Laserfiche WebLink
PUBLIC WORK <br /> Item F Unit Quantity:' Unit tice I Amount <br /> Construction Storm Drainage <br /> Temporary Silt Fence L.F. 5.00 <br /> Grading for drainage swales L.F. 2.00 <br /> Other <br /> Other <br /> Construction Storm Drainage Total S <br /> Clearing &Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. 12.00 <br /> Total grading/cut/fill C.Y. See EMC <br /> (total earth moved) 13.80.010 <br /> Clearing and Grading Total: S <br /> (0)/0 <br /> COST EST FEE CALL-2017 <br />