <br /> LaMotte Turbidity Meter $35.00 $140.00 <br /> Hanna pH/Conductivity Probe $20.00 $80.00 <br /> YSI Pro DDS Multi-Parameter Water Quality Meter $120.00 $480.00 <br /> Data Acquisition Equipment <br /> Field Laptop Computer $30.00 $120.00 <br /> Pressure/Temp/Barometric Transducer/Dataloggers $65.00 $250.00 <br /> (per transducer) <br /> BarometricNacuum Sensor $5.00 $30.00 <br /> Tools <br /> Surveying Transit $20.00 $50.00 <br /> Stormwater Pole Sampler $15.00 $60.00 <br /> Rotohammer Drill $60.00 $180.00 <br /> Trimble GPS $100.00 $400.00 <br /> Field Vehicles Per Rental Period Per Half Day Per Full Day <br /> Cargo Van $75.00 $140.00 <br /> Notes: <br /> Field equipment needed for the project that is not included in this list will be purchased or rented and <br /> billed at equipment cost plus 10 percent. <br /> Several small items used in field efforts are considered part of our overhead costs and are not billed <br /> separately.The items on this list are not considered part of overhead costs. <br /> f/contracts/masters/FS Equipment Rate Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.