Laserfiche WebLink
• <br /> • <br /> • �' <br /> • <br /> • with the sewer where both flows will be conveyed through a 12"pipe and finally into the existing storm-sewer <br /> system manhole located in 32"d and Broadway Ave. <br /> • The proposed project will have 0.44 acres of replaced impervious surface and 0.32 of new impervious area for a <br /> • total of 0.76 acres of impervious in one threshold discharge area.See Appendix 4 for developed site hydrology <br /> • calculations and design. <br /> • SECTION 4: CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br /> • <br /> • Less than 1 acre of land will be disturbed for this project,and it is not part of a larger common plan of <br /> • development or sale that disturbs an acre of more of land.The requirements for a Small Parcel Pollution <br /> Prevention Plan are: <br /> 1. Provision of a construction access route located on the north side of the project site on 32"d Ave. See <br /> • construction entrance on sheet EC-01 in the construction documents. <br /> . 2. Stabilization of denuded areas. Filter fence and catch basin inserts will be used. See sheets EC-01 and EC- <br /> 01 in the construction documents. <br /> • 3. Protection of adjacent properties. Silt fence will be used to retain silt on the site. See Sheets EC-01 and <br /> • EC-02 in the construction documents.The project will involve excavating below the surrounding areas to <br /> • provide parking under the building.Water that does not infiltrate will be pumped into a baker tank on site <br /> and for settlement prior to release or hauled away and disposed of. <br /> - 4. Maintenance of erosion and sediment control BMP's.The contractor will be responsible for maintaining <br /> • BMP's. See General TESC Notes on sheet EC-01. <br /> • SECTION 5: SOURCE CONTROL PLAN <br /> • See Activity Worksheet(from Chapter 2 of Volume IV, Figure 1.1)Appendix 6 Activity Worksheet. <br /> • <br /> • Activity:A1.2(cleaning or washing of cooking equipment)This will occur inside the building with no chance of <br /> stormwater contamination. <br /> • <br /> • Activity:A4.4(temporary storage or processing of fruits or vegetables)This will occur inside the building with no <br /> chance of stormwater contamination. <br /> • <br /> • Activity:A4.4(storage of solid wastes and food wastes)This will occur inside the building with no chance of <br /> • stormwater contamination. <br /> • Activity:A4.9(parking and storage for vehicles and equipment)All parking will be in covered areas not subject to <br /> • rainfall. Underground parking areas will have a drain connected to the sanitary sewer. <br /> • SECTION 6: SPECIAL REPORTS AND STUDIES <br /> • A Geotechnical Engineering Study was done for the site. See the Geotechnical Report provided by Earth Solutions <br /> • NW, LLC,Appendix 5. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> a <br /> • Broadway Apartments 7 of 9 Storm water Site Plan <br /> • <br /> • <br />