Laserfiche WebLink
• Detail W9 &W9a revised to match structural. <br /> A7.3 • Add section#14—coiling door. Design revision, <br /> • Revise section#20—add metal security grill. RFI#44 <br /> • Revise section detail#2, 3, 10, 12—to match new <br /> lobby design. <br /> • Entry mat @ section#10 revised to owner <br /> provide/owner install item. <br /> A7.4 • New Trellis details added(#6, 9,17, 18). Design revision <br /> • New drain section added(#19). <br /> • New Floor outlet detail added (#20). <br /> • New blocking detail added(#8). <br /> • New control joint detail added (#12). <br /> • New interior wall to exterior wall detail added <br /> (#16). <br /> A7.6 • Revised waterproofing around elevator pit is added Design revision <br /> (#8 &20) <br /> A7.11 • Revised roof truss insulation. Design revision <br /> • Add metal cap outline profile diagram. <br /> A7.12 • Add frame over deck access door detail. Design revision <br /> A8.1, • New interior elevations added for REC &public Design revision <br /> A8.la access area. <br /> A8.2 • New coffee/kitchen cabinet details added(2,4, 10, Design revision <br /> 18). <br /> • Revised&add mailbox section details to match the <br /> current mailbox layout(8,12). <br /> • Revised and add fireplace section details to match <br /> the current lobby design(16, 20). <br /> A8.3 • Add a new kitchen accessible cabinet detail (1A). Design revision <br /> • Revised all countertop surface and backsplash to <br /> quartz. <br /> • Add typical elevation at the closet shelving and <br /> cable box. <br /> A9.1 • Revise door type C with more information. Design revision <br /> • Revise door#207. <br /> A9.2 • Revise Storefront types to match the current lobby Design revision <br /> design. <br /> A9.3 • Revised Storefront Head& Sill detail (#7). Design revision <br /> • Revised Coiling door head detail(#19). <br /> A9.4 • Revised lobby finishes per new design Design revision, <br /> • Revised Room finish schedule. RFI#39,44 <br /> • Add carpet and paint list schedule. <br /> A9.5 • New typical unit floor corridor finishes layout with Design revision <br /> carpet and paint schedule. <br /> A10.2 • Revised and add column details (#7). Design revision <br /> • Add column details at wood soffit over the kitchen <br /> 10/30/2018 {Page 3 of3 0 6 <br /> 3:39:00 PM <br />