Laserfiche WebLink
CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> Maintenance Standards <br /> 1. Inspect the area frequently to make sure flagging remains in place and the area remains <br /> undisturbed. <br /> _) <br /> 3.2.3 BMP C103: High Visibility Plastic Fence <br /> J Purpose <br /> Fencing is intended to: (1)restrict clearing to approved limits; (2) prevent disturbance of sensitive areas, <br /> • their buffers, and other areas required to be left undisturbed; (3) limit construction traffic to designated <br /> • construction entrances or roads;and(4)protect areas where marking with survey tape may not provide <br /> adequate protection. <br /> Conditions of Use <br /> • To establish clearing limits plastic fence may be used: <br /> • • At the boundary of sensitive areas,their buffers, and other areas required to be left uncleared <br /> ID <br /> • As necessary to control vehicle access to and on the site. <br /> • <br /> • Design and Installation Specifications <br /> • 1. High visibility plastic fence shall be composed of a high-density polyethylene material and shall <br /> be at least 4 feet in height. Posts for the fencing shall be steel or wood and placed every 6 feet on <br /> • center(maximum) or as needed to ensure rigidity. The fencing shall be fastened to the post every <br /> • 6 inches with a polyethylene tie. On long continuous lengths of fencing, a tension wire or rope <br /> • shall be used as a top stringer to prevent sagging between posts. The fence color shall be high <br /> visibility orange. The fence tensile strength shall be 360 pounds/feet using the American Society <br /> • for Testing and Materials (ASTM) D4595 testing method. <br /> • 2. Fences shall not be wired or stapled to trees. <br /> • Maintenance Standards <br /> • 1. If the fence has been damaged or visibility reduced, it shall be repaired or replaced immediately <br /> • and visibility restored. <br /> • 3.2.4 BMP C105: Stabilized Construction Entrance <br /> • Purpose <br /> • Construction entrances are stabilized to reduce the amount of sediment transported onto paved roads by <br /> • vehicles or equipment by constructing a stabilized pad of quarry spalls at entrances to construction sites. <br /> • Conditions of Use <br /> • Construction entrances shall be stabilized wherever traffic will be leaving a construction site and traveling <br /> • on paved roads or other paved areas within 1,000 feet of the site. <br /> • On large commercial,highway,and road projects,the designer should include enough extra materials in <br /> • the contract to allow for additional stabilized entrances not shown in the initial C-SWPPP. It is difficult <br /> to determine exactly where access to these projects will take place; additional materials will enable the <br /> • contractor to install them where needed. <br /> - <br /> • <br /> • <br /> • <br /> • Volume 11—Construction Stormwater Pollufion Prevention <br /> 3-4 <br /> - <br /> - <br />