My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
>
Address Records
>
BROADWAY
>
3214
>
BROADWAY KINECT APARTMENTS
>
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 2:35:27 PM
Creation date
12/18/2020 2:52:33 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
BROADWAY KINECT APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 Everett Apartment REVISION#10 <br /> Project: 32 Everett Apartment <br /> Addenda date: 2/25/2019 <br /> From the office of: American Property Development, Inc. <br /> 110— 110`s Ave NE, Suite 550 <br /> Bellevue, WA 98004 <br /> NOTICE TO ALL CONTRACTORS,SUBCONTRACTORS AND SUPPLIERS <br /> This revision#10 modifies the original Issue for Construction. The drawings have been <br /> "clouded" and had a Delta#10. This revision is issued to clarify, revise, add or delete <br /> from the original Issue for Construction. <br /> Sheet# Description Reason for Change <br /> A3.2, • Revised northeast corner of the building. Room Design revision, <br /> A3.2a, layout has been revised to move the Fire control <br /> A3.2c, room to the north,Add Boiler room, then Electrical <br /> A3.2d room, Storage& Second lobby. <br /> A3.3, • Move the Meter Room#2 (northeast) to the north of Design revision <br /> A3.3a the column (grid 11,E) to make room for a future <br /> booster pump. <br /> • Revised Transformer vault and switchgear/meter <br /> room#1 at the northwest corner. <br /> A3.4, • Revised and add mechanical/electrical shafts in the Design revision, <br /> A3.4a, corridor. RFI#104 <br /> A3.4b, • Revised coordinator base from wood base to rubber <br /> A3.4c, base. <br /> A3.5, <br /> A3.5a, <br /> A3.5b <br /> A4.1 • Revised mechanical shaft location& size per plan Design revision, <br /> below. RFI# 32 <br /> • Add dimensions to all roof shaft and equipment <br /> location. <br /> • Add roof access door(graphic) at north stair. <br /> A5.1, • Revised all windows on the elevation. Design revision, <br /> A5.2, • Revised Juliet balcony doors as a slider. RFI#36,#81 <br /> A5.3, • Add concrete horizontal chamfers on the elevation. <br /> A5.4, • Add MEP openings and location on the concrete <br /> A5.5 walls. <br /> A7.8, • Revised steel stair to wood stair with the center Design revision, <br /> A7.9 wall. RFI#67 <br /> 2/28/2019 L Page 1 of <br /> 11:33:25 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.