Structural <br /> Follow-up Comments from Correction Notice 1 (Number corresponds to previous numbering from <br /> Correction Notice 1). <br /> 2. From the response to the comment, the Engineer of Record determined concrete podium <br /> structure to have an extreme torsion horizontal irregularity. Per ASCE 7-10 Sec 12.3.4.2, <br /> the redundancy factor of p = 1.3 is required to be applied to earthquake design forces for <br /> the design of lateral force resisting elements. Please revise forces and verify with <br /> supporting design calculations that the elements can withstand the increased demands. <br /> 5. It appears that the 9-factor for shear wall dowels and diaphragms were 0.75 on pages A59 <br /> and A60. Per ACI 318-14 Sec 21.2.4.1, a 9-factor of 0.6 is required unless the nominal <br /> shear capacity of the walls is greater than the shear corresponding to the development of <br /> the nominal moment capacity of the shear walls. Please indicate which 9-factor was used <br /> in the design of concrete shear walls as it is not clear in the design calculations provided. <br /> Also, please revise the 9-factors accordingly per ACI 318 -14 Sec 21.2.4.2 for the <br /> diaphragm if the 9-factor for the shear design of the shear walls have been updated. <br /> 6. The response to the comment regarding using a perforated shear wall design indicates <br /> that a solid wall has a series of openings punched through solid wall. These walls, being <br /> part of the seismic force resisting system, are intended to be considered special concrete <br /> shear walls and subject to the provisions of ACI 314 18.10. These walls have individual <br /> wall piers between openings and beam-like elements that form above and below the <br /> openings. These wall piers and beam elements in the shear walls are subjected to the <br /> strength and detailing provisions per ACI 318-14 Sec 18.10.7 for coupling beams and Sec <br /> 18.10.8 for wall piers where the required, even if they are viewed as perforated walls. If <br /> these perforated walls are not intended to contain detailing for individual wall piers and/or <br /> coupling beams, it is assumed that the solid wall elements spanning floor-to-floor are <br /> acting as shear walls. Please clarify and provide calculations and detailing for these wall <br /> piers or beam elements or indicate where full-height shear walls occur. Please update <br /> drawings, details, and shear wall calculations as required. <br /> New Comments: <br /> 10.Along Grid F between Grid 4 and Grid 10, there appears to be a discontinuous shear wall <br /> condition between levels 1 and 2, please provide calculations indicating how overturning <br /> forces are resolved due to the discontinuity. Please verify the load path for resolving the <br /> overturning moment developed at the level 2 shear wall from the story shear imposed at <br /> level 3. If columns located at the shear wall discontinuity are intended to resolve the force <br /> couples, please apply the overstrength, Q, factor for the design of these columns and beam <br /> elements (if applicable) per ASCE 7-10 Sec 12.3.3.3. Please provide diaphragm strength <br /> checks for transfer of shear out of the discontinuous shear wall and through the walls <br /> located below level 1. <br /> 11. Please provide calculations for diaphragm force checks per ASCE 7-10 Sec 12.10. Please <br /> indicate in the design calculations which design force governed in the design of the <br /> diaphragm. <br /> .!e 2of3 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8857 <br />