My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 BAKER AVE 2020-12-18
>
Address Records
>
BAKER AVE
>
2801
>
2801 BAKER AVE 2020-12-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 10:38:23 AM
Creation date
12/18/2020 10:37:43 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT forair <br /> City of Everett Permit Services <br /> Date Applied: 2/27/2018 <br /> Public Works Permit#: PW1802-040 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: C1710-016 <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $70.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> DIKO MARTIN DIKO MARTIN <br /> 2801 BAKER AVE 2801 BAKER AVE <br /> EVERETT, WA, 98201 EVERETT, WA, 98201 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00437865800100 SITE ADDRESS: 2801 BAKER AVE <br /> DESCRIPTION: FENCE IN RIGHT OF WAY <br /> Permit updated to reflect code changes since initial issuance. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. The fence shall not be located within the red hashed area on the site plan between California Street and the front of the <br /> SFR (per EMC19.39.070.B). <br /> 5. Fence shall be no greater than 36 inches in height within the 15ft sight triangles at the intersection of the roadway and <br /> the alley/intersecting roadway. <br /> 6. Protect all existing underground utilities during construction. Fence posts shall be at least 2ft away from any underground <br /> utility. Fence must be located behind existing water meter with full lid-opening capabilities. Access to water meter is required <br /> at all times. <br /> 7. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with all <br /> other inspection requests. See attached to request an inspection. <br /> 8. This fence constructed within the public right-of-way must be removed or relocated at the owner's expense if the City <br /> ever requires use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: (Paid on 3/2/2018) <br /> Misc. Minor Work(Pavers for walkway) $25.00 <br /> Fence in R.O.W(Grading with Wall Foundation as base of Fence) $25.00 <br /> PW Site Inspection $20.00 <br /> OUI 3 i 2018 r <br /> CITY OF EVERETT <br /> Permit Services <br /> at' of Everett OfficIal Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> /UDate mac$ maintenance of the improvement or other right-of-way use here to applied <br /> Approve. 'or onstruction (Publi Works) for and further agrees to remove same upon notice from the City and to <br /> replace public pro erty damaged thereby. <br /> lz^la r1 r 1�/ <br /> FINAL INSPE ON Date �� f `fl/ � 1°/3)�?z)(� <br /> Approved as C nstructed (PW Inspector) •nature of Applic nt Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> f/LC — UPPOrEo <br />
The URL can be used to link to this page
Your browser does not support the video tag.