Laserfiche WebLink
8/12/2020 City of Everett (Page <br /> 1 <br /> 7:53:05A <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1805-007 Site Address 2330 BAYVIEW PL <br /> Applied 5/11/2018 Applicant GIBSON RYAN Lot <br /> Approved 7/31/2018 Owner GIBSON RYAN T&BREANNA MILROY Block <br /> Issued 10/12/2018 Contractor HOME CARE CONTRACTORS LLC Tract <br /> Parent Permit No. Description 2ND FLOOR ADDITION WITH BATHROOM,DECK FOOTING <br /> Notes PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 11/1/2018 11/1/2018 BLDG DWF APPROVAL <br /> 02-FOOTING/SETS <br /> 11/1/2018 11/1/2018 BLDG DWF APPROVAL <br /> 03-FOUNDATION <br /> 11/1/2018 11/1/2018 BLDG04-UFER DWF APPROVAL <br /> GROUND <br /> 1/18/2019 1/18/2019 BLDG DWF APPROVAL As noted Phone:425-923-8077 <br /> 08-FRAMING <br /> (1/18/2019 1:16 PM DWF) <br /> Cleat rim joist splice areas as discussed <br /> with contractor,then ok to cover,sheeting. <br /> 3/19/2019 3/19/2019 BLDG DWF OTHER Framing consultation,contractor to provide <br /> 01-CONSULTATIO spec's for brackets as discussed for future <br /> inspection. <br /> 4/22/2019 4/22/2019 PLUMB SDP APPROVAL As noted (4/22/2019 2:25 PM SDP) <br /> 03-ROUGH IN If installing a tile shower,you will need to <br /> call for an inspection on the shower pan <br /> after the lining is installed and before tile, <br /> you will fill the shower enclosure with <br /> water up to the threshold,for a leak test,the <br /> inspector will witness this test. <br /> 5/3/2019 5/3/2019 BLDG DWF CORRECTION need to complete shear nailing. <br /> 07-EXTERIOR <br /> 5/20/2019 5/20/2019 GAS 01-ROUGH IN SDP - PARTIALAPPR PETER 425-923-8077 <br /> (520/2019 2:55 PM SDP) <br /> Gas piping methods and materials are ok. <br /> 1) I need to see a pressure test on the new <br /> pipe. <br /> 2)The CSST pipe in the kitchen wall must <br /> be protected with manufacturer nail plates <br /> or sleeved where it runs through the top and <br /> bottom plates,the protection must extend at <br /> least 6"past the plates. <br /> 5/20/2019 5/20/2019 MECH 04-ROUGH SDP APPROVAL HVAC PETER 425-923-8077 <br /> IN <br /> 6/6/2019 6/6/2019 GAS 01-ROUGH IN SDP APPROVAL AM Inspection requested <br /> 425-923-8077 Peter <br /> (6/62019 12:48 PM SDP) <br /> (6/62019 12:43 PM SDP) <br /> 1)nail plates for CSST are ok <br /> 2)I left an affidavit for the pressure test to <br /> be witnessed by the owner.We will pick up <br /> the affidavit at the final inspection. <br /> 6/13/2019 6/13/2019 BLDG DWF APPROVAL as noted contractor to install seismic straps post/ <br /> 08-FRAMING beam connection.and top plate,upstairs 2 <br /> locations,need studs added,then ok to <br /> cover. <br /> INSPl2 CAWS YSTEMS <br />