Laserfiche WebLink
32 Everett Apartment REVISION#1 <br /> Project: 32 Everett Apartment <br /> Addenda date: 10/29/2018 <br /> From the office of: American Property Development, Inc. <br /> 110— 110`h Ave NE, Suite 550 <br /> Bellevue,WA 98004 <br /> NOTICE TO ALL CONTRACTORS, SUBCONTRACTORS AND SUPPLIERS <br /> This revision #1 modifies the original Issue for Construction. The drawings have been <br /> "clouded" and had a Delta#1. This revision is issued to clarify, revise, add or delete <br /> from the original Issue for Construction. <br /> Sheet# Description Reason for Change <br /> CS-1 Updated drawing index for Architectural and Coordination <br /> Plumbing <br /> A3.1, • Remove smoke door from north& south elevator. RFI#46 <br /> A3.la, • Keynote#15 revised. <br /> A3.lb <br /> A3.2, Revised REC area: Design revision, <br /> A3.2a, • Coffee/Cafe layout revised with appliance locations. RFI#46 <br /> A3.2b, • All rooms (Manager Office, restrooms, storage, etc.) <br /> A3.2d along west side move south to make more room for <br /> mail/package area. <br /> • Add the water heater closet. <br /> • Add detail callouts <br /> • Remove smoke door from north& south elevator. <br /> • Keynote#19,21, 29, 30 revised and add. <br /> • Electric Vehicle charging outlet symbol adds to <br /> plan. <br /> A3.2c Revise RCP layout at REC area. Design revision <br /> • Match RCP to the revised plan. <br /> • Keynote#2, 3, 4, 10, 11, 12 revised and add. <br /> A3.2e Revised Communication Plan Design revision <br /> A3.3, • Revise garage entrance gate to coiling door. Design revision& <br /> A3.3a, • Add extend of interior space below and 5' RFI#6, 46 <br /> A3.2b extend with dash line to show the extend of <br /> waterproofing at the 2 d-floor concrete deck. <br /> • Add keynotes. <br /> • Remove smoke door from north&south <br /> elevator. <br /> • Electric Vehicle charging outlet symbol adds to <br /> 10/30/2018 Page 1 of 6 <br /> 3:39:00 PM <br />