Laserfiche WebLink
f i <br /> IllC $� i <br /> i <br /> TABLE OF CONTENTS <br /> Construction Stormwater Pollution Prevention Plan <br /> Cover Sheet 1 <br /> 0 <br /> Table of Contents 2 i <br /> Construction Stormwater Pollution Prevention Elements 3 i <br /> Objective of the Stormwater Pollution Prevention Plan 3 i <br /> Summary of the Elements 3 i <br /> Element#1 —Mark Clearing Limits 3-4 II <br /> Element#2—Establish Construction Access 4 - <br /> Element#3—Control Flow Rates 4 - <br /> Element#4—Install Sediment Controls 4 i <br /> ElementStabilize#5— Soils 4-5 <br /> Element#6—Protect Slopes 5 i <br /> Element#7—Protect Drain Inlets 5 411 <br /> Element#8—Stabilize Channels and Outlets 5 i <br /> Element#9—Control Pollutants 6 i <br /> Element#10—Control Dewatering 6 i <br /> Element#11—Maintain BMPs 6-7 i <br /> Element#12—Manage the Project 7 i <br /> Project Description 8 - <br /> Location 8 <br /> Project Overview 8 i <br /> Existing Site Conditions 8 i <br /> Existing Drainage System 8 i <br /> Existing Topography and Vegetation 8 i <br /> Adjacent Areas 8 i <br /> Critical Areas 8 i <br /> Soils 8 i <br /> Erosion Problem Areas 8 <br /> II <br /> Construction Phasing 9 i <br /> Construction Schedule 9 <br /> Financial/Ownership Responsibilities 9 i <br /> Engineering Calculations 9 i <br /> Site Plan 9 i <br /> References 9 s <br /> Appendices - <br /> Appendix A—Site Plan i <br /> Appendix B—Construction BMPs i <br /> i <br /> i <br /> Broadway Apartments 2 of 9 Construction SWPPP i <br /> i <br /> 411 <br />