Laserfiche WebLink
4. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 5. Revised stud rails at grids 7D and 8D. <br /> 6. Several wall revisions were made along gridlines F <br /> and 12. <br /> S 1.02C 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. _ <br /> S 1.02D 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Made floor plan and slab elevation revisions per <br /> architectural revisions. <br /> 4. Reinforcing around crane opening was revised due <br /> to required larger opening in slab. <br /> S 1.02E 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Revised top reinforcing at various locations. <br /> Si.02F 1. Revised stairs to wood stairs. Per revised arch. <br /> 2.Revised elevator shaft size. <br /> 3.Made floor plan and slab elevation revisions per <br /> architectural revisions. <br /> 4. Reinforcing around crane opening was revised due <br /> to required larger opening in slab. <br /> 5. Revised top reinforcing at various locations. <br /> S 1.03 1. Revised stairs to wood stairs. Per revised arch. <br /> 2.Revised elevator shaft size. <br /> 3. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 4. Revised canopy framing along gridline F <br /> 5. Made floor plan changes between gridlines l0&12 <br /> and A&B. <br /> 6. Several wall revisions were made along gridlines A, <br /> F and 12. <br /> S 1.03A 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 4. Revised stud rail at grids 2&B <br /> 5. Several wall revisions were made along gridlines A <br /> and F. <br /> S 1.03B 1. Revised stairs to wood stairs. Per revised arch. <br /> 2. Revised elevator shaft size. <br /> 3. Center of Tower Crane was revised due to required <br /> larger opening in slab. <br /> 4. Revised canopy framing along gridline F <br /> 5.Made floor plan changes between gridlines 10&12 <br /> and A&B. <br /> 6. Revised stud rails at grids 8&F, 10&B and l l&B. <br /> 3/4/2019 I Page 2 of 6' <br /> 2:07:29 PM <br />