My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
>
Address Records
>
BROADWAY
>
3214
>
BROADWAY KINECT APARTMENTS
>
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 2:35:27 PM
Creation date
12/18/2020 2:52:33 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
BROADWAY KINECT APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 5. Revised stud rails at grids 7D and 8D. <br /> 6. Several wall revisions were made along gridlines F <br /> and 12. <br /> S 1.02C 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. _ <br /> S 1.02D 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Made floor plan and slab elevation revisions per <br /> architectural revisions. <br /> 4. Reinforcing around crane opening was revised due <br /> to required larger opening in slab. <br /> S 1.02E 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Revised top reinforcing at various locations. <br /> Si.02F 1. Revised stairs to wood stairs. Per revised arch. <br /> 2.Revised elevator shaft size. <br /> 3.Made floor plan and slab elevation revisions per <br /> architectural revisions. <br /> 4. Reinforcing around crane opening was revised due <br /> to required larger opening in slab. <br /> 5. Revised top reinforcing at various locations. <br /> S 1.03 1. Revised stairs to wood stairs. Per revised arch. <br /> 2.Revised elevator shaft size. <br /> 3. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 4. Revised canopy framing along gridline F <br /> 5. Made floor plan changes between gridlines l0&12 <br /> and A&B. <br /> 6. Several wall revisions were made along gridlines A, <br /> F and 12. <br /> S 1.03A 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 4. Revised stud rail at grids 2&B <br /> 5. Several wall revisions were made along gridlines A <br /> and F. <br /> S 1.03B 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 4. Revised canopy framing along gridline F <br /> 5.Made floor plan changes between gridlines 10&12 <br /> and A&B. <br /> 6. Revised stud rails at grids 8&F, 10&B and l l&B. <br /> 3/4/2019 I Page 2 of 6' <br /> 2:07:29 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.