Laserfiche WebLink
M i <br /> CITY of EVERETT <br /> PLANNING and COMMUNITY DEVELOPMENT �/E V1 /9 <br /> _ <br /> ACCESSORY DWELLING UNIT CHECKLIST ' ` <br /> -*Instructions:Submit this checklist with either your building permit application (Review Process I), or <br /> with your Accessory Dwelling Unit(Review Process II) application,in order to apply for an attached or <br /> detached ADU.The proposal must meet Everett Municipal Code 19.7.030,Accessory Dwelling Units and <br /> any other setback or other zoning regulations.Note: This checklist only addresses zoning code <br /> regulations for ADUs and does not address building code or other site development codes. <br /> Column to be completed by <br /> J/ Applicant.�. <br /> 1) I Fees.See current Fee Schedule for eview Process r II. Total Fee: - / - <br /> This fee does not include building permit fees or system f.�G p�• l an6 ,S(G�/d <br /> development fees. Please speak with a Permit Technician -e min m ,QI,evjd(,(c <br /> at 425-257-8810 opt 8 to understand all fees involved to reel t/V)� <br /> ,add an ADU to your property. <br /> 2) G Where are ADUs Permitted? Zone of Property: .t <br /> An ADU shall be permitted as an accessory use to the Historic Overlay: N/A- <br /> principal dwelling unit in the zones indicated in Use Table <br /> #5.1 on any legally established lot.ADUs are permitted in <br /> the following zones: A-1,R-S,R-1 or R-2. <br /> 3) H/Is your application a Review Process 1 or II? Chh k one: <br /> Review Process I.An ADU shall be processed with your ICJ Review Process I.Complete this <br /> building permit application if no modification of the checklist and include it with your <br /> standards are requested. building permit submittal. <br /> Review Process II. If requesting a modification from any of <br /> the standards listed below,the application shall be ❑ Review Process II. Complete <br /> processed as a Review Process II. this checklist and include it with <br /> Review Process 11 modification of standards include: your Review Process II application <br /> a) Waiver of off-street parking(see#6). before submitting for your <br /> b)Reduction of rear setback for non-alley DADUs(see#10). building permit. Use the <br /> d)Exceed 18ft in height for non-alley DADUs(see#11). application titled,"Accessory <br /> e)Increase in allowable lot coverage by building(see#12). <br /> Dwelling Unit Application (Rev II)". <br /> f)Modification of design standards(see#13). <br /> 4)HAI Owner Occupancy Required. Attach the following documents to <br /> Either the principal dwelling unit or the ADU shall be your application: <br /> occupied by the owner of the property as his or her ❑ 1) Complete and attach the <br /> principal residence. Prior to issuance of a permit for an Owner Occupancy Certificate form. <br /> accessory dwelling unit,the property owner shall submit A new certificate is due on April 1st <br /> to the City a signed affidavit affirming that the owner of each year. <br /> occupies the principal dwelling as his or her principal ❑2)Complete and attach the <br /> residence,and will occupy either the principal dwelling or Accessory Dwelling Unit Covenant. <br /> accessory dwelling after completion of the accessory Do NOT record document until <br />