I • <br /> = American Property Development ES-0599.06 <br /> January 22, 2015 Page 5 <br /> • Updated June 9, 2016 <br /> • <br /> • With respect to adjacent property surcharge loading on the shoring system, further assessment <br /> • of adjacent building structures and foundation elevations relative to the shoring system and <br /> foundation walls will be needed, as appropriate, based on the final siting and design finish floor <br /> • elevation of the building. For purposes of this study, we have provided preliminary surcharge <br /> • values for design of temporary shoring and permanent foundations walls, as appropriate. <br /> • As previously, discussed, localized zones of groundwater seepage could be encountered. As <br /> • such, groundwater seepage could be encountered in the proposed excavation which is <br /> anticipated to be advanced to depths of approximately 18 to 25 feet below existing grades. The <br /> • presence of groundwater seepage in deeper utility excavations should also be anticipated. <br /> • <br /> al This geotechnical engineering study has been prepared for the exclusive use of American <br /> ' Property Development and their representatives. The study has been prepared specifically for <br /> the subject project. No warranty, expressed or implied, is made. This study has been prepared <br /> • in a manner consistent with the level of care and skill ordinarily exercised by other members of <br /> • the profession currently practicing under similar conditions in this area. <br /> • Site Preparation and Earthwork <br /> • <br /> • The primary geotechnical considerations with respect to earthwork are related to the proposed <br /> • building's excavation, temporary slope construction, temporary excavation support, and <br /> foundation subgrade preparation. The soils encountered in the building excavations should <br /> • <br /> largely consist of dense to very dense silty sand deposits. These soils should generally be <br /> • suitable for use as structural backfill, where needed. The native soils can be characterized as <br /> • having a generally moderate sensitivity to moisture. Therefore, if the soils are exposed to <br /> • excessive moisture, successful placement and compaction of the soil may be difficult. <br /> • Excavations <br /> As excavation of the proposed building progresses, the soil relative density should generally <br /> increase and is expected to exhibit good stability in open cut excavations. Overall stability of <br /> • the excavation is anticipated to be good, provided appropriate means for sloping and shoring <br /> • the excavation are utilized. Based on the soil conditions observed at the test sites, the <br /> • following allowable temporary slope inclinations can be used: <br /> • • Upper 4 Feet of Excavation 1 H:1 V (Horizontal:Vertical) <br /> • <br /> • • Below 4 Feet 0.5H:1V to 0.75H:1V <br /> • The geotechnical engineer should observe the excavation and assess the allowable temporary <br /> slope inclination based on the soil and groundwater conditions exposed in the excavation. <br /> • Supplement recommendations for sloping the excavation may be made by the geotechnical <br /> • engineer based on conditions observed. <br /> • <br /> With respect to temporary shoring, recommendations are provided in the Shoring <br /> Recommendations section of this study. <br /> • Earth Solutions NW, LLC <br /> • <br /> • <br />